AirTrunk

AirTrunk

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
AirTrunk TOK2 West Tokyo Data Center: 110MW Hyperscale & AI Hub West Tokyo, Tokyo Prefecture, Japan Active Multi-Phase Development (Targeting 110+ MW Total) Operational & Active Phased Expansion 110+ MW Secured Utility Power Allocation
AirTrunk MEL1 Melbourne West Data Center Campus: 185MW+ Hyperscale Hub 176 Swann Drive, Derrimut, VIC 3030, Australia Operational Active Campus Expansion Fully Operational / Active Phased Expansion 185+ MW Secured Utility Power Capacity Allocation
AirTrunk MEL3 Melbourne Data Center: Hyperscale AI Infrastructure Hub Northwest Melbourne Metropolitan Corridor, Victoria, Australia Targeted 2029–2030+ Planning / Land Acquisition & Pre-Development ~300 MW – 400+ MW Scalable Utility Power Capacity
AirTrunk JHB4 Johor Bahru Data Center Campus 5.59-hectare campus, Iskandar Puteri, Johor Bahru, 79200 Johor, Malaysia 2030 (Phased commissioning across all 8 planned data halls) Under Development / Announced 142+ MW gross utility design capacity
AirTrunk JHB2 Johor: 270MW Malaysia AI Campus 11-hectare (27-acre) campus, Iskandar Puteri, Johor Bahru, 79200 Johor, MalaysiaUnder Development / Announced 2030 (Phased commissioning across multi-hall layout) Under Development / Announced 270+ MW gross utility design capacity
AirTrunk JHB3 Johor: 138MW Malaysia AI Campus 5.4-hectare campus, Iskandar Puteri, Johor Bahru, 79200 Johor, Malaysia 2029 (Phased commissioning across all 8 planned data halls) Under Development / Announced 138+ MW gross utility design capacity
AirTrunk Raigad 3GW Hyperscale Data Center Campus Raigad Pen Growth Centre, Pen Taluka, Maharashtra, India 2032-2035 (Continuous phased growth) Pre-Construction / Land Allotment Phase (Letter of Intent signed) 3,000 MW total planned campus footprint
AirTrunk Maharashtra Campus: 3GW Western India AI Hub Strategic Hyperscale Industrial Corridor, Maharashtra, India Late 2034 (Complete realize of the multi-building gigawatt masterplan expansion) Pre-construction / Site Engineering (Announced July 2026) 3,000 MW (3 GW) ultimate secured substation grid allocation
Humain & AirTrunk Riyadh | High-Performance Hyperscale Cloud & AI Facility Riyadh, Saudi Arabia Est. 2028+ (Staged approach based on Hyperscaler demand) Pre-development/Planning Phase Initial Phase 100 MW+ (Anticipated)
AirTrunk OSK2 Infrastructure in East Osaka East Osaka, Kansai Region, Japan 2027 Live / Operational (Initial Phase) 110 MW (High-Density ready)
AirTrunk JHB1 Johor Bahru Jalan Johor Jaya, Johor Bahru, Malaysia Expected 2027 Operational (Phase 1) / Expanding 150 MW Total Campus Capacity
AirTrunk MEL2 - Melbourne North-West Melbourne’s North-West Suburbs 2029 Under Construction (Multi-Phase) Dedicated On-site High-Voltage Substation
AirTrunk Hong Kong Hyperscale Data Center Expansion (35MW) Tsuen Wan HKG2 Full Deployment: Mid-2024 (delivered fully to global anchor cloud tenants) Operational 35+ MW Total IT load (HKG1: 20+ MW
AirTrunk TOK1: $1.2B 300MW+ Hyperscale AI Data Center Tokyo Inzai, Tokyo Metropolitan Region 2028 Operational / Under Expansion 300 MW+ (Scalable Master Plan)