Latin America

Latin America – Data Center Regional Overview

Latin America is experiencing steady growth in data center development, supported by rising internet usage, expanding cloud adoption, and increasing demand for digital services across enterprise and consumer segments. The region is becoming increasingly attractive for hyperscale and colocation investments.

Key growth factors include improving connectivity infrastructure, growth in e-commerce and fintech platforms, and rising demand for localized data storage driven by regulatory and latency requirements. Large metropolitan areas continue to dominate deployments, while secondary markets are gradually emerging.

Challenges such as power reliability, regulatory variability, and infrastructure maturity remain, but ongoing investments in energy, network connectivity, and digital ecosystems are strengthening the region’s long-term outlook.

Overall, Latin America represents a growing opportunity for data center operators seeking expansion beyond traditional markets, supported by increasing digital consumption and evolving enterprise IT requirements.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
ODATA DC ST02 Hyperscale Campus San Bernardo, Santiago Metropolitan Region, Chile Ongoing (Expansion of DC ST01 also announced) Operational 60 MVA (Utility Power) / 40.6 MW (IT Load)
Ascenty Vinhedo Campus Infrastructure Vinhedo (Near Campinas/Greater São Paulo), Brazil Total of 5 data centers, reaching 114 MW capacity. Operational (Phase 1 & 2) / Under Expansion (Phase 3+) V1: 27 MW; V2: 34 MW. V3-V5 Expansion: +44 MW (Total 114 MW)
CloudHQ Querétaro Campus Infrastructure Querétaro, Mexico (Near Querétaro Airport) Projected completion by 2027 Announced / Active Development (Master Plan Confirmed) 900 MW
Rio de Janeiro AI City Data Center Campus Rio de Janeiro, Brazil Projected by 2032 (for 3.2 GW capacity) Announced/In Development 1.8 GW (Initial IT Load)
Scala Data Centers Tamboré | High-Performance AI-Ready Colocation Campus Tamboré, Barueri (Greater São Paulo), Brazil Expected by late 2020s Under Construction / Active Expansion (Multi-Phase) 200+ MW (Planned total site capacity)
Scala AI City Campus | Next-Generation AI Infrastructure & Cloud Hub Eldorado do Sul, Rio Grande do Sul, Brazil Phased development over 20 years Announced / Initial Development Phase 5 GW Total Authorized Power Input
Sur Energy Stargate AI Project | OpenAI-Powered AI Infrastructure & Compute Campus TBC (Multiple sites likely in a region with secured clean energy access, Argentina) TBC (Phased over 5-7 years) Announced / Letter of Intent Signed (High-Level Planning) Implied Gigawatt-scale over multi-phase buildout (Critical for AI Supercluster)
Project Orizaba Querétaro Data Center | Microsoft $1.3B AI-Ready Cloud Region Queretaro Metropolitan Area Ongoing Scaling (2026-2030) Operational / Phase 2 Expansion (April 2026) ~200 MW
Project Hera Mexico Data Center | $2B AI-Ready Cloud & Compute Campus El Marqués Industrial Park Corridor, El Marqués 2029 Under Construction / MEP Integration (April 2026) ~250 MW
Stargate Patagonia AI Supercluster | 500MW Hyperscale Compute & Infrastructure Hub Patagonia (High-Wind Corridor) 2029 Planning / Letter of Intent Signed (Oct 2025) 500 MW
Equinix SP7 IBX São Paulo | AI-Ready $110M Digital Infrastructure Expansion -23.589496 2027 Under Construction / Active Fit-out (April 2026) 20.0 MW
Google Canelones: $850M High-Density Uruguay AI Cloud Hub Camino de los Horneros, Parque de las Ciencias, Canelones, Uruguay Continuous modular server hall conversions and technical infrastructure expansions pacing through 2028 Active / Under Advanced Structural Construction (Tracking June 2026) 56 MW gross utility line allocation designed to support deep integration of custom high-density AI accelerator clusters
