Digital Realty CLT16 725 East Trade Street Charlotte |
725 East Trade Street, Charlotte, North Carolina 28202, USA |
2028 |
Under Construction |
12.0 MW Critical IT Load (16.0 MW Gross Power Allocation) |
|
|
Digital Realty PHX15 Chandler Arizona Data Center |
2121 South Price Road, Chandler, Arizona 85286, USA |
2006 |
Operational |
34.0 MW Critical IT Load (54.0 MW – 60.0 MVA Gross Utility Capacity) |
|
|
Digital Realty PHX10 Phoenix Data Center Arizona |
120 East Van Buren Street, Phoenix, Arizona 85004, USA |
Operational |
Operational |
9.9 MW – 11.7 MW Critical IT Load (32.3 MW Gross Building Utility Power Allocation) |
|
|
Digital Realty AUS11 Austin Data Center Texas |
7500 Metro Center Drive, Austin, Texas 78744, USA |
Operational |
Operational |
12.6 MW Critical IT Load (20.0 MW Gross Utility Power Allocation) |
|
|
Digital Realty LAX11 El Segundo Data Center |
200 North Nash Street, El Segundo, California 90245, USA |
Operational |
Operational |
2.7 MW – 3.0 MW Critical IT Load (4.5 MW Gross Utility Power Allocation) |
|
|
Digital Realty LAX12 El Segundo Data Center |
2260 East El Segundo Boulevard, El Segundo, California 90245, USA |
Z |
Operational |
7.45 MW – 18.0 MW Critical IT Capacity (18.0 MW Gross Utility Power Allocation) |
|
|
Digital Realty BUR10 Burbank Data Center |
3015 Winona Avenue, Burbank, California 91504, USA |
Operational |
Operational |
Direct High-Voltage Utility Substation Interconnect via Burbank Water and Power (BWP) Grid |
|
|
Digital Realty ZUR1 Zurich Data Center |
Sägereistrasse 29 & 35, 8152 Glattbrugg, Switzerland |
Operational |
Operational |
12.0 MW Critical IT Load (18.0 MW+ Gross Campus Utility Power Allocation) |
|
|
Digital Realty ZUR2 Zurich Data Center |
Bäulerwisenstrasse 4, 8152 Glattbrugg, Switzerland |
Operational |
Operational |
12.0 MW Critical IT Capacity (Up to 150 kW per Rack Density Support) |
|
|
Digital Realty ZUR3 Zurich Data Center |
Bäulerwisenstrasse 6, Building 2, CH-8152 Glattbrugg, Switzerland |
2022 |
Operational |
24.0 MW Critical IT Capacity (25.0 MW+ Gross Building Utility Power Allocation) |
|
|
Digital Realty ZUR4 Zurich Data Center |
Bäulerstrasse 6, CH-8152 Glattbrugg, Switzerlandz |
2028 |
Under Construction |
15.0 MW Critical IT Capacity (20.0 MW+ Gross Building Utility Power Allocation) |
|
|
Digital Realty ORD10 Chicago Data Center |
350 East Cermak Road, Chicago, Illinois 60616, USA |
Operational |
Operational |
65.0 MW – 80.0 MW Critical IT Capacity (100.0 MW+ Gross Utility Power Allocation) |
|
|
Digital Realty DFW10 Dallas Data Center |
2323 Bryan Street, Dallas, Texas 75201, USA |
Operational |
Operational |
30.0 MW – 36.0 MW Critical IT Capacity (50.0 MW Gross Building Utility Power Allocation) |
|
|
Digital Realty DFW14 Dallas Data Center |
4849 Alpha Road, Dallas, Texas 75244, USA |
Operational |
Operational |
18.0 MW – 20.0 MW Critical IT Load (28.0 MW Gross Utility Power Allocation) |
|
|
Digital Realty DUS1 Data Center Zagreb |
In der Steele 25–45, 40599 Düsseldorf, North Rhine-Westphalia, Germany |
2009 |
Fully Operational |
2.3 MW Critical IT Capacity Allocation |
|
|
Digital Realty Fort Gillem ATL15 Data Center |
Former Fort Gillem Site, Forest Park, Georgia 30297, USA |
2031 |
In Planning |
212.0 MW Critical IT Load (250.0 MW Gross Power Allocation Master Plan) |
|
|
Digital Realty Fort Gillem ATL16 Data Center |
Former Fort Gillem Site, Forest Park, Georgia 30297, USA |
2031 |
Planned |
212.0 MW Critical IT Load (250.0 MW Gross Power Allocation Campus Master Plan) |
