Europe

Europe – Data Center Regional Overview

Europe is a mature and strategically important data center market, characterized by strong enterprise demand, advanced regulatory frameworks, and a growing emphasis on sustainability. The region serves as a critical hub for cloud infrastructure, financial services, content delivery, and cross-border digital traffic.

Key European markets benefit from robust fiber connectivity, dense subsea cable networks, and proximity to major enterprise and government customers. Increasing adoption of cloud computing, AI workloads, and digital services continues to drive demand for hyperscale and colocation data centers, while edge deployments gain traction to support latency-sensitive applications.

Sustainability plays a central role in European data center development, with operators increasingly investing in renewable energy sourcing, energy-efficient cooling technologies, and carbon-neutral operations. At the same time, strict data protection regulations and planning approvals influence site selection and development timelines.

Europe’s data center landscape is evolving beyond traditional core hubs, with secondary and emerging markets gaining importance due to power availability, land access, and cost optimization. This positions the region for steady long-term growth despite regulatory and infrastructure complexities.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Portugal’s Start Campus Launches SIN01, Advancing a 1.2GW Gigascale Vision Sines, Portugal (Atlantic Coast) 2030+ Operational (First Building, SIN01) 1.2 GW (Secured Total Grid Capacity)
AWS European Cloud Region for Data Sovereignty Germany Initial launch by late 2026; full investment deployed by 2029 Confirmed / Under Construction Significant capacity as part of the total €7.8B investment in the region
Start Campus SINES01 | Next-Generation Data Center Campus in Sines, Portugal ZILS (Sines Industrial and Logistics Zone), Sines, Portugal 2028 - 2030 Under Construction / Phase 1 Operational 1.2 GW
WBS Power / Prime Capital Hyperscale Campus | Co-Located Project Jupiter AI Hub Former military airfield, Brandenburg, Germany Phased development Pre-Construction/Planning (Targeting 2026/2027 Start) 500 MW
DUB20 Hyperscale Campus Arklow, County Wicklow, Ireland (Greater Dublin Area) Target 2028-2030 Under Construction (Initial Phase Piling & Shell) 90 MW
Apto Data Center Campus in Lacchiarella Lacchiarella (Milan Metropolitan Area), Italy N/A Announced / Early Development Phase 300 MW
Global Switch London East GS2 | High-Density Colocation & Infrastructure Expansion London Docklands (East India Dock), United Kingdom Expected completion in the late 2020s. Upgrade/Reconfiguration - Underway 74 MW
Madrid Sur Campus by Echelon Iberdrola Digital Infra Madrid Sur Area, Spain (South of Madrid) N/A (Potential for 700 MW+ across the JV's secured portfolio) Planning / Pre-Construction (Secured Power Connection) 230 MW
Microsoft DUB14 Dublin Data Center | Next-Gen Hyperscale Compute Campus in Ireland Grange Castle Business Park, Clondalkin, Dublin, Ireland Projected over 5-7 years Under Construction / Phased Buildout 240 MW
CyrusOne FRA7 Frankfurt Westside Campus Griesheim (West of Frankfurt), Germany Expected completion in phases over several years. Under Construction 126 MW
SINES 4.0 | Next-Generation Data Center Campus in Sines, Portugal Sines, Portugal (ZILS - Sines Industrial and Logistics Area) Estimated by 2030-2035 (phased) Under Construction/Ongoing Phased Development Up to 1.2 GW
Brookfield AI Data Center Campus Development Strängnäs (Stockholm Metro Area), Sweden Est. 2035 – 2040 (10-15 year construction timeline) Announced / Long-term Development Initial planned expansion from 300 MW to 750 MW
VIRTUS Wustermark Megacampus | Next-Generation Colocation & Digital Infrastructure Campus Wustermark (30 km west of Berlin), Germany Est. 2028-2030 Under Construction / Phased Development Up to 300 MW (Across 9 data center buildings)
Microsoft Middenmeer Campus | High-Performance AI & Cloud Infrastructure Expansion (AMS13/14) Middenmeer, Hollands Kroon (North Holland), Netherlands Long-term development Announced / Under Phased Construction Significant multi-MW capacity added over 50 hectares of new land
Fossefall Data Center | AI Factory for Scalable Cloud & GPU Workloads Fyresdal, Vestfold and Telemark County, Norway Phased towards 500 MW goal by 2030 across the Nordic region. Announced / Acquisition Complete (Late 2025) Commissioning Commissioning Phased conversion, initial AI capacity launch expected H Initial 5.5 MW (Existing reserved capacity)
Google Data Center Expansion, Saint-Ghislain Campus Saint-Ghislain, Hainaut Province, Belgium Continuous phased expansion over the next decade. Announced / Active Expansion (Investment committed late 2025) Significant increase from current load; scaled to support multi-phase gigawatt-scale AI requirements.