Elea BEL1: First 100MW Amazon AI Data Center Brazil Belém, Pará State 2031 Announced / Permitting & Initial Site Prep 100 MW total planned capacity
Brazil: ByteDance $38.4B São Paulo Clean Energy Hyperscale Compute Hub Industrial Tech Corridor, Greater São Paulo Metropolitan Area Scheduled multi-phase rollouts expanding through 2033 to reach complete capacity limits Groundbreaking Complete; Civil Site Excavation and Structural Works Active 1,000 MW ultimate site capacity (~850 MW usable net IT load)
Equinix SP6 São Paulo: 20MW Flagship Brazil IBX Data Center Equinix Corporate Campus, Santana de Parnaíba, São Paulo Metropolitan Region, Brazil Late 2027 (Phased expansion across all upper-level server halls) Operational / Phase 1 Live 20 MW gross utility substation capacity
Ascenty Santiago Data Center Campus: 42MW Cloud & Enterprise Hub Guacolda 2100, Comuna de Quilicura, Santiago, Región Metropolitana, 8710067, Chile 2025–2026 (Completion of Santiago 3 Building & Final Whitespace) Operational (Santiago 1 & 2) / Active Expansion (Santiago 3 Under Construction) 42 MW Total Critical Power (10 MW SCL1 + 16 MW SCL2 + 16 MW SCL3)
KIO MEX2 Querétaro Data Center Campus: 19MW Digital Hub Circuito El Marqués Norte 21A, Parque Industrial El Marqués, 76246 El Marqués, Querétaro, Mexico 2026–2027 (Final Whitespace Phase Delivery) Operational (Phase 1) / Active Expansion 12 MW Critical IT Power (QRO2) / 19 MW Total Campus Power
Ascenty BRSP04 São Paulo Data Center: 9.2MW Cloud Hub Avenida Roberto Pinto Sobrinho, 350, Building 4, Vila Menck, Osasco, SP, 06276-016, Brazil Operational Operational 9.2 MW Total Power Capacity
ODATA ST02 Santiago Data Center: 40.6MW Hyperscale Campus Chile San Bernardo, Metropolitan Region, Santiago, Chile Operational / Active Expansion Phases Operational / Active Expansion 40.6 MW Critical IT Load / 60 MVA Utility Substation Connection
Cirion SJO1 San Jose Data Center: Carrier-Neutral Central America Hub Escazú, San Rafael, Greater San José Metropolitan Area, CP 10203, Costa Rica Operational Active Expansion Operational / Active Regional Expansion ~12.0 MW – 20.0 MW Total Utility Supply Allocation
Scala Data Centers Fortaleza Campus: 30MW Sustainable Hyperscale Hub Av. Dr. Aldy Mentor, 371 - Manuel Dias Branco, Fortaleza - CE, 60191-106, Brazil Target 2028 (SFORPF02 - 13.5 MW) Under Construction / Active Phased Development ~30 MW Total Secured Utility Power Capacity Allocation
ODATA Querétaro Data Center Campus: Mexico's 200MW Hyperscale & AI Hub ODATA, an Aligned Data Centers Company Carretera Estatal 431 - Los Cues km.5.8 Parque Industrial PyME 76246 Santiago de Querétaro Mexico Active Multi-Campus Hyperscale Rollout Operational / Active Phased Expansion 200+ MW Total Secured Utility Power Capacity Allocation
Cirion Technologies Bogotá Data Center Campus: Enterprise Edge & Cloud Hub Av Cl 127 # 87-51, Suba, Bogotá, Colombia Operational Active Metro Expansion Operational / Active Continuous Upgrades ~10 MW – 15 MW Total Utility Power Allocation
Cirion Technologies Lima Data Center Campus: Peru's 20MW AI & Cloud Hub Av. Manuel Olguín 395, Santiago de Surco 15023, Peru Active Multi-Site Metro Expansion Under Construction / Active Phased Expansion 20+ MW Total Secured Utility Power Capacity Allocation
Ascenty Santiago 2 Data Center: 16MW Hyperscale & Cloud Hub in Chile Quilicura, Santiago Metropolitan Region, Chile Operational Active Expansion Operational / Active Expansion 16 MW Total Utility Power Allocation
ODATA São Paulo Hyperscale Data Center Campus: 48MW+ AI-Ready Hub R. Herman, 02 - Industrial Anhangüera, Osasco, SP, 06276-030, Brazil Operational Active Campus Expansion Fully Operational / Active Phased Expansion 48 MW Total Secured Utility Power Capacity Allocation