|
|
Digital Realty Manassas IAD50 Data Center Virginia |
10050 Brickyard Way, Manassas, Virginia 20110, USA |
2029 |
Under Construction |
96.0 MW Critical IT Capacity (120.0 MW Gross Power Allocation Master Plan) |
|
|
Digital Realty Manassas IAD51 Data Center Virginia |
10051 Brickyard Way, Manassas, Virginia 20110, USA |
2027 |
Operational |
96.0 MW Critical IT Capacity (120.0 MW Gross Power Allocation Master Plan) |
|
|
Digital Realty Manassas IAD53 Data Center Virginia |
9905 Godwin Drive, Manassas, Virginia 20110, USA |
2026 |
Operational |
24.0 MW Critical IT Capacity (48.0 MW Gross Power Allocation Campus Master Plan) |
|
|
Digital Realty Sterling IAD55 Data Center Virginia |
22515 Fitness Court, Sterling, Virginia 20166, USA |
Operational |
Operational |
24.0 MW Critical IT Capacity (32.0 MW Gross Utility Power Allocation) |
|
|
Digital Realty SYD10 Data Center Sydney Ergonomic Park |
1–12 Templar Road, Erskine Park, NSW 2759, Australia |
2014 |
Fully Operational |
11.4 MW Critical IT Load (19.0 MW Gross Power Allocation) |
|
|
Digital Realty SYD14 Data Center Sydney Erskine Park |
16 Lockwood Road, Erskine Park, NSW 2759, Australia |
2022 |
Fully Operational |
12.0 MW Critical IT Capacity (20.0 MW Gross Power Capacity Allocation) |
|
|
Digital Realty SYD13 Data Center Sydney North Ryde |
23–25 Waterloo Road, North Ryde, NSW 2113, Australia |
2027 |
Operating |
10.0 MW Current IT Capacity (70.0 MW Gross Master-Plan Redevelopment Target) |
|
|
Digital Realty YYZ12 Data Center Toronto Front Street |
151 Front Street West, Toronto, Ontario M5J 2N1, Canada |
2010 |
Fully Operational |
15.0 MW Critical IT Load (25.0 MW Gross Power Allocation) |
|
|
Digital Realty YYZ10 Data Center Markham Toronto |
371 Gough Road, Markham, Ontario L3R 4E8, Canada |
2011 |
Fully Operational |
12.0 MW Critical IT Load (20.0 MW Gross Power Allocation) |
|
|
Digital Realty DUS2 Data Center Düsseldorf |
In der Steele 39–45, 40599 Düsseldorf, North Rhine-Westphalia, Germany |
2013 |
Fully Operational |
3.5 MW Critical IT Capacity Allocation |
|
|
Digital Realty ATH3 Data Center Athens Koropi |
Ifestou 74 (Varis Koropiou Avenue), Koropi 194 00, Attica, Athens, Greece |
2023 |
Fully Operational |
6.8 MW Critical IT Capacity (10.0 MW Gross Power Allocation) |
|
|
Digital Realty HKG11 Data Center Hong Kong |
11 Kin Chuen Street, Kwai Chung, New Territories, Hong Kong SAR |
2022 |
Fully Operational |
24.0 MW Critical IT Capacity (36.0 MW Gross Power Capacity Allocation) |
|
|
Digital Realty HKG10 Data Center Hong Kong Tseung Kwan O |
33 Chun Choi Street, Tseung Kwan O Industrial Estate, New Territories, Hong Kong SAR |
2018 |
Fully Operational |
18.0 MW Critical IT Capacity (27.0 MW Gross Power Capacity Allocation) |
|
|
Digital Realty DUB10 Data Center Dublin Blanchardstown |
Unit 9, Blanchardstown Corporate Park, Dublin 15, Ireland |
2018 |
Fully Operational |
10.0 MW Critical IT Load (15.0 MW Gross Power Allocation) |
|
|
Digital Realty DUB11 Data Center Dublin Clonshaugh |
Unit 1, Clonshaugh Business & Technology Park, Dublin 17, Ireland |
2020 |
Fully Operational |
12.0 MW Critical IT Load (18.0 MW Gross Power Allocation) |
|
|
Digital Realty HND11 Data Center Tokyo Mitaka |
8-7-2 Shimorenjaku, Mitaka-shi, Tokyo 181-0013, Japan |
2022 |
Fully Operational |
38.0 MW Critical IT Load (50.0 MW Gross Power Capacity Allocation) |
|
|
Digital Realty KIX10 Data Center Osaka Saito |
5-8-1 Saito Yamabuki, Ibaraki-shi, Osaka 567-0086, Japan |