Amsterdam Hyperscale Campus Greater Amsterdam Region, Netherlands To be determined (Likely multi-year development) Announced / Pre-Construction (Lease Secured) Up to €1 Billion in construction investment; Hyperscale scale, multi-megawatt IT load.
Frankfurt Hyperscale Campus Colt DCS 4 & 5 Rhine-Main Region, Frankfurt, Germany TBC Announced / Land Secured & Power Contracts Signed 63 MW (Total IT Load)
Vantage CWL1 Cardiff | Next-Generation Colocation & Digital Infrastructure Campus Celtic Way, Newport, South Wales, UK Estimated completion of all three buildings by 2026-2027 Partially Operational / Expanding 148MW+ (Upgradeable)
Equinix Lelystad AI Data Center (AMS10) Flevokust Haven, Lelystad, Netherlands 2030 Planning / Pre-Construction 150 MW Dedicated Site Power
QuantumBasel Tempo Hub | IonQ Quantum Computing & Data Science Platform uptownBasel Campus, Arlesheim/Basel, Switzerland 2029 Active Expansion / Technology Integration Scalable Hub (Quantum systems are high-efficiency)
Goodman GEDCDP | European Data Centre Development & Investment Partnership Frankfurt (Germany), Amsterdam (Netherlands), Paris (France) 2030 Announced / Pre-construction 435 MW Total Portfolio
AMS11 Amsterdam Data Tower Campus by Digital Realty Science Park, Amsterdam, Netherlands Q3 2026 Live / Operational 27 MW IT Capacity
Sesterce "Rhône-Alps" AI Mega-Campus Lyon-Valence Logistics Hub, Auvergne-Rhône-Alpes 2032 Latest Launch (Active Execution Phase - Jan 2026) 1 GW (Initial Execution)
Hertfordshire Campus Equinix DC01UK Hertfordshire, UK 2029 Under Development / Construction Phase 250 MW IT Load
Villasequilla AI Campus | High-Performance AI Compute & Connectivity Facility Villasequilla, Spain 2029 Approved / Ready-to-Build (RTB) 600 MW IT Load
Digital Realty FRA18: 16MW AI-Ready Heritage Facility Frankfurt Estimated late 2027 Phase 1 Live (Operational) 16 MW Total
DayOne Nurmijärvi: 300MW Renewable AI Campus Nurmijärvi, Finland 2030 Phase 1 Groundbreaking / Early Construction 300 MW (Total Campus Buildout)
Mediterra Barcelona: 12MW AI-Ready Edge-Hyperscale Hub Strategic site in Catalonia, near Barcelona 2029 Launched / Site Acquired (Feb 20, 2026) Secured 12 MW
Osae-NFU 250MW AI Data Center Bordeaux France Former Industrial Site, Bordeaux Metropole 2029 Groundbreaking (Today) 250 MW IT Load
Digital Realty FRA20: 16MW AI-Ready Hyper-Scale Frankfurt Digital Park Fechenheim, Frankfurt Estimated 2028–2029 (Total Campus) Under Construction (Phase 1 Groundbreaking) 16 MW (IT Load)
Google Skien Norway: 240MW Hyperscale AI-Ready Data Center Skådalsvegen, Skien, Telemark, Norway 2030 (Planned 840 MW) Live / Commissioning 240 MW
atNorth SWE04 Sollefteå AI Campus (300 MW) Sollefteå (Långsele) 2031 Announced (Feb 24, 2026) 300 MW Total Utility Capacity
AWS Aragon Expansion: 33.7B Euro AI & Cloud Infrastructure Zaragoza, Multi-site: Zaragoza, Huesca, and Teruel (Aragon Region) 2030 Announced / Under Expansion Total regional capacity projected at 1 GW+ by full buildout
DT-NVIDIA AI Factory Munich: €1B 10,000 Blackwell GPU Hub Munich (Refurbished Industrial Site) 2028 Go-Live: March 4, 2026 10,000 NVIDIA Blackwell GPUs (Initial phase)
Google Waltham Cross: $1B AI Data Centre Hertfordshire UK , Waltham Cross, Hertfordshire 2026 Operational (Inaugurated Sept 2025) Estimated 100 MW Utility Feed
Google Dietzenbach: €5.5B AI Data Center & Heat Recovery Germany Dietzenbach (near Frankfurt), Hesse 2029 Under Construction / Groundwork (March 2026) Part of a regional 4-GW-ready German grid strategy.