Scala Santiago South Data Center Campus: 120MW Sustainable AI Hub in Chile Lampa Industrial Hub, Santiago Metropolitan Region, Chile Active Multi-Building Campus Expansion Operational / Active Multi-Building Expansion 120 MW Secured Utility Power Allocation
MEX3 Data Center Campus Ascenty Mexico Ascenty Data Centers Vesta Industrial Park, Camino a Nativitas 800 76295 Queretaro Active Multi-Phase Development Active Development / Phased Buildout 21 MW Secured Utility Power Allocation
ODATA QR03 Querétaro Data Center Campus: 300MW Hyperscale & AI Hub in Mexico Carretera Estatal 431 - Los Cues km.5.8 Parque Industrial PyME 76246 Santiago de Querétaro Mexico Active Multi-Building Development (5 Planned Buildings) Operational / Active Multi-Phase Development 300 MW Secured Critical IT Utility Allocation
Equinix ST3 Santiago IBX Data Center: Downtown Carrier-Neutral Colocation Hub Pasaje Nueva Amunátegui 26, Office 105, Santiago, Región Metropolitana, 8340519, Chile Operational Active Facility Fully Operational Carrier-Neutral IBX Facility ~2.0 MW to 3.5 MW Facility Utility Power Allocation
Equinix ST4 Santiago IBX Data Center Ruta 66, Camino de la Fruta, S/N, San Pedro, Región Metropolitana, Chile Operational Active Facility Fully Operational Carrier-Neutral IBX Facility ~1.5 MW to 2.5 MW Facility Power Capacity (4kVA minimum cabinet density)
Equinix ST5 Santiago IBX Data Center: Hyperscale Colocation & AI Hub in Chile Av. la Oración, Pudahuel, Santiago, Región Metropolitana, 9020000, Chile Multi-Phase 16-Data-Hall Campus Development Under Construction / Active Development ~25 MW to 35 MW Secured Utility Power Allocation
Ascenty SP06 São Paulo Data Center: Hyperscale & Enterprise Colocation Hub in Brazil Av. Roberto Pinto Sobrinho, 350 Building 6 06268-120 Osasco Brazil Fully Operational Active Facility Fully Operational Hyperscale Facility ~15 MW to 22 MW Secured Utility Power Allocation
Ascenty SP03 São Paulo Data Center: Carrier-Neutral Enterprise Colocation Hub in Osasco Av. Roberto Pinto Sobrinho, 350 - Vila Menck, Osasco - SP, 02675-031, Brazil Fully Operational Active Facility Fully Operational Carrier-Neutral Facility 4.0 MW Utility Power Allocation / 8,529 kVA Emergency Generator Power Capacity
KIO Querétaro 2 Data Center Mexico: 12MW Hyperscale & AI Hub in El Marqués Parque Industrial El Marqués, 76246 El Marqués, Querétaro, Mexico Fully Operational Active Facility Fully Operational Hyperscale Facility ~18.0 MVA Total Primary Utility Power Allocation
Elea SPO2 Data Center São Paulo: 100MW Sustainable Cloud & AI Hub Brazil Av. Marginal Direita Anchieta, 1241 - Jordanópolis, São Bernardo do Campo - SP, 09891, Brazil Active Multi-Phase AI & Hyperscale Expansion Operational / Active Hyperscale & AI Expansion ~100.0 MW Total Campus Power Grid Allocation
Layer 9 Project Falcon Data Center Guanajuato: 96MW Hyperscale Campus Mexico Guanajuato Industrial Corridor, Guanajuato / Bajío Region, Mexico Active Multi-Phase Hyperscale Campus Development Active Development / Phased Hyperscale Campus Buildout 100.0+ MVA Total Primary Grid Utility Connection Power Allocation
Ada Infrastructure GRU10 Data Center: 300MW Hyperscale & AI Hub São Paulo Brazil Greater São Paulo Metropolitan Area (Guarulhos Corridor), São Paulo, Brazil Active Multi-Phase Greenfield Hyperscale & AI Campus Under Construction / Active Greenfield Development ~350.0 MVA High-Voltage Substation Utility Grid Capacity Allocation
Scala AI City Eldorado do Sul 4.75GW Hyperscale Campus Rodovia Osvaldo Aranha, Eldorado do Sul, RS, 92990-000, Brazil Q4 2035 Under Construction / Master Development 4,750 MW Gross Utility Power Capacity (4.75 GW Campus Limit)