2018 |
Fully Operational |
8.0 MW Critical IT Capacity (12.0 MW Gross Power Capacity Allocation) |
|
|
Dugny Digital Realty Digital Hub Data Center Campus |
Place Sébastien et Jacques Lorenzi, 93440 Dugny, Seine-Saint-Denis, France |
NA |
Under Construction |
Critical IT Load NA (Gross Utility Allocation NA) |
|
|
Digital Realty Kokomo Data Center Campus |
North 50 East and 450 North, Kokomo, Indiana 46901, USA |
2028 |
Active Development / Master-Planned Construction Phase |
240.0 MW |
|
|
Digital Realty Paris PAR14 Data Center |
14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France |
2021 |
Fully Operational |
3.2 MW Combined Gross Utility Allocation (2.4 MW Total Critical IT Capacity) |
|
|
Digital Realty Paris PAR15 Data Center |
Rue Sébastien et Jacques Lorenzi, 93440 Dugny, France |
2030 |
Under Construction / Active Groundbreak Phase |
82.5 MW Gross Utility Allocation (66.0 MW Total Critical IT Capacity for PAR15) |
|
|
Digital Realty Paris PAR16 Data Center |
Rue Sébastien et Jacques Lorenzi, 93440 Dugny, France |
2030 |
Active Development |
68.8 MW Combined Gross Utility Allocation (55.0 MW Total Critical IT Capacity for PAR16) |
|
|
Digital Realty Ankara Data Center Campus 22MW Türkiye |
Ankara, Türkiye (Exact secure street address and parcel coordinates are proprietary / confidential) |
2030 |
Announced / Initial Development & Planning Phase |
22.0 MW Gross Utility Power Allocation |
|
|
Digital Realty SEA20 Data Center 301 Virginia Street Seattle |
301 Virginia St / 1930 Third Avenue, Seattle, King County, Washington 98101, USA |
Fully Active Interconnection Campus |
Active / Operational & Expanding Interconnection Hub |
Multi-Megawatt Urban Core Utility Power Allocation |
|
|
Digital Realty KIX15 48 MW Osaka AI Data Center Japan |
KIX Campus, Saito, Ibaraki City, Osaka Prefecture, Japan |
Q4 2027 |
Under Construction |
48.0 MW |
|
|
Digital Realty PAR7 32 MW La Courneuve Data Center Paris France |
1-3 rue Rateau, 93120 La Courneuve, France |
Q3 2022 |
Operational |
32.0 MW |
|
|
Digital Realty SIN10 24 MW Jurong East Data Center Singapore |
29A International Business Park, Jurong East, 609934, Singapore |
Q3 2016 |
Operational |
24.0 MW |
|
|
Digital Realty 28MW Capacity Colocation Facility In Austell |
101 Aquila Way, Austell, Douglas County, Georgia, 30122, USA |
Q4 2006 |
Operational |
23.0 MW IT Power (28.8 MW Total Utility Power Capacity) |
|
|
Digital Realty DFW45 80MW Data Center Garland Texas |
Digital Garland Campus, 1602 Ferris Road, Garland, TX 75040, USA |
Q4 2030 |
Under Construction / Planned Greenfield Development |
80.0 MW Contracted Utility Interconnect |
|
|
Digital Realty LHR26 9MW Data Center Slough United Kingdom |
Slough Trading Estate, 630 Ajax Avenue, Slough, SL1 4DG, United Kingdom |
Q4 2022 |
Operational / Colocation & Cloud Ecosystem Campus |
11.0 MW Total Utility Power Allocation |
|
|
Digital Realty LHR27 4.5MW Data Center Slough United Kingdom |
Slough Trading Estate, 631 Ajax Avenue, Slough, SL1 4DG, United Kingdom |
Q4 2022 |
Operational / Enterprise & Cloud Colocation Facility |
6.0 MW Total Utility Power Allocation |
|
|
Digital Realty 1400 East Devon Avenue CH3 Elk Grove Village Illinois |
1400 East Devon Avenue, Elk Grove Village, IL 60007, USA |
Q4 2014 |
Operational / Active Multi-Tenant Colocation Data Center |
30.6 MW Total Utility Interconnect |
|
|
Digital Realty 2200 Busse Road CH1 Elk Grove Village Illinois |
2200 Busse Road, Elk Grove Village, IL 60007, USA |
Q4 2010 |
