ODATA DC ST02 Hyperscale Campus |
San Bernardo, Santiago Metropolitan Region, Chile |
Ongoing (Expansion of DC ST01 also announced) |
Operational |
60 MVA (Utility Power) / 40.6 MW (IT Load) |
|
|
Ascenty Vinhedo Campus Infrastructure |
Vinhedo (Near Campinas/Greater São Paulo), Brazil |
Total of 5 data centers, reaching 114 MW capacity. |
Operational (Phase 1 & 2) / Under Expansion (Phase 3+) |
V1: 27 MW; V2: 34 MW. V3-V5 Expansion: +44 MW (Total 114 MW) |
|
|
CloudHQ Querétaro Campus Infrastructure |
Querétaro, Mexico (Near Querétaro Airport) |
Projected completion by 2027 |
Announced / Active Development (Master Plan Confirmed) |
900 MW |
|
|
Rio de Janeiro AI City Data Center Campus |
Rio de Janeiro, Brazil |
Projected by 2032 (for 3.2 GW capacity) |
Announced/In Development |
1.8 GW (Initial IT Load) |
|
|
Scala Data Centers Tamboré | High-Performance AI-Ready Colocation Campus |
Tamboré, Barueri (Greater São Paulo), Brazil |
Expected by late 2020s |
Under Construction / Active Expansion (Multi-Phase) |
200+ MW (Planned total site capacity) |
|
|
Scala AI City Campus | Next-Generation AI Infrastructure & Cloud Hub |
Eldorado do Sul, Rio Grande do Sul, Brazil |
Phased development over 20 years |
Announced / Initial Development Phase |
5 GW Total Authorized Power Input |
|
|
Sur Energy Stargate AI Project | OpenAI-Powered AI Infrastructure & Compute Campus |
TBC (Multiple sites likely in a region with secured clean energy access, Argentina) |
TBC (Phased over 5-7 years) |
Announced / Letter of Intent Signed (High-Level Planning) |
Implied Gigawatt-scale over multi-phase buildout (Critical for AI Supercluster) |
|
|
Project Orizaba Querétaro Data Center | Microsoft $1.3B AI-Ready Cloud Region |
Queretaro Metropolitan Area |
Ongoing Scaling (2026-2030) |
Operational / Phase 2 Expansion (April 2026) |
~200 MW |
|
|
Project Hera Mexico Data Center | $2B AI-Ready Cloud & Compute Campus |
El Marqués Industrial Park Corridor, El Marqués |
2029 |
Under Construction / MEP Integration (April 2026) |
~250 MW |
|
|
Stargate Patagonia AI Supercluster | 500MW Hyperscale Compute & Infrastructure Hub |
Patagonia (High-Wind Corridor) |
2029 |
Planning / Letter of Intent Signed (Oct 2025) |
500 MW |
|
|
Equinix SP7 IBX São Paulo | AI-Ready $110M Digital Infrastructure Expansion |
-23.589496 |
2027 |
Under Construction / Active Fit-out (April 2026) |
20.0 MW |
|
|
Google Canelones: $850M High-Density Uruguay AI Cloud Hub |
Camino de los Horneros, Parque de las Ciencias, Canelones, Uruguay |
Continuous modular server hall conversions and technical infrastructure expansions pacing through 2028 |
Active / Under Advanced Structural Construction (Tracking June 2026) |
56 MW gross utility line allocation designed to support deep integration of custom high-density AI accelerator clusters |
|