Amazon AWS Butler County Campus Data Center Ohio |
Woodsdale Road Area, Madison & St. Clair Townships, Trenton, Butler County, Ohio 45067, USA |
NA |
Proposed / Contested |
NA |
|
|
AWS Project Rise Data Center Wheatfield Indiana |
2938–2778 E County Road 1350 N, Wheatfield, Jasper County, Indiana 46392, USA |
NA |
Under Construction |
NA |
|
|
AWS Georgia Hyperscale & AI Expansion Campuses |
8125 Factory Shoals Road, Lithia Springs, GA 30122 |
2029–2030 |
Active Development / Permitted Pre-Construction & Early Site Work Phase |
600.0 MW Gross Utility Power Allocation (480.0 MW Combined Critical IT Capacity) |
|
|
AWS Richmond County Hyperscale & AI Campus |
198 Energy Way, Hamlet, NC 28345, USA |
2032–2035 |
Active Construction Phase (Broke Ground October 2025) |
1,000.0 MW Gross Utility Power Allocation (800.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Clonshaugh Data Center Campus |
Clonshaugh Business & Technology Park, Priorswood, Dublin 17, Ireland |
Operational Multi-Building Expansion Campus |
Fully Operational |
~165.0 MW Combined Gross Utility Allocation (~132.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Hibernian Data Center Campus |
Hibernian Industrial Estate, 30A Greenhills Road, D24 TW42 Kilnamanagh, Dublin, Ireland |
Operational Multi-Building Expansion Campus |
Fully Operational / Active Multi-Building Campus Expansion |
120.0 MW Combined Gross Utility Power Allocation (96.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Mulhuddart Data Center Campus |
Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland |
Operational Multi-Building Expansion Campus |
Active Development and Multi-Building Operational Campus Phase |
175.0 MW Combined Gross Utility Allocation (140.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Tallaght Data Center Campus |
Airton Road / Belgard Road (Former Jacob's Biscuits Industrial Site), Tallaght, Dublin 24, D24 DA27, Ireland |
Operational Multi-Building Expansion Campus |
Fully Operational |
55.0 MW Combined Gross Utility Power Allocation (45.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Airton 1 Data Center |
Airton Road, Tallaght, Dublin 24, D24 F200, Ireland |
Operational |
Fully Operational / Active Node |
27.5 MW Gross Utility Power Allocation |
|
|
AWS DUB Airton 2 Data Center |
Airton Road / Belgard Road (Building 2 West), Tallaght, Dublin 24, D24 DA27, Ireland |
Operational |
Fully Operational / Active Node |
28.5 MW Gross Utility Power Allocation (23.0 MW Critical IT Capacity) |
|
|
AWS DUB Blanchardstown 1 Data Center |
Blanchardstown Corporate Park / Industrial Park, Snugborough Road, Blanchardstown, Dublin 15, Ireland |
Operational |
Fully Operational / Active Core Node |
30.0 MW Gross Utility Power Allocation |
|
|
AWS DUB Blanchardstown 2 Data Center |
Blanchardstown Corporate Park / Industrial Park, Snugborough Road, Blanchardstown, Dublin 15, Ireland |
Operational |
Fully Operational |
30.0 MW Gross Utility Power Allocation (24.0 MW Critical IT Capacity) |
|
|
AWS DUB Hibernian 5 Data Center |
Hibernian Industrial Estate, 30A Greenhills Road, D24 TW42 Kilnamanagh, Dublin, Ireland |
Operational |
Fully Operational |
25.0 MW Gross Utility Power Allocation (20.0 MW Critical IT Capacity) |
|
|
AWS DUB Kildare Innovation Campus Data Center |
Kildare Innovation Campus, Barnhall, Leixlip, County Kildare, W23 X5R2, Ireland |
2028 Target |
Active Development |
150.0 MW Combined Gross Utility Allocation (120.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Mulhuddart 1 Data Center |
Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland |
Operational |
Fully Operational / Active Node |
35.0 MW Gross Utility Power Allocation (28.0 MW Critical IT Capacity) |