Operational / Active Enterprise & Wholesale Colocation Data Center |
80.0 MW Total Utility Interconnect |
|
|
Digital Realty 2299 Busse Road CH2 Elk Grove Village Illinois |
2299 Busse Road, Elk Grove Village, IL 60007, USA |
Q4 2011 |
Operational / Active Enterprise & Wholesale Colocation Data Center |
40.0 MW Total Utility Interconnect |
|
|
Digital Realty 10 Forsyth Street NW Atlanta Georgia Colocation Data Center |
10 Forsyth Street NW, Downtown Atlanta, Fulton County, GA 30303, USA |
2029 |
Proposed / Active Expansion Site |
45.0 MW Contracted Utility Power Interconnect |
|
|
Digital Realty 56 Marietta Street ATL13 Atlanta Georgia Carrier Hotel Colocation |
56 Marietta Street NW, Downtown Atlanta, Fulton County, GA 30303, USA |
Q4 2015 |
Operational / Active Flagship Carrier Hotel & Interconnection Hub |
9.5 MW Contracted Utility Power Interconnect |
|
|
Digital Realty Jurong Island Data Center Singapore 50MW Low Carbon AI Campus |
Jurong Town Corporation’s Low-Carbon Data Centre Park, Jurong Island, Singapore |
Q4 2030 |
Proposed / Provisional Allocation Awarded (DC-CFA2) |
50.0 MW Allocated Power Interconnect Capacity |
|
|
Digital Realty CPH-RS Data Center Copenhagen Carl Jacobsens Vej 20 |
Carl Jacobsens Vej 20, 2500 København, Denmark |
Q4 2011 |
Operational |
3.0 MW Utility Supply Interconnect |
|
|
Digital Realty Hillsboro PDX11 54MW Hyperscale Colocation Data Center |
6675 NE 62nd Ave, Hillsboro, OR 97124, USA |
Spans over 280,000+ sq ft total footprint / Designed for high-density cabinet colocation |
Operational / Active Expansion Campus |
Multi-feed primary electrical utility distribution from Portland General Electric (PGE) |
|
|
PDX12 36MW Hillsboro Oregon Digital Realty Hyperscale Colocation Hub |
5870 NE Schaaf Street, Hillsboro, OR 97124, USA |
560,000 sq. ft. total facility area / High-density liquid-cooled rack capability |
Operational / Active Expansion Campus |
36.0 MW Utility Power Interconnection Allocation |
|
|
10MW Digital Realty Hillsboro Oregon PDX10 Enterprise Colocation Data Center |
3825 NW Aloclek Street, Hillsboro, OR 97124, USA |
48,000 sq. ft. building housing 18,000+ sq. ft. of raised floor supporting high-density server rack environments |
Operational / Strategic Colocation Node |
10.0 MW Substation Utility Connection from PGE |
|
|
Digital Realty SIN12 Loyang Singapore – 50 MW Hyperscale Hub |
11 Loyang Cl, Singapore 506756 |
April 2021 (Full Operational Launch) |
Live Operations |
65+ MVA Utility Power Grid Connection |
|
|
Digital Realty Astra North Campus 600 MW Hyperscale Data Center – De Soto Kansas |
Astra Enterprise Park, W 103rd St & Lexington Ave, De Soto, KS 66018, United States |
Up to 9 buildings spanning ~3 million sq. ft. across 280 acres for Astra North phase |
Announced / Planning & Permitting Phase |
600 MW (Phase 1) scaling to 2,000 MW (2 GW Total Potential) |
|
|
Digital Realty MIA10 Miami Data Center: Technical Specs |
36 NE 2nd Street, Miami, FL 33132, USA |
Operational |
Operational |
12.4 MW Total Utility Power Service Connection |
|
|
Digital Realty AMS10 Pudongweg Data Center: Schiphol Colocation Specs |
Pudongweg 25, 1437 EM Aalsmeerderbrug (Schiphol-Rijk area), The Netherlands |
Active Commercial Colocation & Interconnection Hub |
Operational |
~31.2 MW Total Utility Power Provision |
|
|
Digital Realty AMS8 Pudongweg Data Center: Schiphol Colocation Specs |
Pudongweg 37, 1437 EM Rozenburg, North Holland, The Netherlands |
Active Commercial Operations & Cloud Campus Facility |