CloudHQ QRO2 Data Center Campus Galeras Querétaro Mexico Carretera Estatal No. 100, El Colorado-Higuerillas, 76295 Galeras, Querétaro, Mexico Q4 2029 Under Construction / Master Development 130 MW Gross Utility Power Capacity (Campus Network Limit)
AWS Santiago AI Region Chile Data Center Amazon Web Services Huechuraba District & Metropolitan Region, Santiago, Chile Q4 2030 Under Construction 150 MW Gross Utility Power Capacity
Scala HyperEdge SPOAPA01 Porto Alegre Data Center – 7.2 MW Av. Pernambuco, 1124, Bairro Navegantes, Porto Alegre - RS, 90240, Brazil December 2023 Fully Operational 7.2 MW total utility allocation
RiverHook Village 18 Pindamonhangaba 300MW AI Hyperscale Data Center Campus 22°54'42.0"S 45°24'45.2"W - Pindamonhangaba, SP, 12445-010, Brazil 50-hectare campus hosting hyperscale AI pods, cloud availability zones, and carrier nodes Planning / Development Phase Substation High-Voltage Infrastructure Capacity Allocation
ODATA SP06 Hortolandia 24MW Hyperscale Data Center Campus Estrada Vereador José de Moraes, Hortolândia, SP 13186, Brazil Strategic Hortolândia campus hosting hyperscale cloud availability zones, enterprise suites, and AI clusters Under Construction / Active Development Phase Substation High-Voltage Infrastructure Capacity Allocation
Tecto BEL1 Belem Para Regional Edge Colocation Data Center Bairro do Uriboca, Belém, PA 66600, Brazil Strategic Northern Brazilian edge hub hosting carrier PoPs, enterprise suites, and cloud nodes Active Development / Expansion Roadmap Substation Utility Grid Infrastructure Capacity Allocation
Tecto Rio GIG2 Rua do Senado Rio de Janeiro Edge Colocation Data Center Rua do Senado, Centro, Rio de Janeiro, RJ 20231, Brazil Strategic urban edge node in Rio hosting enterprise server suites, cloud edge pods, and carrier PoPs Active Development / Operational Edge Expansion Substation Utility Grid Infrastructure Capacity Allocation
Tecto POA2 Avenida Willy Eugenio Fleck Porto Alegre 20MW Data Center Avenida Willy Eugênio Fleck, Porto Alegre, RS 91140-410, Brazil Strategic Southern Brazilian hub hosting cloud edge pods, enterprise suites, and carrier PoPs Active Development / Under Construction Substation Utility Grid Infrastructure Capacity Allocation
Elea RJO2 Jacarepagua Rio de Janeiro 1.5GW Rio AI City Data Center Campus Vargem RuaGrande / Estrada do Arroio Pavuna, Jacarepaguá, Rio de Janeiro, RJ, Brazil Strategic mega-campus hosting national AI models, supercomputing clusters, and hyperscale cloud nodes Under Construction / Active Development Phase Substation Utility Grid Infrastructure Capacity Allocation
Ascenty Hortolandia 6 Papa Joao Paulo II 31MW Hyperscale Data Center Rua Papa João Paulo II, Hortolândia, SP 13184, Brazil Strategic Hortolândia mega-campus node hosting hyperscale cloud availability zones and AI pods Under Development / Active Phase Expansion Dedicated Substation Utility Grid Infrastructure Capacity Allocation
Cuasar Data Center Campus DC Norte Uno Durango Mexico 300MW AI Hyperscale Cuasar Data Center Campus DC Norte Uno Durango Mexico 300MW AI Hyperscale Multi-phase expansion reaching 300+ MW ultimate capacity Announced / Pre-Construction & Land Acquisition Phase 300+ MW Substation Allocation
Yamna Port of Açu AI Data Center Campus Rio de Janeiro Brazil 250MW Port of Açu Industrial Complex, São João da Barra, RJ, Brazil 20-ha (expandable to 40-ha), 250MW+ flagship AI hyperscale campus at Port of Açu Proposed / Land Reserved & Feasibility Permitting ~300 MW Substation Interconnect Request with integrated BESS
Telxius Cancun Landing Gateway Edge Data Center Mexico Subsea Cancún, Quintana Roo, Mexico Operational AI-ready landing gateway and edge data center powering Caribbean subsea routes Completed / Operational Launch (September 2026) ~6.0 MW Utility Interconnect Allocation