Digital Realty

Digital Realty is a real estate investment trust that owns, operates, and develops carrier-neutral data centers worldwide. Under the leadership of CEO Andrew Power, it functions as the world's largest wholesale colocation services and data center solutions provider, powering critical cloud, IT, and AI workloads

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Digital Realty MIA10 Miami Data Center: Technical Specs 36 NE 2nd Street, Miami, FL 33132, USA Operational Operational 12.4 MW Total Utility Power Service Connection
Digital Realty AMS8 Pudongweg Data Center: Schiphol Colocation Specs Pudongweg 37, 1437 EM Rozenburg, North Holland, The Netherlands Active Commercial Operations & Cloud Campus Facility Operational ~20 MVA Total Utility Substation Capacity
Digital Realty AMS10 Pudongweg Data Center: Schiphol Colocation Specs Pudongweg 25, 1437 EM Aalsmeerderbrug (Schiphol-Rijk area), The Netherlands Active Commercial Colocation & Interconnection Hub Operational ~31.2 MW Total Utility Power Provision
Digital Realty Paris PAR8 Data Center: 19MW Hyperscale & Enterprise Hub France 2 Avenue Marcel Cachin, 93120 La Courneuve, Paris, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Facility Dual independent high-voltage utility grid feeds, static N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt N+1 standby emergency diesel generator arrays with on-site fuel reserve autonomy.
Digital Realty Marseille MRS6 Data Center: 50MW Sovereign Cloud & AI Hub Avenue Ferdinand de Lesseps, 13320 Bouc-Bel-Air (Marseille Metro Area), France Active Multi-Hall Warehouse Conversion & Campus Development Under Development / Planned Greenfield Conversion ~60.0+ MVA Total Utility Grid Connection Allocation
Digital Realty Marseille MRS1 Data Center: 10MW Mediterranean Subsea Interconnection Hub 40 Avenue Roger Salengro, 13003 Marseille, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Interconnection Hub 10.0 MW Total Utility Power Grid Connection Allocation
Digital Realty CPH3 Data Center Copenhagen: 14MW Hyperscale & Interconnection Hub Industriparken 24, DK-2750 Ballerup, Copenhagen, Denmark Fully Operational Active Facility Fully Operational Hyperscale & Enterprise Facility ~16.0+ MVA Total Utility Grid Supply Allocation
Digital Realty Marseille MRS4 Data Center: 13MW Mediterranean Interconnection Hub ancienne base sous-marine, Enceinte Portuaire, Porte 4, 13015 Marseille, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Hub 13.0 MW Total Utility Critical IT Power Allocation
Digital Realty Toronto North Expansion: 54MW Hyperscale & Enterprise Hub 1 Century Place, Vaughan, ON L4L 8R2, Canada Operational Active Facility with Phased Expansion Fully Operational Hub with Active Expansion 54 MW Secured Critical IT Power Allocation
Digital Realty PAR3 Data Center Paris: Carrier-Neutral Colocation Hub in Saint-Denis 7-9 avenue des Arts et Métiers, 93200 Saint-Denis, France Fully Operational Active Facility Fully Operational Carrier-Neutral Facility ~10 MW to 14 MW Secured Utility Power Allocation
Digital Realty FRA8 Data Center Frankfurt: Carrier-Neutral Hub on Weismüllerstraße Weismüllerstraße 36, 60314 Frankfurt am Main, Germany Fully Operational Active Facility Fully Operational Carrier-Neutral Facility ~8 MW to 12 MW Secured Utility Power Allocation
Digital Realty Vienna Data Center Campus: 32MW CEE Interconnection Hub Louis-Häfliger-Gasse 10 (VIE1 & VIE2) & Siemensstraße 91 (VIE3), 1210 Vienna, Austria Operational Active Campus Operational / Active Expansion 32.0 MW Total Utility Power Supply Allocation
