CyrusOne

CyrusOne

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
CyrusOne LON6 Data Centre Campus 210MW Iver Heath UK Seven Hills Road, Iver Heath, Buckinghamshire SL0 0PA, United Kingdom (Historic site adjacent to Shannon Training 2032 Approved / Planning Granted 210.0 MW Gross Utility Power Allocation
CyrusOne LON1 9MW Data Center Slough United Kingdom Slough Trading Estate, 12 Liverpool Road, Slough, SL1 4QA, United Kingdom Q4 2018 Operational / Colocation & Enterprise Cloud Hub 15.0 MVA Total Utility Power Allocation
CyrusOne Slough Campus 36MW Data Center United Kingdom 225B & 225C Bath Road, Slough, SL1 5PP, United Kingdom Q4 2023 Operational / Hyperscale & Enterprise Colocation Campus 54.0 MW Dedicated Utility Power Allocation
CyrusOne CHI6 Wood Dale 460 480 Bryn Mawr Ave Illinois Hyperscale 480 Bryn Mawr Ave, Wood Dale, IL 60106, USA Q4 2027 Operational / Active Hyperscale Campus Phase 18.0 MW Initial / 40.0 MW Total Campus Power Interconnect
CyrusOne NVA Broadlands Campus Data Center Ashburn Loudoun County 180MW AI Intersection of Education Ct and Broadlands Blvd (near Dulles Greenway), Ashburn, Loudoun County, VA 20148, USA Q4 2030 Under Development / Master Planning & Site Preparation 180.0 MW Contracted Utility Power Capacity
CyrusOne FRA4 Frankfurt Data Center Sossenheim – 11 MW Wilhelm-Fay-Straße 58, 65936 Frankfurt am Main, Germany Q4 2021 (Full 11 MW critical load operational across 4 floors) Fully Operational 15 MW utility grid supply
CyrusOne Fairfield Data Center Campus Freestone Energy Center FM 488 Freestone County Texas Adjacent to Freestone Energy Center, 1366 FM 488, Fairfield (Freestone County), TX 75840, United States Q4 2029 Under Construction Phase (Groundbroken Mid-2026) 760.0 MW Gross Power Allocation / 600.0 MW Critical IT Power Load
CyrusOne DFW17C Whitney Data Center Campus Hill County Texas CyrusOne 557 County Rd 3610, Whitney, TX 76692, United States Q4 2028 Under Construction 110 MW Gross Utility Power Capacity
CyrusOne SAT1 San Antonio 9MW Enterprise Colocation 9999 Westover Hills Blvd, San Antonio, TX 78251, USA Q2 2013 Operational 9 MW Critical Power Capacity (Scalable to 20 MW)
CyrusOne Austin Campus Metropolis Drive 27MW Data Center 7100 Metropolis Drive & 7301 Metropolis Drive, Austin, TX 78703, USA Q2 2016 Operational 27 MW Gross Utility Power Capacity
CyrusOne San Antonio Omicron Campus 54MW Data Center 14719-14815 Omicron Dr, San Antonio, TX 78245, USA Q2 2025 Operational 54 MW Gross Utility Power Capacity
CyrusOne SAT14A Castroville Data Center 90MW Campus 3397 US Hwy 90 W, Castroville, TX 78009, USA Q2 2028 Under Construction 90 MW Utility Power Capacity
CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area) 2026–2027 (Building 2 & Final AI High-Density Expansion) Operational / Active Phased Development & Expansion 54 MW Total Critical IT Load (27 MW per building) / 90 MVA Grid Capacity
CyrusOne Kincora Sterling: 84MW Northern Virginia Hyperscale Hub 21111 Ridgetop Circle & 21350 Pacific Blvd, Sterling, VA 20166, USA Operational (Multi-building campus expansion active) Operational / Active Expansion 84.0 MW IT load / 96.0 MW gross utility design capacity
Milan CyrusOne MIL2 54MW Hyperscale Data Center Via Raffaele Rubattino no. 90, 20134, Milan, Italy Q4 2028 Under Development / Planning 90 MVA Dual Active High-Voltage Supply Allocation
CyrusOne FRA7 Frankfurt Westside Campus Griesheim (West of Frankfurt), Germany Expected completion in phases over several years. Under Construction 126 MW
CyrusOne DFW10: $1.2B Co-Located Hyperscale Campus 557 County Rd 3610, Whitney, TX 76692 2027–2028 (Phased 5-Building Rollout) Under Construction (Topping Out Milestone: March 2026) 400 MW Maximum Dedicated Delivery (190MW Initial Phase PPA)
CyrusOne AMS1: 54MW Hyperscale Amsterdam-Gateway Campus Linieweg 1, 1165 AA Halfweg (Haarlemmerliede) Ongoing / 2025-2026 Live / Operational (Active AI-Density Modernization) 54 MW IT Load (27 MW Dedicated per Building)
CyrusOne MIL1: 27MW Eco-Sovereign Data Center Milan Via delle Regioni, Segrate, Lombardy Late 2028 Under Construction (Groundbreaking March 25, 2026) 35 MW Total Utility Connection
CyrusOne Freestone: 760MW AI-Ready Powered Land Texas Freestone County (near Fairfield, TX) 2027 Active Development / Construction Prep 760 MW Total (Two 380MW Phases)