Project Lusitanus Mérida: €2.8B AI Data Center FRV Spain Mérida (Extremadura) 2029 Under Construction / Phase 1 Foundations (March 2026) 1,000 MW (1 GW) Target
Nostrum Evergreen Badajoz: €1.9B 500MW AI Data Center Spain Badajoz 2029 (for 500MW) Permitting / Pre-Construction (March 2026) 500 MW
Microsoft Italy Project Raven | Next-Gen 800MW AI & Data Center Platform Lombardy and Lazio, Milan 2027 Operational / Rapid Scaling Phase (March 2026) 800 MW
Newport Wales Data Centre | Microsoft £2.5B AI-Ready Hyperscale Campus (200MW) Newport, Wales 2028 Under Construction / Fit-out (March 2026) 200 MW
Google Netherlands Winschoten | High-Performance AI & Hyperscale Cloud Hub Winschoten (Municipality of Oldambt), Groningen 2026 (Active Scaling) Operational (Opened November 18, 2025) ~200 MW (Phase 1)
Lappeenranta AI Factory | Nebius 310MW Hyperscale Liquid-Cooling Infrastructure Lappeenranta 2028 Announced / Pre-Construction (March 31, 2026) 310 MW
Nascale Norway Narvik | $1B 520MW AI Gigafactory Narvik (Kvandal), Nordland 2028 Under Construction / Initial Phase (April 2026) 520 MW
Digital Realty FRA32 Frankfurt: 9MW AI-Ready Data Center Frankfurt am Main Operational (Ongoing high-density retrofits) Operational / High-Density Upgrade (April 2026) 9.0 MW
Google Azores Nuvem & Sol | 10MW AI-Ready Subsea Connectivity Data Center Tecnoparque da Lagoa, São Miguel, Azores Q1 2027 Under Construction (April 2026) 10 MW
Digital Realty PAR12 Paris AI & Connectivity Hub 16 Avenue Joseph Froelicher, 77600 Ferrières-en-Brie, France Operational Operational / High-Density Optimized (April 2026) 20.0 MW
Paris Digital Park | Next-Generation 130MW Hyperscale AI Compute Campus 12-14 Rue de la Gare, 93120 La Courneuve, France 2026 (Final capacity tranches) Operational / Phased Expansion (April 2026) 130.0 MW
Digital Realty Marseille MRS5 River-Cooled AI Hub Port of Marseille Fos, Marseille, France 2027 Under Construction (April 2026) 14.0 MW
London III West London Data Center | 56MW Hyperscale AI & Cloud Infrastructure Hub Digital Park, Crawley, UK 2028 Under Construction / Phased Expansion (April 2026) 56.0 MW
Prime Finland: €6B Järvenpää AI-Ready 550MW Campus Vähänummi Industrial Area, Järvenpää 2031 EIA Phase / Pre-Development (April 2026) 550 MW
Vantage BER1 Brandenburg | 56MW Hyperscale AI & Cloud Infrastructure Hub 25-Acre Campus within Brandenburg Park 2026 Operational / Active Phase 2 & 3 Expansion (April 2026) 56.0 MW
Google Kronstorf AI Data Center Business Park Kronstorf 2029 Under Construction (Groundbreaking) 150 MW IT Load
Digital Realty ROM1 Rome Rome West 2029 Under Construction (Phase 1) 120 MW Total IT Load
Pantheon AI Topusko Zagreb 2032 Announced / Permitting 500 MW IT Load
Nexus-1 | 100MW Distributed AI Cloud & High-Performance Compute Hub Distributed across Southern France 2028 (1,000 Units Worldwide) Groundbreaking / Launch Phase 100 MW (First 100 Units)
Equinix MD5 Madrid | Next-Gen AI Data Center Launching Q2 2026 in Southern Europe Madrid Metropolitan Area NA In Development / Targeted Q2 2026 Opening Multi-MW Scalable
Pangea 5 Supercomputer | €100M AI Compute & Sustainable Energy Infrastructure Hub Technical Center (CSTJF) pau 2027 Project Announced / Design Phase (May 6, 2026) Scalable High-Density (HPC Optimized)
TikTok Lahti | €1 Billion AI-Ready Expansion for European Data Sovereignty Lahti, Finland H2 2027 Phase 1 Planning / Tenant Agreement Signed (May 2026) 128.0 MW (Full Build)
Microsoft Centurion Spain: 300MW Aragon Hyperscale AI Region Centrovía Industrial Park, La Muela (Zaragoza) 2029 (Projected) Phase 1 Commissioning / Active Buildout 300 MW (Campus Total)
Maincubes BER2: 186MW AI-Ready Hyperscale Campus Berlin Luckenwalde, South of Berlin Late 2027 Under Construction (Phase 2 Groundbreaking May 2026) 186 MW Total Utility Power
Transatlantic Innovation Campus: 500MW AI Hub Croatia Dugopolje 2030 Under Construction (Announced May 2026) 500 MW Total Utility Power
Equinix AM11 International Business Exchange™ Lemelerbergweg 28, 1101 AH Amsterdam 2026 / early 2027 Operational / Continuous Interconnection Optimization (May 2026) 9.0 MW