|
|
AWS DUB Mulhuddart 2 Data Center |
Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland |
Operational |
Fully Operational / Active Node |
35.0 MW Gross Utility Power Allocation (28.0 MW Critical IT Capacity) |
|
|
AWS SIN 12 Sunview Data Center |
12 Sunview Drive, Jurong Industrial Estate, Singapore 627620 |
Operational |
Fully Operational / Active Node |
40.0 MW Gross Utility Power Allocation (32.0 MW Critical IT Capacity) |
|
|
AWS Incheon Gajwa Hyperscale AI Campus |
585-49 and 585-1 Gajwa-dong, Seo-gu, Incheon 22839, South Korea |
2028–2029 |
Active Development / Permitted Pre-Construction Phase (First Self-Owned AWS Site in South Korea) |
100.0 MW Gross Utility Power Allocation (80.0 MW Critical IT Capacity) |
|
|
Amazon AWS Project Galaxy Campus Data Center 3 Billion Sidney Ohio |
West Millcreek Road and South Vandemark Road (North side of Millcreek Rd, west of Vandemark Rd), Sidney, Shelby County, Ohio 45365, USA |
2030 Target |
Under Construction / Active Development |
Multi-Megawatt Campus Utility Power Allocation |
|
|
Amazon Web Services 80MW Hyperscale Cloud Campus In Lithia Springs |
2250 Rock House Rd, Lithia Springs, Douglas County, Georgia, 30122, USA |
Q4 2025 |
Operational / Under Expansion |
64.0 MW IT Power (80.0 MW Total Utility Power Capacity |
|
|
Amazon Web Services 100MW Hyperscale Cloud Campus In Lithia Springs |
2335 Echo Rd, Lithia Springs, Douglas County, Georgia, 30122, USA |
Q4 2030 |
Permitting / Regulatory Review |
80.0 MW IT Power (100.0 MW Total Utility Power Capacity) |
|
|
Amazon Horizon Junction Data Center 1752 County Road 241 Floydada Texas AWS |
1752 County Road 241, Floydada, TX 79235, USA |
Multi-building flagship AWS West Texas cloud & AI availability zone campus |
Under Construction / Active Site Enabling & Civil Works |
200 MW Grid Infrastructure Allocation |
|
|
Bitter Blue Data Center 12807 Donop Road San Antonio Texas AWS Hyperscale Campus |
12807 Donop Road, San Antonio (Elmendorf), TX 78223, USA |
Multi-building flagship South San Antonio AWS cloud & AI availability zone node |
Under Construction / Phased Active Development |
~120 MW Dedicated Grid Allocation |
|
|
Glendenning Road Data Centre 2 Glendenning Rd 202.4MW Hyperscale Data Center Sydney Australia |
2 Glendenning Road, Glendenning, NSW 2761, Australia |
3-building 202.4 MW flagship Western Sydney hyperscale cloud and AI computing campus |
In Planning / State Significant Development Approval Phase (SSD-73761707) |
202.4 MW Dedicated Utility Allocation |
|
|
Amazon Montgomery City Missouri $10B Hyperscale AWS Data Center Campus |
Montgomery City, Montgomery County, MO 63361, USA |
Strategic Midwest AWS hyperscale hub hosting generative AI training models and cloud regions |
Announced / Active Pre-Construction & Site Prep Phase |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
AWS Shreveport Data Center Campus Building C Amazon Web Services Caddo Parish Louisiana |
AWS Industrial Campus Park, Shreveport, LA 71101, United States |
Q2 2029 |
Under Development / Planned Phase |
80.0 MW Gross Utility Power Capacity / 60.0 MW Total Critical IT Load |
|
|
AWS Wilderness Crossing Data Center Campus Orange County Virginia Amazon Web Services |
Route 3 & Route 20, Locust Grove, Orange County, VA 22508, United States |
Q4 2033 |
Approved / Planning Phase |
1,500.0 MW Gross Power Allocation / 1,200.0 MW Total Campus Critical IT Load |
|
|
AWS Project Eagle Building G Data Center Boling Texas Amazon Web Services |
230 Eaglewood Dr, Boling, TX 77420, United States |
Q1 2027 |
Under Construction |
45 MW Gross Utility Power Capacity |
|
|
AWS Santiago AI Region Chile Data Center Amazon Web Services |
