AirTrunk

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
AirTrunk Mumbai BOM3 Data Center 48MW Chandivali Chandivali, Mumbai, Maharashtra 400072, India (1.5-hectare urban footprint) 2030 Pre-Development & Site Master Planning Phase 48.0+ MW Gross Utility Power Allocation
AirTrunk Kurri Kurri 540MW Hyperscale Data Center Hunter Region NSW Hart Road, Loxford, Kurri Kurri, NSW 2326, Australia Q4 2031 Planning / Environmental Impact Statement (EIS) Phase 540.0 MW Total Utility Infrastructure Allocation
AirTrunk TOK2 Building 3 Ome Tokyo West 30MW Hyperscale Data Center Japan 6-chome-1 6-a, Ome, Tokyo Prefecture, Japan Final phase building completing AirTrunk’s 110MW+ Western Tokyo AI factory hub Active Development / Expansion Phase Substation High-Voltage Dedicated IT Infrastructure Allocation
AirTrunk TOK2 Building 2 Ome Tokyo West 40MW Hyperscale Data Center Japan AirTrunk TOK2 Campus, 198-0024 Ome, Tokyo Prefecture, Japan Second-phase building of AirTrunk’s Western Tokyo AI factory hub and cloud availability zone Active Development / Expansion Phase Substation High-Voltage Dedicated IT Infrastructure Allocation
AirTrunk TOK2 Building 1 Ome Tokyo West 30MW Hyperscale Data Center Japan AirTrunk TOK2 Campus, Ome, Tokyo Prefecture, Japan Foundational building of AirTrunk’s Western Tokyo AI factory hub and cloud zone Active Development / Phase 1 Construction Substation High-Voltage Dedicated IT Infrastructure Allocation
AirTrunk Mars Road 3-4 Apollo Place 140MW Hyperscale Data Centre Sydney 3–4 Apollo Place & 87–91 Mars Road, Lane Cove West, NSW 2066, Australia Strategic Sydney Lower North Shore hyperscale ecosystem node hosting cloud availability zones and AI pods Active Development / EIS Preparation Phase (SSD-108835458) Substation High-Voltage Infrastructure Capacity Allocation
AirTrunk JHB1 Johor Bahru Jalan Johor Jaya, Johor Bahru, Malaysia Expected 2027 Operational (Phase 1) / Expanding 150 MW Total Campus Capacity
AirTrunk SGP1 Singapore Hyperscale Campus 22 Loyang Drive, Pasir Ris, Singapore 508970 Operational (78+ MW active across 18 data halls) Fully Operational 90+ MVA gross utility grid capacity
AirTrunk MEL2 - Melbourne North-West Melbourne’s North-West Suburbs 2029 Under Construction (Multi-Phase) Dedicated On-site High-Voltage Substation
AirTrunk TOK2 West Tokyo Data Center: 110MW Hyperscale & AI Hub West Tokyo, Tokyo Prefecture, Japan Active Multi-Phase Development (Targeting 110+ MW Total) Operational & Active Phased Expansion 110+ MW Secured Utility Power Allocation
AirTrunk MEL1 Melbourne West Data Center Campus: 185MW+ Hyperscale Hub 176 Swann Drive, Derrimut, VIC 3030, Australia Operational Active Campus Expansion Fully Operational / Active Phased Expansion 185+ MW Secured Utility Power Capacity Allocation
AirTrunk MEL3 Melbourne Data Center: Hyperscale AI Infrastructure Hub Northwest Melbourne Metropolitan Corridor, Victoria, Australia Targeted 2029–2030+ Planning / Land Acquisition & Pre-Development ~300 MW – 400+ MW Scalable Utility Power Capacity
AirTrunk JHB4 Johor Bahru Data Center Campus 5.59-hectare campus, Iskandar Puteri, Johor Bahru, 79200 Johor, Malaysia 2030 (Phased commissioning across all 8 planned data halls) Under Development / Announced 142+ MW gross utility design capacity
AirTrunk JHB2 Johor: 270MW Malaysia AI Campus 11-hectare (27-acre) campus, Iskandar Puteri, Johor Bahru, 79200 Johor, MalaysiaUnder Development / Announced 2030 (Phased commissioning across multi-hall layout) Under Development / Announced 270+ MW gross utility design capacity
AirTrunk JHB3 Johor: 138MW Malaysia AI Campus 5.4-hectare campus, Iskandar Puteri, Johor Bahru, 79200 Johor, Malaysia 2029 (Phased commissioning across all 8 planned data halls) Under Development / Announced 138+ MW gross utility design capacity
AirTrunk Raigad 3GW Hyperscale Data Center Campus Raigad Pen Growth Centre, Pen Taluka, Maharashtra, India 2032-2035 (Continuous phased growth) Pre-Construction / Land Allotment Phase (Letter of Intent signed) 3,000 MW total planned campus footprint
AirTrunk Maharashtra Campus: 3GW Western India AI Hub Strategic Hyperscale Industrial Corridor, Maharashtra, India Late 2034 (Complete realize of the multi-building gigawatt masterplan expansion) Pre-construction / Site Engineering (Announced July 2026) 3,000 MW (3 GW) ultimate secured substation grid allocation
AirTrunk OSK2 Infrastructure in East Osaka East Osaka, Kansai Region, Japan 2027 Live / Operational (Initial Phase) 110 MW (High-Density ready)
Humain & AirTrunk Riyadh | High-Performance Hyperscale Cloud & AI Facility Riyadh, Saudi Arabia Est. 2028+ (Staged approach based on Hyperscaler demand) Pre-development/Planning Phase Initial Phase 100 MW+ (Anticipated)
AirTrunk Hong Kong Hyperscale Data Center Expansion (35MW) Tsuen Wan HKG2 Full Deployment: Mid-2024 (delivered fully to global anchor cloud tenants) Operational 35+ MW Total IT load (HKG1: 20+ MW
AirTrunk TOK1: $1.2B 300MW+ Hyperscale AI Data Center Tokyo Inzai, Tokyo Metropolitan Region 2028 Operational / Under Expansion 300 MW+ (Scalable Master Plan)