Digital Realty CPH1 Copenhagen Data Center: Ballerup Interconnection Hub Industriparken 20A–20C, DK-2750 Ballerup, Copenhagen, Denmark Operational Active Campus Operational ~4.2 MW Total Utility Supply Allocation
MC Digital Realty Osaka KIX Campus: 70MW Hyperscale & AI Hub Saito Aokita & Saito Yamabuki District, Minoh-shi / Ibaraki-shi, Osaka 562-0029, Japan Operational (Active Whitespace Expansion & AI Density Modernization) Operational (KIX10, KIX11, KIX12, KIX13) / Active High-Density & AI Density Upgrades 70+ MW Critical IT Power Capacity (28 MW KIX11 + 21 MW KIX13 + 13 MW KIX12 + 8 MW KIX10)
Digital Realty BRU3 Brussels: Carrier-Neutral Capital Interconnection Hub Wezembeekstraat 2, 1930 Zaventem, Greater Brussels Metropolitan Area, Belgium Operational / Phased Density and Cooling Upgrades Active Operational / Active Multi-Tenant Modernization & Density Upgrades 1.3 MW Critical IT Power Capacity / 11kV Substation Feed
Digital Realty DUB12 Dublin: 10.3MW Hyperscale & Cloud Hub Clonshaugh Industrial Estate, Clonshaugh Crescent, Dublin 17, D17 AW86, Ireland Operational / Phased AI & Density Density Optimizations Active Operational / Active Multi-Tenant & Cloud Capacity Expansion 10.3 MW Critical IT Power Capacity / ~12 MW Gross Utility Allocation
Digital Realty LON2 London: City Campus Financial Interconnection Hub 11 Hanbury Street (Block C), London E1 6QR, United Kingdom Operational Operational / Active Multi-Tenant & High-Density Density Upgrades 16 MW Utility / Substation Power Allocation
Digital Realty PAR9 Data Center (Paris Digital Park / Interxion PAR9) 3 Avenue Marcel Cachin, 93120 La Courneuve, France (Paris Digital Park Campus) Operational / Continuous Phased Expansion Operational / Active Capacity Phasing 19 MW Critical IT Power Capacity
Digital Realty MRS2 Marseille: Mediterranean Subsea & Interconnection Hub 136 Chemin du Littoral, 13015 Marseille, France (Grand Port Maritime de Marseille) Operational / Phased Expansion 2024–2026 Operational / Active Multi-Phase Capacity Expansion 12 MW Critical IT Power Capacity
Digital Realty MAD4 Madrid: 34MW Hyperscale Data Center Calle de Alfonso Gómez 4, 28037 Madrid, Spain Operational / Phased Expansion 2025–2027 Operational / Active Phased Capacity Expansion 34 MW Critical IT Power Capacity
Digital Realty BER2 Berlin Data Center Campus Strategic Industrial Hub, Greater Metropolitan Berlin Area, Germany 2027 – 2028 Under Development / Active Phased Buildout 32 MW Critical IT Load (Initial Campus Capacity)
Digital Realty London Docklands: 30MW Financial Interconnection Hub 1 Muirfield Crescent (Cloud House) & 227 Marsh Wall (Sovereign House), London E14, UK Operational Operational 30.0 MW total critical IT load across campus facilities
Digital Realty London LHR20 Data Center (Sovereign House) 227 Marsh Wall, London E14 9SD, United Kingdom Operational Operational 4.8 MW – 8.0 MW critical IT load
Digital Realty FRA11 Frankfurt: 9MW Digital Park Ostend Hub Weismüllerstraße 40, 60314 Frankfurt am Main, Germany Operational Operational 9.0 MW total critical IT capacity
Digital Realty Paris Digital Park Campus (PAR8–PAR11) 2 Avenue Marcel Cachin, 93120 La Courneuve, Seine-Saint-Denis, France Q4 2025 (PAR11 Handover completing full 76 MW campus) Operational (PAR8, PAR9, PAR10 Live) / Final Phase Delivery (PAR11) 85 MW gross utility capacity / 76 MW critical IT load
Digital Realty De Soto AI Data Center Campus Astra Enterprise Park, near W. 103rd Street and Lexington Avenue, De Soto, Kansas, USA Late 2031 (Phased commissioning across all nine delivery blocks) Active Development / Site Planning Phase 600 MW initial allocated substation capacity (designed to support scaling)