Huechuraba District & Metropolitan Region, Santiago, Chile |
Q4 2030 |
Under Construction |
150 MW Gross Utility Power Capacity |
|
|
AWS Middle East South Cairo Data Center Egypt Amazon Web Services |
Greater Cairo Metro Area, Cairo, Egypt |
Q4 2029 |
Announced / Under Development |
120 MW Gross Utility Power Capacity |
|
|
AWS Mattameade / Orrock Data Center Campus |
Orrock Road, Thornburg, VA 22580, USA |
Q4 2030 |
Under Construction / Master Development |
770 MW Gross Utility Power Capacity (Campus Network Limit) |
|
|
AWS Project Spectrum Comanche Peak Nuclear Data Center Texas |
Comanche Peak Nuclear Power Plant Precinct, Hood County, TX 76043, USA |
Q4 2030 |
Under Construction / Master Development |
1,200 MW Gross Utility Capacity (1.2 GW Nuclear Campus Power Limit) |
|
|
AWS Palava Data Center: 473MW Hyperscale Cloud Campus Lodha Industrial Park Mumbai |
Plot DC-01, Sector D1, Lodha Industrial Park, Palava Industrial and Logistics Park, Dombivli / Thane District, Maharashtra 410208, India |
Multi-Building Hyperscale Campus Buildout |
Under Development / Site Preparation |
~500+ MVA Dedicated Utility Substation Grid Allocation |
|
|
AWS Pecos County Data Center Building B: Off-Grid Hyperscale AI Campus West Texas |
GW Ranch Development Area, Pecos County (Permian Basin Region), Texas, United States |
Active Multi-Phase Mega-Campus Buildout |
Under Development / Site Preparation (Permitted Off-Grid Infrastructure) |
Integrated with 7.65 GW Dedicated On-Site Power Generation Complex |
|
|
AWS Gilroy Data Center: 98MW Hyperscale Cloud Campus Santa Clara County California |
Southeast end of Arroyo Circle, Gilroy, CA 95020, Santa Clara County, California, United States |
Active Multi-Phase Hyperscale Campus (Building 2 - Additional 49 MW IT Load) |
Under Construction (Entitlements Approved July 2025 / Active Construction) |
~110.0 MVA Dedicated Utility Substation Capacity Allocation |
|
|
AWS IAD 7510 Mason Data Center Manassas: Hyperscale Cloud Hub in Virginia |
7510 Mason King Ct, Manassas, VA 20109, United States |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility |
~24 MW to 32 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 7600 Doane Data Center Manassas: Hyperscale Cloud Hub in Virginia |
7600 Doane Dr, Manassas, VA 20109, United States |
Operational Active Facility |
Fully Operational Hyperscale Facility |
~30 MW to 40 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 7505 Mason Data Center Manassas: Hyperscale Cloud Hub in Virginia |
7505 Mason King Ct, Manassas, VA 20109, United States |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility |
~20 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 7500 Bethlehem Data Center Manassas: Hyperscale Cloud Hub in Virginia |
7500 Bethlehem Rd, Manassas, VA 20109, United States |
Operational Active Facility |
Fully Operational Hyperscale Facility / Expansion Corridor |
~35 MW to 45 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 7080 Wellington Data Center Manassas: Hyperscale Cloud Hub in Virginia |
7080 Wellington Rd, Manassas, VA 20109, United States |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility |
~30 MW to 40 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 7070 Wellington Data Center Manassas: Hyperscale Cloud Hub in Virginia |
7070 Wellington Rd, Manassas, VA 20109, United States |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility |
~30 MW to 40 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 24234 Quail Data Center Aldie: Hyperscale Cloud Hub in Northern Virginia |
24234 Quail Ridge Ln, Aldie, VA 20105, United States |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility / Active Expansion |