Equinix AM5: 13MW High-Density Amsterdam South East Hub Amsterdam Continuous Expansion / 2026 AI Infrastructure Upgrades Live / Operational (Active AI-Ready Upgrades) 13 MW Total Utility Supply
CyrusOne MIL1: 27MW Eco-Sovereign Data Center Milan Via delle Regioni, Segrate, Lombardy Late 2028 Under Construction (Groundbreaking March 25, 2026) 35 MW Total Utility Connection
CyrusOne AMS1: 54MW Hyperscale Amsterdam-Gateway Campus Linieweg 1, 1165 AA Halfweg (Haarlemmerliede) Ongoing / 2025-2026 Live / Operational (Active AI-Density Modernization) 54 MW IT Load (27 MW Dedicated per Building)
NTT Amsterdam 1: 40MW High-Density Network Gateway Aviolanda 1, 1437 Rozenburg 2025–2026 Live / Operational (Active AI-Density Modernization) 40 MW Total White Space Capacity
Equinix PA10: 15MW Highly Connected Eco-Hub Paris 114 Rue Ambroise Croizat, 93200 Saint-Denis 2025–2026 Live / Operational (Active AI Liquid-Cooling Upgrades) 15 MW Total Utility Connection
Digital Realty BCN1: 14MW Mediterranean Interconnection Gateway Sant Adrià de Besòs Innovation Area, Barcelona, Catalonia May 18, 2026 Live / Operational (Launched May 18, 2026) 14 MW Planned IT White Space Load
Project Monet: €2.2B High-Density Hyperscale AI Campus Île-de-France Corridor Late 2027 Approved / Pre-Construction Planning (Siting Finalized May 2026) 360 MW Maximum Allocated Site Power Envelope
Yondr London Slough Building 3: 40MW Hyperscale Data Center Slough SL2 5EJ, United Kingdom May 2026 (Complete 3-Building Campus Operational) Operational / Ready for Service (Achieved May 7, 2026) 100 MW+ Ultimate Combined Campus Substation Grid Allocation
Vantage Cardiff CWL12 The Celtic Way Glasgow, UK Estimated 2031 Planned / Site Infrastructure Under Development 120 MW maximum expansion capacity
Mistral AI EcoDataCenter 150MW Sustainable Sweden AI Campus Falun, Sweden Estimated 2029 Under Construction 150 MW maximum allocated grid capacity
Málaga Digital Gateway 45MW Tier III Andalusian Data Center Andalucía Tech Park District, Spain Estimated 2030 Planning & Site Acquisition Approved 45 MW gross facility footprint capacity
EdgeConneX Italy Hyperscale Expansion Milan Technology Hub, Italy Comprehensive portfolio development and final phase completions scheduled to scale through 2031 Active Development Phase 300 MW cumulative gross utility power allocation across three core deployment sites
Ark Data Centers Barcelona Project Montjuic 45 MW Investment La Maquinista, Barcelona, Spain Sequential multi-floor modular expansion phases projected to reach full capacity by 2031 Active Engineering & Permitting Phase 45 MW gross electrical capacity delivered via independent high-voltage utility lines
Equinix xScale Paris Hyperscale Data Center Expansion (23MW) 114 Rue Ambroise Croizat, 93200 Saint-Denis February 2025 (PA13x fully operational and pre-leased) Operational 23 MW total across primary xScale modules (expandable via future phases)
Frankfurt Central IV Hyperscale Data Center 186MW Campus Frankfurt, EU Q4 2028 Under Construction 186 MW Net IT Capacity
Civicos Networking: Roubaix Cloud Node 1 Rue Kellermann, 59100 Roubaix, France Seamlessly integrated into a multi-facility cluster including sister nodes in Tenerife, Lanzarote, and Madrid Active / Operational Cloud Services Node Up to 1.6 MW total localized operational power threshold, with densities scaling from 1.2 kW up to 10 kW per rack depending on hardware layout
EXA Mareuil sur Ay Mareuil-sur-Ay (Marne) Continuous "build-to-suit" internal data hall adaptations executing based on carrier and enterprise interconnect requirements Active / Fully Operational Core Network & Colocation Node Scalable multi-megawatt allocation providing high-reliability power feeds to partial, full, and multi-cabinet cage deployments
Digital Realty Paris 13: PAR13 Hyperscale 14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France Continuous internal space optimizations and dense cooling retrofits tracking completely active through June 2026 Active / Operational 15 MW gross utility transformer capacity supporting high-density configurations