Digital Realty Lelystad Hyperscale Data Center Campus Flevokust Haven Industrial Estate, Lelystad, Netherlands Q4 2029 Planning / Pre-construction 150 MW Total Substation Allocation
Digital Realty Cyberjaya KUL11 32MW AI Campus Cyberjaya Digital District, Selangor, Malaysia Mid-2028 (Third Phase Completion) Fully Operational / Newly Launched 32 MW Total Dedicated Grid Connection via Tenaga Nasional Berhad (TNB)
Digital Realty ICN10: 20MW Sangam DMC High-Density Hub 12 World Cup buk-ro 60-gil, Mapo-gu, Sangam Digital Media City (DMC), Seoul, 03922, South Korea 2022 - Q3 Active / Fully Operational & Core Connectivity Node (Tracking June 2026) 12 MW net critical operational IT load driven through an ultimate 20 MW utility power allocation designed for continuous multi-rack clustering
Paris Digital Park | Next-Generation 130MW Hyperscale AI Compute Campus 12-14 Rue de la Gare, 93120 La Courneuve, France 2026 (Final capacity tranches) Operational / Phased Expansion (April 2026) 130.0 MW
Digital Realty NRT14 (Inzai Campus) Inzai City, Chiba Prefecture (Greater Tokyo), Japan Late 2026 Live / Operational 31 MW IT Load with 70kW/rack density
Inzai Campus Building 3 (NRT14) | Secure Hyperscale Cloud & Interconnection Hub Inzai City, Chiba Prefecture (Greater Tokyo), Japan Q1 2026 Nearing Completion / Commissioning (Dec 2025) Up to 70 kW per rack (High Density)
AMS11 Amsterdam Data Tower Campus by Digital Realty Science Park, Amsterdam, Netherlands Q3 2026 Live / Operational 27 MW IT Capacity
ORD14 Chicago 20MW Franklin Park Interconnect Hub Digital Realty Franklin Park, IL 60131 Operational Operational (April 2026) 20.0 MW (Utility)
Digital Realty PAR12 Paris AI & Connectivity Hub 16 Avenue Joseph Froelicher, 77600 Ferrières-en-Brie, France Operational Operational / High-Density Optimized (April 2026) 20.0 MW
Digital Realty Marseille MRS5 River-Cooled AI Hub Port of Marseille Fos, Marseille, France 2027 Under Construction (April 2026) 14.0 MW
London III West London Data Center | 56MW Hyperscale AI & Cloud Infrastructure Hub Digital Park, Crawley, UK 2028 Under Construction / Phased Expansion (April 2026) 56.0 MW
Blackstone Digital Realty $7 Billion Data Center Portfolio Northern Virginia 2028 Active Construction / Phase Rollouts (April 2026) 500.0 MW (Aggregated)
Digital Realty Paris 13: PAR13 Hyperscale 14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France Continuous internal space optimizations and dense cooling retrofits tracking completely active through June 2026 Active / Operational 15 MW gross utility transformer capacity supporting high-density configurations
Digital Realty BCN1: 14MW Mediterranean Interconnection Gateway Sant Adrià de Besòs Innovation Area, Barcelona, Catalonia May 18, 2026 Live / Operational (Launched May 18, 2026) 14 MW Planned IT White Space Load
Digital Realty FRA20: 16MW AI-Ready Hyper-Scale Frankfurt Digital Park Fechenheim, Frankfurt Estimated 2028–2029 (Total Campus) Under Construction (Phase 1 Groundbreaking) 16 MW (IT Load)
Digital Realty MAL11 Cyberjaya Data Center Cyberjaya, malaysia Projected Completion: H2 2026 Operational / Phase 2 Expansion (May 2026) 14.0 MW
Digital Realty ROM1 Rome Rome West 2029 Under Construction (Phase 1) 120 MW Total IT Load
Digital Realty FRA32 Frankfurt: 9MW AI-Ready Data Center Frankfurt am Main Operational (Ongoing high-density retrofits) Operational / High-Density Upgrade (April 2026) 9.0 MW
Digital Realty FRA18: 16MW AI-Ready Heritage Facility Frankfurt Estimated late 2027 Phase 1 Live (Operational) 16 MW Total