Operational |
~20 MVA Total Utility Substation Capacity |
|
|
Digital Realty Marseille MRS4 Data Center: 13MW Mediterranean Interconnection Hub |
ancienne base sous-marine, Enceinte Portuaire, Porte 4, 13015 Marseille, France |
Fully Operational Active Facility |
Fully Operational Enterprise & Cloud Hub |
13.0 MW Total Utility Critical IT Power Allocation |
|
|
Digital Realty CPH3 Data Center Copenhagen: 14MW Hyperscale & Interconnection Hub |
Industriparken 24, DK-2750 Ballerup, Copenhagen, Denmark |
Fully Operational Active Facility |
Fully Operational Hyperscale & Enterprise Facility |
~16.0+ MVA Total Utility Grid Supply Allocation |
|
|
Digital Realty Marseille MRS1 Data Center: 10MW Mediterranean Subsea Interconnection Hub |
40 Avenue Roger Salengro, 13003 Marseille, France |
Fully Operational Active Facility |
Fully Operational Enterprise & Cloud Interconnection Hub |
10.0 MW Total Utility Power Grid Connection Allocation |
|
|
Digital Realty Marseille MRS6 Data Center: 50MW Sovereign Cloud & AI Hub |
Avenue Ferdinand de Lesseps, 13320 Bouc-Bel-Air (Marseille Metro Area), France |
Active Multi-Hall Warehouse Conversion & Campus Development |
Under Development / Planned Greenfield Conversion |
~60.0+ MVA Total Utility Grid Connection Allocation |
|
|
Digital Realty Paris PAR8 Data Center: 19MW Hyperscale & Enterprise Hub France |
2 Avenue Marcel Cachin, 93120 La Courneuve, Paris, France |
Fully Operational Active Facility |
Fully Operational Enterprise & Cloud Facility |
Dual independent high-voltage utility grid feeds, static N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt N+1 standby emergency diesel generator arrays with on-site fuel reserve autonomy. |
|
|
Digital Realty Toronto North Expansion: 54MW Hyperscale & Enterprise Hub |
1 Century Place, Vaughan, ON L4L 8R2, Canada |
Operational Active Facility with Phased Expansion |
Fully Operational Hub with Active Expansion |
54 MW Secured Critical IT Power Allocation |
|
|
Digital Realty PAR3 Data Center Paris: Carrier-Neutral Colocation Hub in Saint-Denis |
7-9 avenue des Arts et Métiers, 93200 Saint-Denis, France |
Fully Operational Active Facility |
Fully Operational Carrier-Neutral Facility |
~10 MW to 14 MW Secured Utility Power Allocation |
|
|
Digital Realty FRA8 Data Center Frankfurt: Carrier-Neutral Hub on Weismüllerstraße |
Weismüllerstraße 36, 60314 Frankfurt am Main, Germany |
Fully Operational Active Facility |
Fully Operational Carrier-Neutral Facility |
~8 MW to 12 MW Secured Utility Power Allocation |
|
|
Digital Realty CPH1 Copenhagen Data Center: Ballerup Interconnection Hub |
Industriparken 20A–20C, DK-2750 Ballerup, Copenhagen, Denmark |
Operational Active Campus |
Operational |
~4.2 MW Total Utility Supply Allocation |
|
|
Digital Realty Vienna Data Center Campus: 32MW CEE Interconnection Hub |
Louis-Häfliger-Gasse 10 (VIE1 & VIE2) & Siemensstraße 91 (VIE3), 1210 Vienna, Austria |
Operational Active Campus |
Operational / Active Expansion |
32.0 MW Total Utility Power Supply Allocation |
|
|
MC Digital Realty Osaka KIX Campus: 70MW Hyperscale & AI Hub |
Saito Aokita & Saito Yamabuki District, Minoh-shi / Ibaraki-shi, Osaka 562-0029, Japan |
Operational (Active Whitespace Expansion & AI Density Modernization) |
Operational (KIX10, KIX11, KIX12, KIX13) / Active High-Density & AI Density Upgrades |
70+ MW Critical IT Power Capacity (28 MW KIX11 + 21 MW KIX13 + 13 MW KIX12 + 8 MW KIX10) |
|
|
Digital Realty BER2 Berlin Data Center Campus |