SoftBank Dunkirk AI Campus: 3.1GW Sovereign Mega-Hub Port of Dunkirk (Loon-Plage), Hauts-de-France Region, France Sequential regional campus completions across Dunkirk, Bosquel, and Bouchain tracking for full delivery by 2031 Active / Pre-Construction & Fast-Track Planning Phase (Announced June 2026) 3,100 MW regional allocation delivered via dedicated on-site 400 kV extra-high-voltage substations
Yondr Frankfurt FRA02: 40MW Hyperscale Bischofsheim Node Industrial Zone Am Schindberg, 65474 Bischofsheim, Hesse, Germany Continuous modular server hall fit-outs pacing sequentially across the multi-story footprint through 2029 Active / Under Heavy Structural Construction (Tracking June 2026) 40 MW gross utility line allocation feeding high-density rows scaling past 25 kW per rack
NTT London LON3: 24MW High-Density Dagenham AI Campus Yew Tree Ave, Dagenham RM10 7FZ, United Kingdom Continuous modular data hall expansion scaling sequentially across the campus footprint through 2029 Active / Under Heavy Structural Construction (Tracking June 2026) 24 MW gross utility capacity delivered via fully redundant, dedicated on-site transformer blocks
Data4 Escaudain: €5B 700MW Hyperscale Campus in France Former Parc des Soufflantes Industrial Redevelopment Site, Escaudain, Northern France 2032 - Q4 Active / Master Planning & Environmental Site Permitting Phase (Tracking June 2026) 700 MW gross ultimate site power allocation engineered to sustain high-density AI server clusters and next-generation compute configurations
Equinix MD6 Madrid 3.5MW Colocation Campus Calle de la Pedriza, 12, 28108 Alcobendas, Madrid, Spain Q2 2027 (Final BME Matching Engine Migration) Operational 3.5 MW Marketed Power
Milan CyrusOne MIL2 54MW Hyperscale Data Center Via Raffaele Rubattino no. 90, 20134, Milan, Italy Q4 2028 Under Development / Planning 90 MVA Dual Active High-Voltage Supply Allocation
London Kao Data KL03 40MW AI-Ready Data Center Park Royal, West London, UK Q4 2029 Under Development / Planning 40 MW Dedicated Critical Power Allocation
Digital Reef Havering 600MW AI Tech Campus London 499-Acre Fen Lane & North Ockendon Site, Havering Green Belt Corridor, East London Incremental 12-building campus expansions rolling out sequentially across a 5-to-10-year horizon Under Construction 200MW Phase 1 configuration (scalable up to 600MW full site allocation)
Google Horndal: New 150MW Air-Cooled Sweden Data Center Greenfield industrial zone, Horndal, Avesta Municipality, Dalarna County, Sweden Projected 2030 Groundbreaking Achieved / Active Civil Construction (June 2, 2026) 150.0 MW Phase 1 Baseline Capacity
Bucharest ClusterPower 800MW Off-Grid AI Infrastructure Factory Strada Viitorului nr.2, 207405 Mlecănești, Romania Q2 2030 Under Construction (Phase 1 Fast-Track) 800 MW
Cambois Northumberland 720MW Massive Hyperscale Campus Northumberland , england Q4 2031 Under Construction (Enabling Works / Phase 1) 720 MW
Solleftea atNorth 300MW High-Density Nordic AI Campus SWE04 Industrial Zone, Solleftea, Sweden Q4 2029 Under Construction (Phase 1 Framing) 300 MW
Paris Verne 500MW Sovereign AI High Performance Campus 36-43 Great Sutton St, London EC1V 0AB, United Kingdom Q4 2030 Under Construction (Phase 1 Groundwork) 500 MW
Project Boreas: 800MW Nordic Hyperscale Campus Northern Sweden (Nordic Region) 2031 Groundbroken / Under Construction 800 MW dedicated capacity
Granada: €3B Alto Infrastructure SP01 AI & HPC Campus Spain Escúzar, Granada (Andalusia) 2029 Groundbreaking Initiated 70 MW total master-planned power footprint (50 MW dedicated IT load)
Philippsburg: 707MW Project Engrida Hyperscale Data Center Campus Germany Former Goodyear Tire Factory & Decommissioned Philippsburg Nuclear Power Plant (KKP Site) 2032+ Pre-Construction / Municipal Council Preliminary Approval Received 707 MW total grid capacity allocation (Supporting an estimated ~550 MW of continuous critical IT infrastructure)
Vantage Frankfurt II FRA21 56MW AI Megacampus Alexander-von-Humboldt-Straße, 65479 Raunheim, Germany Mid-2026 Fully Operational / Undergoing Active High-Density Upgrades 100 MVA Dedicated On-Site Substation via Westnetz
Microsoft Azure NRW Germany 300MW AI Megacampus Rheinisches Revier Industrial Zone, NRW, Germany H2 2027 Fully Operational / Newly Launched 300 MW Dedicated High-Voltage Transmission Substation Connection
