Latin America

Latin America – Data Center Regional Overview

Latin America is experiencing steady growth in data center development, supported by rising internet usage, expanding cloud adoption, and increasing demand for digital services across enterprise and consumer segments. The region is becoming increasingly attractive for hyperscale and colocation investments.

Key growth factors include improving connectivity infrastructure, growth in e-commerce and fintech platforms, and rising demand for localized data storage driven by regulatory and latency requirements. Large metropolitan areas continue to dominate deployments, while secondary markets are gradually emerging.

Challenges such as power reliability, regulatory variability, and infrastructure maturity remain, but ongoing investments in energy, network connectivity, and digital ecosystems are strengthening the region’s long-term outlook.

Overall, Latin America represents a growing opportunity for data center operators seeking expansion beyond traditional markets, supported by increasing digital consumption and evolving enterprise IT requirements.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
ODATA DC ST02 Hyperscale Campus San Bernardo, Santiago Metropolitan Region, Chile Ongoing (Expansion of DC ST01 also announced) Operational 60 MVA (Utility Power) / 40.6 MW (IT Load)
Ascenty Vinhedo Campus Vinhedo (Near Campinas/Greater São Paulo), Brazil Total of 5 data centers, reaching 114 MW capacity. Operational (Phase 1 & 2) / Under Expansion (Phase 3+) V1: 27 MW; V2: 34 MW. V3-V5 Expansion: +44 MW (Total 114 MW)
Rio AI City (Rio de Janeiro Data Center Campus) Rio de Janeiro, Brazil Projected by 2032 (for 3.2 GW capacity) Announced/In Development 1.8 GW (Initial IT Load)
Scala Data Centers Tamboré Campus Tamboré, Barueri (Greater São Paulo), Brazil Expected by late 2020s Under Construction / Active Expansion (Multi-Phase) 200+ MW (Planned total site capacity)
Scala AI City (AI City Campus) Eldorado do Sul, Rio Grande do Sul, Brazil Phased development over 20 years Announced / Initial Development Phase 5 GW Total Authorized Power Input
Sur Energy & OpenAI Stargate AI Project (AI Supercluster) TBC (Multiple sites likely in a region with secured clean energy access, Argentina) TBC (Phased over 5-7 years) Announced / Letter of Intent Signed (High-Level Planning) Implied Gigawatt-scale over multi-phase buildout (Critical for AI Supercluster)