Strategic Industrial Hub, Greater Metropolitan Berlin Area, Germany |
2027 – 2028 |
Under Development / Active Phased Buildout |
32 MW Critical IT Load (Initial Campus Capacity) |
|
|
Digital Realty MAD4 Madrid: 34MW Hyperscale Data Center |
Calle de Alfonso Gómez 4, 28037 Madrid, Spain |
Operational / Phased Expansion 2025–2027 |
Operational / Active Phased Capacity Expansion |
34 MW Critical IT Power Capacity |
|
|
Digital Realty MRS2 Marseille: Mediterranean Subsea & Interconnection Hub |
136 Chemin du Littoral, 13015 Marseille, France (Grand Port Maritime de Marseille) |
Operational / Phased Expansion 2024–2026 |
Operational / Active Multi-Phase Capacity Expansion |
12 MW Critical IT Power Capacity |
|
|
Digital Realty PAR9 Data Center (Paris Digital Park / Interxion PAR9) |
3 Avenue Marcel Cachin, 93120 La Courneuve, France (Paris Digital Park Campus) |
Operational / Continuous Phased Expansion |
Operational / Active Capacity Phasing |
19 MW Critical IT Power Capacity |
|
|
Digital Realty LON2 London: City Campus Financial Interconnection Hub |
11 Hanbury Street (Block C), London E1 6QR, United Kingdom |
Operational |
Operational / Active Multi-Tenant & High-Density Density Upgrades |
16 MW Utility / Substation Power Allocation |
|
|
Digital Realty DUB12 Dublin: 10.3MW Hyperscale & Cloud Hub |
Clonshaugh Industrial Estate, Clonshaugh Crescent, Dublin 17, D17 AW86, Ireland |
Operational / Phased AI & Density Density Optimizations Active |
Operational / Active Multi-Tenant & Cloud Capacity Expansion |
10.3 MW Critical IT Power Capacity / ~12 MW Gross Utility Allocation |
|
|
Digital Realty BRU3 Brussels: Carrier-Neutral Capital Interconnection Hub |
Wezembeekstraat 2, 1930 Zaventem, Greater Brussels Metropolitan Area, Belgium |
Operational / Phased Density and Cooling Upgrades Active |
Operational / Active Multi-Tenant Modernization & Density Upgrades |
1.3 MW Critical IT Power Capacity / 11kV Substation Feed |
|
|
Digital Realty Paris Digital Park Campus (PAR8–PAR11) |
2 Avenue Marcel Cachin, 93120 La Courneuve, Seine-Saint-Denis, France |
Q4 2025 (PAR11 Handover completing full 76 MW campus) |
Operational (PAR8, PAR9, PAR10 Live) / Final Phase Delivery (PAR11) |
85 MW gross utility capacity / 76 MW critical IT load |
|
|
Digital Realty FRA11 Frankfurt: 9MW Digital Park Ostend Hub |
Weismüllerstraße 40, 60314 Frankfurt am Main, Germany |
Operational |
Operational |
9.0 MW total critical IT capacity |
|
|
Digital Realty London Docklands: 30MW Financial Interconnection Hub |
1 Muirfield Crescent (Cloud House) & 227 Marsh Wall (Sovereign House), London E14, UK |
Operational |
Operational |
30.0 MW total critical IT load across campus facilities |
|
|
Digital Realty London LHR20 Data Center (Sovereign House) |
227 Marsh Wall, London E14 9SD, United Kingdom |
Operational |
Operational |
4.8 MW – 8.0 MW critical IT load |
|
|
Digital Realty De Soto AI Data Center Campus |
Astra Enterprise Park, near W. 103rd Street and Lexington Avenue, De Soto, Kansas, USA |
Late 2031 (Phased commissioning across all nine delivery blocks) |
Active Development / Site Planning Phase |
600 MW initial allocated substation capacity (designed to support scaling) |
|
|
Digital Realty Lelystad Hyperscale Data Center Campus |
Flevokust Haven Industrial Estate, Lelystad, Netherlands |
Q4 2029 |
Planning / Pre-construction |
150 MW Total Substation Allocation |
|
|
Digital Realty Cyberjaya KUL11 32MW AI Campus |
Cyberjaya Digital District, Selangor, Malaysia |