Digital Realty Lelystad Hyperscale Data Center Campus Flevokust Haven Industrial Estate, Lelystad, Netherlands Q4 2029 Planning / Pre-construction 150 MW Total Substation Allocation
Black Sea AI Gigafactory Campus (500MW Capacity) Constanța Logistics Zone, Black Sea Coast, Romania Q4 2031 Approved / Pre-construction 500 MW total utility power allocation
Google Farciennes AI-Ready Data Center Campus Rue de la Neuville 21, 6240 Farciennes, Belgium Q4 2029 Under Construction 300 MW total utility power allocation
Hscale MXP2 Hyperscale Milan Campus Milan Industrial District, Italy Q2 2030 Under Construction / Development 120 MW total allocated utility power
G2S Bourges Data Center: Tier III Groupama Core Facility Rue Denys Dodard, 18000 Bourges, France Q2 2015 (Complete operational stabilization) Fully Operational 5 MW total allocated utility grid connection
EXA Edge DC Poitiers: High-Availability French Node Zone d’Aménagement Concerté de Saint-Eloi, 86021 Poitiers, France Q4 2021 (Acquisition and asset integration under the EXA Infrastructure brand) Fully Operational 2.0 MW total dedicated operational utility power
SoftBank Northern France AI HyperCampus: 3.1GW Mega Hub Port of Dunkirk Western Harbour Zone, Loon-Plage, Hauts-de-France, France Q4 2033 (Realization of adjacent advanced electronics and containment assembly facilities) Pre-construction / Site Engineering (Announced May 2026) 1.0 Gigawatt (GW) initial active site substation capability
Vantage Dublin DUB1 Campus: 52MW Hyperscale Data Hub Profile Park, Clondalkin, Dublin 22, Ireland H2 2028 (Final system integration and handover of the second facility block) Active Construction Phase 52 MW dedicated server-ready power deployment
Pure DC Amsterdam Westpoort Hyperscale Campus (78 MW) Donauweg 12, Westpoort, Amsterdam 2027 (All 3 towers operational) Under Construction 78 MW Total Site Capacity
STT Frankfurt 1 Hyperscale Data Centre Campus (96 MW) Business Park, Hanauer Landstraße, Frankfurt am Main Late 2028 Under Construction 96 MW Total Scalable Substation Capacity
QTS Northumberland: 720MW UK Hyperscale AI Campus 133-acre (540,000 sqm) former Britishvolt site, Cambois, Northumberland NE24, UK 2035 (Phased completion across all 10 planned buildings) Under Construction (Enabling Works & Site Remediation Active) 720 MW total allocated utility grid capacity
Digital Realty Paris Digital Park Campus (PAR8–PAR11) 2 Avenue Marcel Cachin, 93120 La Courneuve, Seine-Saint-Denis, France Q4 2025 (PAR11 Handover completing full 76 MW campus) Operational (PAR8, PAR9, PAR10 Live) / Final Phase Delivery (PAR11) 85 MW gross utility capacity / 76 MW critical IT load
Vantage FRA1 Frankfurt: 56MW German Hyperscale Data Center Campus Goethering 27, 63067 Offenbach am Main, Hesse, Germany 2026–2027 (Completion across all 3 campus buildings) Operational / Active Campus Expansion 56 MW total critical IT capacity
Digital Realty FRA11 Frankfurt: 9MW Digital Park Ostend Hub Weismüllerstraße 40, 60314 Frankfurt am Main, Germany Operational Operational 9.0 MW total critical IT capacity
Digital Realty London Docklands: 30MW Financial Interconnection Hub 1 Muirfield Crescent (Cloud House) & 227 Marsh Wall (Sovereign House), London E14, UK Operational Operational 30.0 MW total critical IT load across campus facilities
Digital Realty London LHR20 Data Center (Sovereign House) 227 Marsh Wall, London E14 9SD, United Kingdom Operational Operational 4.8 MW – 8.0 MW critical IT load
Ada Infrastructure London Docklands: 210MW AI Data Campus St. Vincent Ferrer Lane, Silvertown, London E16 2AP, United Kingdom Active multi-phase development (Phase 1 delivery 2027) Under Construction (Broke ground March 2026) 210.0 MW total critical IT load (3 x 70 MW buildings)
Pure DC Brent Cross LON01 Expansion (LON01B2) Harp View, 12 Priestley Way, Brent Cross, London NW2 7AL, United Kingdom Q2 2029 (LON01B2 completion / 90 MW campus target) Under Construction (Active live campus expansion; West Cold Shell phase awarded) 90.0 MW campus total IT load (70 MW added via LON01B2)
