Vantage 96MW AI Data Center San Antonio Texas |
Omicron Drive, Bexar County, San Antonio |
2028 |
Under Construction (Fit-out Phase) |
96 MW IT Load |
|
|
Vantage Bordeaux AI & Cloud Data Center Campus (400MW) |
Proximity to Bordeaux Metropolitan Area, bordeaux |
2029 |
Announced / Pre-Construction |
400 MW total site capacity |
|
|
Vantage Cardiff - CWL13 |
Celtic Way, Newport |
January 2026 |
Commissioned / Operational |
Shared Substation |
|
|
Vantage Johannesburg JNB2 (Isando Campus) |
Brollo Road, Isando, Germiston |
Ongoing |
Live / Operational |
20 MW IT Load |
|
|
Vantage JHB1 Hyperscale Data Center |
Sedenak Tech Park (STeP), Kulai, Johor |
Projected Q4 2027 |
Phase 1 Operational / Phase 2 Construction (Go-Live Jan 2026) |
300 MW Total Utility Feed |
|
|
Lighthouse Data Center Campus |
Port Washington, Ozaukee County, Wisconsin |
2028 |
Under Construction (Phase 1) |
1,000 MW Dedicated |
|
|
Lighthouse Campus (part of OpenAI/Oracle Stargate) |
Port Washington, Ozaukee County, Wisconsin, USA |
2028 |
Under Construction (Groundbreaking: Dec 17, 2025) |
1.3 GW peak (dedicated high-voltage substation) |
|
|
Vantage KUL2 Data Center Campus |
Cyberjaya, Selangor, Malaysia |
2028 |
Phase 1 Operational / Under Construction (Ongoing) |
256 MW (Initial KUL2 Scope) |
|
|
Vantage Cardiff CWL1 Campus |
Celtic Way, Newport, South Wales, UK |
Estimated completion of all three buildings by 2026-2027 |
Partially Operational / Expanding |
148MW+ (Upgradeable) |
|
|
Vantage Frontier Data Center Campus |
Shackelford County, Texas, USA |
Expected completion and full operational status by 2028. |
Construction Underway (Announced August 2025) |
1.4 GW (Total IT Load) |
|