Mid-2028 (Third Phase Completion) |
Fully Operational / Newly Launched |
32 MW Total Dedicated Grid Connection via Tenaga Nasional Berhad (TNB) |
|
|
Digital Realty ICN10: 20MW Sangam DMC High-Density Hub |
12 World Cup buk-ro 60-gil, Mapo-gu, Sangam Digital Media City (DMC), Seoul, 03922, South Korea |
2022 - Q3 |
Active / Fully Operational & Core Connectivity Node (Tracking June 2026) |
12 MW net critical operational IT load driven through an ultimate 20 MW utility power allocation designed for continuous multi-rack clustering |
|
|
Paris Digital Park | Next-Generation 130MW Hyperscale AI Compute Campus |
12-14 Rue de la Gare, 93120 La Courneuve, France |
2026 (Final capacity tranches) |
Operational / Phased Expansion (April 2026) |
130.0 MW |
|
|
Inzai Campus Building 3 (NRT14) | Secure Hyperscale Cloud & Interconnection Hub |
Inzai City, Chiba Prefecture (Greater Tokyo), Japan |
Q1 2026 |
Nearing Completion / Commissioning (Dec 2025) |
Up to 70 kW per rack (High Density) |
|
|
Digital Realty NRT14 (Inzai Campus) |
Inzai City, Chiba Prefecture (Greater Tokyo), Japan |
Late 2026 |
Live / Operational |
31 MW IT Load with 70kW/rack density |
|
|
AMS11 Amsterdam Data Tower Campus by Digital Realty |
Science Park, Amsterdam, Netherlands |
Q3 2026 |
Live / Operational |
27 MW IT Capacity |
|
|
ORD14 Chicago 20MW Franklin Park Interconnect Hub Digital Realty |
Franklin Park, IL 60131 |
Operational |
Operational (April 2026) |
20.0 MW (Utility) |
|
|
Digital Realty PAR12 Paris AI & Connectivity Hub |
16 Avenue Joseph Froelicher, 77600 Ferrières-en-Brie, France |
Operational |
Operational / High-Density Optimized (April 2026) |
20.0 MW |
|
|
Digital Realty Marseille MRS5 River-Cooled AI Hub |
Port of Marseille Fos, Marseille, France |
2027 |
Under Construction (April 2026) |
14.0 MW |
|
|
London III West London Data Center | 56MW Hyperscale AI & Cloud Infrastructure Hub |
Digital Park, Crawley, UK |
2028 |
Under Construction / Phased Expansion (April 2026) |
56.0 MW |
|
|
Blackstone Digital Realty $7 Billion Data Center Portfolio |
Northern Virginia |
2028 |
Active Construction / Phase Rollouts (April 2026) |
500.0 MW (Aggregated) |
|
|
Digital Realty Paris 13: PAR13 Hyperscale |
14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France |
Continuous internal space optimizations and dense cooling retrofits tracking completely active through June 2026 |
Active / Operational |
15 MW gross utility transformer capacity supporting high-density configurations |
|
|
Digital Realty BCN1: 14MW Mediterranean Interconnection Gateway |
Sant Adrià de Besòs Innovation Area, Barcelona, Catalonia |
May 18, 2026 |
Live / Operational (Launched May 18, 2026) |
14 MW Planned IT White Space Load |
|
|
Digital Realty FRA20: 16MW AI-Ready Hyper-Scale Frankfurt |
Digital Park Fechenheim, Frankfurt |
Estimated 2028–2029 (Total Campus) |
Under Construction (Phase 1 Groundbreaking) |
16 MW (IT Load) |
|
|
Digital Realty MAL11 Cyberjaya Data Center |
Cyberjaya, malaysia |
Projected Completion: H2 2026 |
Operational / Phase 2 Expansion (May 2026) |
14.0 MW |
|
|
Digital Realty ROM1 Rome |
Rome West |
2029 |
Under Construction (Phase 1) |
120 MW Total IT Load |
|
|
Digital Realty FRA32 Frankfurt: 9MW AI-Ready Data Center |
Frankfurt am Main |
Operational (Ongoing high-density retrofits) |
Operational / High-Density Upgrade (April 2026) |
9.0 MW |
|
|
Digital Realty FRA18: 16MW AI-Ready Heritage Facility |
Frankfurt |
Estimated late 2027 |
Phase 1 Live (Operational) |
16 MW Total |
|