Pure DC Seinäjoki: 550MW Hyperscale Finland AI Campus Ämmäläntie & Törnäväntie, Pihlajaniemi, 60200 Seinäjoki, Finland Multi-phase 10-year development master plan (550+ MW total capacity) Under Construction 550.0 MW total critical IT capacity (110 MW Phase 1 capacity fully leased)
Equinix LD11x Expansion: London Slough Hyperscale xScale Hub 765/767 Henley Road, Slough Trading Estate, Slough, SL1 4JW, United Kingdom Q4 2023 – 2025 (Full 19 MW Capacity Expansion) Operational / Fully Energized Phase Expansion ~24+ MW Utility Capacity / 19 MW Critical IT Load
Iron Mountain AMS-1 Data Center Campus Expansion J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-acre campus) Q2 2027 (+10 MW Expansion Go-Live) / 2028–2030 (Full 43.1 MW Campus Target) Operational / Active Multi-Phase Campus Expansion 43.1 MW Total Utility Capacity (13.1 MW Active / +10 MW Phase 2 / +20 MW Phase 3)
Vantage Data Centers Milan: 96MW Italian Hyperscale & AI Infrastructure Hub Milan, Metropolitan City of Milan, Lombardy, Italy 2027–2029 (Full 96 MW regional multi-campus completion) Active Operation (MXP1) / Active Expansion Construction (MXP2) 96 MW Critical IT Power (64 MW MXP1 + 32 MW MXP2)
Vantage Data Centers Warsaw WAW1: 48MW CEE Hyperscale Hub Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw, Poland (12-acre campus) 2025–2026 (Building 2 Full Buildout) Operational / Active Multi-Building Phase Expansion 48 MW Critical IT Load (16 MW Building 1 + 32 MW Building 2)48 MW Critical IT Load (16 MW Building 1 + 32 MW Building 2)
Digital Realty BER2 Berlin Data Center Campus Strategic Industrial Hub, Greater Metropolitan Berlin Area, Germany 2027 – 2028 Under Development / Active Phased Buildout 32 MW Critical IT Load (Initial Campus Capacity)
Digital Realty MAD4 Madrid: 34MW Hyperscale Data Center Calle de Alfonso Gómez 4, 28037 Madrid, Spain Operational / Phased Expansion 2025–2027 Operational / Active Phased Capacity Expansion 34 MW Critical IT Power Capacity
Digital Realty MRS2 Marseille: Mediterranean Subsea & Interconnection Hub 136 Chemin du Littoral, 13015 Marseille, France (Grand Port Maritime de Marseille) Operational / Phased Expansion 2024–2026 Operational / Active Multi-Phase Capacity Expansion 12 MW Critical IT Power Capacity
Digital Realty PAR9 Data Center (Paris Digital Park / Interxion PAR9) 3 Avenue Marcel Cachin, 93120 La Courneuve, France (Paris Digital Park Campus) Operational / Continuous Phased Expansion Operational / Active Capacity Phasing 19 MW Critical IT Power Capacity
Digital Realty LON2 London: City Campus Financial Interconnection Hub 11 Hanbury Street (Block C), London E1 6QR, United Kingdom Operational Operational / Active Multi-Tenant & High-Density Density Upgrades 16 MW Utility / Substation Power Allocation
Digital Realty DUB12 Dublin: 10.3MW Hyperscale & Cloud Hub Clonshaugh Industrial Estate, Clonshaugh Crescent, Dublin 17, D17 AW86, Ireland Operational / Phased AI & Density Density Optimizations Active Operational / Active Multi-Tenant & Cloud Capacity Expansion 10.3 MW Critical IT Power Capacity / ~12 MW Gross Utility Allocation
Digital Realty BRU3 Brussels: Carrier-Neutral Capital Interconnection Hub Wezembeekstraat 2, 1930 Zaventem, Greater Brussels Metropolitan Area, Belgium Operational / Phased Density and Cooling Upgrades Active Operational / Active Multi-Tenant Modernization & Density Upgrades 1.3 MW Critical IT Power Capacity / 11kV Substation Feed
Iron Mountain AMS-2 Amsterdam: 10MW Hyperscale & AI Expansion J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-Acre Amsterdam Campus) 2028–2030 (Full 43.1 MW campus buildout) Active Development / Construction Phase 10 MW Critical IT Power Capacity (AMS-2) / 43.1 MW Total Campus Substation
Iron Mountain FRA-2 Frankfurt: 10.6MW Hyperscale & Connectivity Hub Am Martinszehnten Industrial Park, 60437 Frankfurt am Main, Germany Operational / Active Modernization & AI High-Density Modernization Operational / Active Multi-Tenant Capacity Expansion & Upgrades 10.6 MW Critical IT Power Capacity (FRA-2) / 37.6 MW Combined Campus Total
Iron Mountain LON-2 London Slough: 27MW Hyperscale Data Center 110 Buckingham Avenue, Slough Trading Estate, Slough SL1 4PF, United Kingdom Operational Operational / Fully Commissioned Wholesale Facility 27 MW Critical IT Power Capacity / 32+ MW Utility Substation Feed
