AirTrunk TOK2 West Tokyo Data Center: 110MW Hyperscale & AI Hub |
West Tokyo, Tokyo Prefecture, Japan |
Active Multi-Phase Development (Targeting 110+ MW Total) |
Operational & Active Phased Expansion |
110+ MW Secured Utility Power Allocation |
|
|
AirTrunk MEL1 Melbourne West Data Center Campus: 185MW+ Hyperscale Hub |
176 Swann Drive, Derrimut, VIC 3030, Australia |
Operational Active Campus Expansion |
Fully Operational / Active Phased Expansion |
185+ MW Secured Utility Power Capacity Allocation |
|
|
AirTrunk MEL3 Melbourne Data Center: Hyperscale AI Infrastructure Hub |
Northwest Melbourne Metropolitan Corridor, Victoria, Australia |
Targeted 2029–2030+ |
Planning / Land Acquisition & Pre-Development |
~300 MW – 400+ MW Scalable Utility Power Capacity |
|
|
AirTrunk JHB4 Johor Bahru Data Center Campus |
5.59-hectare campus, Iskandar Puteri, Johor Bahru, 79200 Johor, Malaysia |
2030 (Phased commissioning across all 8 planned data halls) |
Under Development / Announced |
142+ MW gross utility design capacity |
|
|
AirTrunk JHB2 Johor: 270MW Malaysia AI Campus |
11-hectare (27-acre) campus, Iskandar Puteri, Johor Bahru, 79200 Johor, MalaysiaUnder Development / Announced |
2030 (Phased commissioning across multi-hall layout) |
Under Development / Announced |
270+ MW gross utility design capacity |
|
|
AirTrunk JHB3 Johor: 138MW Malaysia AI Campus |
5.4-hectare campus, Iskandar Puteri, Johor Bahru, 79200 Johor, Malaysia |
2029 (Phased commissioning across all 8 planned data halls) |
Under Development / Announced |
138+ MW gross utility design capacity |
|
|
AirTrunk Raigad 3GW Hyperscale Data Center Campus |
Raigad Pen Growth Centre, Pen Taluka, Maharashtra, India |
2032-2035 (Continuous phased growth) |
Pre-Construction / Land Allotment Phase (Letter of Intent signed) |
3,000 MW total planned campus footprint |
|
|
AirTrunk Maharashtra Campus: 3GW Western India AI Hub |
Strategic Hyperscale Industrial Corridor, Maharashtra, India |
Late 2034 (Complete realize of the multi-building gigawatt masterplan expansion) |
Pre-construction / Site Engineering (Announced July 2026) |
3,000 MW (3 GW) ultimate secured substation grid allocation |
|
|
Humain & AirTrunk Riyadh | High-Performance Hyperscale Cloud & AI Facility |
Riyadh, Saudi Arabia |
Est. 2028+ (Staged approach based on Hyperscaler demand) |
Pre-development/Planning Phase |
Initial Phase 100 MW+ (Anticipated) |
|
|
AirTrunk OSK2 Infrastructure in East Osaka |
East Osaka, Kansai Region, Japan |
2027 |
Live / Operational (Initial Phase) |
110 MW (High-Density ready) |
|
|
AirTrunk JHB1 Johor Bahru |
Jalan Johor Jaya, Johor Bahru, Malaysia |
Expected 2027 |
Operational (Phase 1) / Expanding |
150 MW Total Campus Capacity |
|
|
AirTrunk MEL2 - Melbourne North-West |
Melbourne’s North-West Suburbs |
2029 |
Under Construction (Multi-Phase) |
Dedicated On-site High-Voltage Substation |
|
|
AirTrunk Hong Kong Hyperscale Data Center Expansion (35MW) |
Tsuen Wan |
HKG2 Full Deployment: Mid-2024 (delivered fully to global anchor cloud tenants) |
Operational |
35+ MW Total IT load (HKG1: 20+ MW |
|
|
AirTrunk TOK1: $1.2B 300MW+ Hyperscale AI Data Center Tokyo |
Inzai, Tokyo Metropolitan Region |
2028 |
Operational / Under Expansion |
300 MW+ (Scalable Master Plan) |
|