~32 MW to 48 MW Secured Critical IT Utility Allocation |
|
|
AWS IAD 24224 Quail Data Center Aldie: Hyperscale Cloud Hub in Northern Virginia |
13200 Woodland Park Rd, Herndon, VA 20171, United States |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility |
~32 MW to 48 MW Secured Critical IT Utility Allocation |
|
|
AWS Potomac Church Tech Center: 128MW Hyperscale Campus in Virginia |
123 Old Potomac Church Rd, Stafford, VA 22554, USA |
Active Multi-Building Campus Development (IAD-351 Target 2027) |
Active Development / Under Construction |
128 MW Secured Utility Power Allocation (64 MW per building) |
|
|
AWS SAT 7400 Potranco Data Center: Hyperscale Cloud Hub in San Antonio |
7400 Potranco Rd Building A 78251 San Antonio Texas, USA |
Operational Active Facility |
Fully Operational Hub |
12 MW Secured Utility Power Allocation |
|
|
AWS Louisa County Virginia: $11B+ Multi-Campus Hyperscale Expansion |
Kentucky Springs Rd & Haley Dr (Lake Anna Tech Campus) & Technology Overlay District, Louisa County, VA 23117, United States |
2030–2040 (Phased delivery across multi-campus sites) |
Approved / Phase 1 Construction & Site Infrastructure Development |
~420 MW Critical IT Power (Lake Anna Campus) / 1,000 MW+ Total Regional Footprint Potential |
|
|
AWS St. Joseph County Indiana Data Center Campus |
Indiana Enterprise Center footprint, New Carlisle, St. Joseph County, Indiana 46552, USA |
2032 (Phased commissioning across full 2.4 GW campus footprint) |
Active Construction & Operational Expansion |
2,400 MW (2.4 GW) gross utility substation design capacity |
|
|
AWS Susquehanna: 1920MW Pennsylvania Nuclear AI Campus |
1,200-acre site adjacent to Susquehanna Steam Electric Station, Salem Township, Luzerne County, Pennsylvania, USA |
2032 (Final capacity ramp under long-term Talen power agreement) |
Active / Operational Phase & Expanding |
1,920 MW gross contracted nuclear power allocation |
|
|
AWS Nuclear-Powered Campus: 960MW Texas Hyperscale Hub |
Adjacent to Comanche Peak Nuclear Power Plant, Somervell County, Texas |
Q4 2032 (Complete multi-building compute campus implementation) |
Pre-construction / Site Mobilization (Announced 2026) |
960 MW total dedicated co-located nuclear power envelope |
|
|
AWS Mississippi Delta 1500MW AI Cloud Complex |
Madison County Industrial Corridor, Mississippi, USA |
H2 2030 |
Fully Operational / Newly Launched Phase |
1,500 MW Master Planned Grid Connection via Dedicated Transmission Lines |
|
|
AWS Kingdom of Saudi Arabia Cloud Region |
Riyadh Metropolitan Area, Kingdom of Saudi Arabia (KSA) |
2027 and beyond. |
Under Construction / Development Phase |
500 MW |
|
|
AWS European Cloud Region for Data Sovereignty |
Germany |
Initial launch by late 2026; full investment deployed by 2029 |
Confirmed / Under Construction |
Significant capacity as part of the total €7.8B investment in the region |
|
|
AWS Malaysia Region Infrastructure |
Kuala Lumpur/Johor Metropolitan Area, Malaysia |
Projected over a 15-year timeframe to reach the full committed investment capacity (through 2038). |
Under Development / Construction Phase |
Not Publicly Disclosed (Estimated at hundreds of MW of total utility capacity over the investment period). |
|
|
AWS Saudi Arabia Cloud Region me-central-2 |
Riyadh & Jeddah (Multi-zone deployment) |
2027 – 2028 |
Go-Live / Operational Launch (Jan 2026) |
100MW+ per Availability Zone |
|
|
Project Starbound AI Cluster in Mississippi |
Madison County (Canton/Ridgeland) & Vicksburg |
March 2026 (Operational) |
Under Construction / Initial Power-Up (March 2026) |
1,000 MW (Total Campus Goal) |
|
|
Amazon GW VSTC Campus | $2 Billion Loudoun County Data Center |
Ashburn (Loudoun County), Virginia |
2030 |
Acquisition Closed / Site Master Planning (March 2026) |
~770 MW |
|
|
Amazon’s Project Star: Massive $11B Hyperscale AI Hub in Indiana |
New Carlisle, Indiana |
Late 2026 |
Under Construction / Rapid Structural Build (May 2026) |
1,000.0 MW (1.0 GW) |
|
|
AWS Project Basalt Walla Walla 5GW AI Cluster |
Multi-site campus across Wallula Gap and Walla Walla County |
AWS Walla Walla |
Phased Construction / Giga-Scale Power Integration (April 2026) |
5,000.0 MW (5.0 GW) |
|
|
AWS New Florence 1.2GW Data Center |
New Florence, Missouri 63363 |
Long-term phased expansion covering 21 planned buildings across Phase 1 (8 buildings) and Phase 2 (13 buildings) running through 2052 |
Under Construction (Equipment mobilized and grading active as of Spring 2026) |
Up to 1.2 GW capacity supported by major utility-grade on-site switching stations |
|
|
Amazon AWS - Calvert County Campus |
Calvert Cliffs Nuclear Power Plant, Lusby, MD |
Long-term sequential multi-facility site scaling continuously through 2034 |
Active / Under Evaluation & Site Feasibility Review (Confirmed May 2026) |
1,500 MW gross generation capacity delivered via direct high-voltage substation switchyards |
|
|
AWS Reno: Geothermal & Solar Powered Next-Gen Infrastructure |
Reno, Newada |
Mid-2028 |
Approved / Siting & Energy Development Phase (Announced May 19, 2026) |
700 MW Total Contracted Clean Power Portfolio Framework |
|
|
AWS Project White River: $15B 2.4GW NIPSCO AI Expansion |
Northwest Indiana / NIPSCO Service Territory |
End of 2032 |
Planned / Strategic Mobilization (March 2026) |
2,400 MW (2.4 GW) |
|
|
AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center |
Salem Township (Luzerne) & Falls Township (Bucks), PA |
2030 |
Permitting / Site Preparation (March 2026) |
1,920 MW (1.92 GW) |
|
|
AWS Project Olympic: $12B AI Data Centers Northwest Louisiana |
Shreveport & Bossier City (Caddo/Bossier Parishes), LA |
March 2026 (Site Prep) |
Pre-Construction / Site Preparation (March 2026) |
Scalable Multi-Site Load |
|
|
AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County |
Boardman / Umatilla (Morrow County), Oregon |
2032 (Pending Nuclear Timeline) |
Under Construction (March 2026) |
1.0 GW |
|
|
AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana |
New Carlisle indiana |
2030 |
Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) |
2,250 MW (2.25 GW) |
|
|
AWS Vicksburg: $3B AI Data Center Campus Warren County MS |
Ceres Industrial Park / Vicksburg Area |
2030 |
Under Construction / Site Prep |
~300 MW (Scaling with 754MW Entergy Plant) |
|
|
AWS Madison County: 1GW $10B AI Data Center Campus MS |
Madison County Mega Site & Ridgeland |
2027 |
Under Construction / Phase 1 Commissioning |
1,000 MW (1 GW) Combined Portfolio |
|
|
AWS Clinton: $750M AI Data Center Mississippi |
Industrial Park Dr, Clinton, MS |
2028 |
Under Construction (Rehabilitation Phase) |
~150 MW Target (Scaling with Grid Upgrades) |
|
|
Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) |
Shreveport / Bossier City |
2030 |
Announced / Site Preparation |
1.2 GW Total Site Load |
|
|
AWS Thailand: $5B 3-AZ Cloud & AI Region Bangkok |
Bangkok, Metropolitan Area |
2037 (End of 15-year plan) |
Operational (Launched Jan 2025) / Expanding (2026) |
Hyperscale Utility Allocation |
|
|
AWS Aragon Expansion: 33.7B Euro AI & Cloud Infrastructure |
Zaragoza, Multi-site: Zaragoza, Huesca, and Teruel (Aragon Region) |
2030 |
Announced / Under Expansion |
Total regional capacity projected at 1 GW+ by full buildout |
|
|
Anaplan AWS Singapore: 500MW AI-Driven Data Infrastructure |
Strategic Industrial Zone, Singapore |
Scheduled for Q4 2027 |
Live / Operational |
120 MW Initial |
|