Colt DCS London Hayes Campus Expansion: 160MW Hyperscale & AI Hub Hayes Digital Park, London Borough of Hillingdon, West London, United Kingdom 2029–2032+ (Phased delivery across London 6, 7, and 8) Approved / Pre-Construction Phase (Construction Start: 2026) 97 MW Expansion Capacity / 160 MW Total Campus Capacity
Nabiax Alcalá Madrid Campus: 100MW Hyperscale Data Center Expansion Av. Punto Com, 23, 28805 Alcalá de Henares, Madrid, Spain 2026–2029+ (Phased delivery to 100 MW) Operational / Active Multi-Phase Hyperscale Expansion 22.3 MW Operational IT Power / 100 MW Total Campus Power Potential
atNorth FIN02 Helsinki Expansion: 45MW High-Density AI & HPC Campus Sinimäentie 6, 02630 Espoo, Greater Helsinki Area, Finland Q3/Q4 2027 (Completion of 45 MW Expansion Extension) Active Construction Phase (5-Story Extension Underway) 35 MW Critical IT Power Capacity / 45 MW Gross Substation Feed
Bulk OS-IX Oslo Internet Exchange: 14MW Carrier-Neutral Data Center Hans Møller Gasmanns vei 9, 0594 Oslo, Norway Operational / Continuous AI & High-Density Modernization Operational / Active High-Density & AI Expansion Phase 14.4 MW Critical IT Power Capacity
NTT DATA FRA5 Frankfurt: 80MW Sovereign AI & Hyperscale Campus Greater Frankfurt Metro Corridor / Offenbach East Region, Hesse, Germany 2027–2029+ (Phased delivery across multi-building expansion blocks) Active Construction & Site Development Phase 80 MW Critical IT Power Capacity
Vantage Data Centers WAW2 Warsaw: 48MW Hyperscale & Cloud Hub ul. Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw (Bielany District), Poland 2025–2026 (Completion of Building 2 / WAW2 Expansion) Operational (Building 1) / Active Expansion (Building 2 / WAW2) 48 MW Critical IT Power Capacity
Data4 Milan Data Center Campus: 270MW AI Digital Hub Cornaredo (MIL01: Via Monzoro, 101-105) & Vittuone (MIL02: Via Giovanni Pascoli), Metropolitan City of Milan, Italy 2028–2030 (Completion of all 18 Data Center Buildings across MIL01 & MIL02) Operational (MIL01 Phase 1–DC09) / Active Construction & Expansion (MIL01 expansion & MIL02) 170 MW (MIL01 Campus) + 100 MW (MIL02 Campus) = 270 MW Total Capacity
CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area) 2026–2027 (Building 2 & Final AI High-Density Expansion) Operational / Active Phased Development & Expansion 54 MW Total Critical IT Load (27 MW per building) / 90 MVA Grid Capacity
Colt DCS Leeds Data Centre Campus: High-Density UK Digital Hub Leeds Metropolitan Area, West Yorkshire, United Kingdom Targeted 2027–2028 Active Development / Planned Regional Expansion ~20 MW – 40 MW Grid Supply Capacity
Echelon DUB20 Arklow Data Center Campus: 100MW Hyperscale Infrastructure Hub Ireland Avoca River Park / Vale Road, Arklow, Co. Wicklow, Ireland Targeted 2026–2027+ Under Construction / Phased Grid Integration & Site Development ~100 MW – 120 MW Utility Connection Capacity
atNorth HEL1 AI Data Center Helsinki Finland: Sustainable High-Density & AI Computing Hub Kuortaneenkatu 3, 00510 Helsinki, Finland Fully Operational / Ongoing High-Density AI Expansions Operational / Upgraded for AI & High-Density Workloads ~1.5 MW Utility Supply Connection
Etix Everywhere Regional Edge Data Center Network: Sovereign French Infrastructure Multi-site French Regional Edge Portfolio (e.g., ETIX Paris #3: Vélizy-Villacoublay, Yvelines; ETIX Nantes #1–#3: Chantenay/Saint-Herblain) Continuous Expansion & New Edge Acquisitions Operational / Active Regional Edge Expansion ~2.0 MW to 7.0 MW per regional facility module (~20 MW–50 MW network total)
KevlinX BRU01 Brussels Data Center Campus: 32MW+ AI-Ready Hub Avenue Antoon Van Oss / Av. Antoon Van Oss, 1120 Brussels, Belgium 2026–2027 (Phased Whitespace Expansion) Operational (Live as of Q1 2026) ~32 MW Critical IT Power (~68 MW Utility Power Capacity)
MERLIN Edged LIS2 Lisbon Data Center Campus: 180MW Waterless AI Hub Plataforma Logística Lisboa Norte, Freguesia de Castanheira do Ribatejo, Vila Franca de Xira, 111405, Portugal 2027–2029+ (Phased 5-Facility Expansion) Under Construction / Active Phase 1 Buildout 180 MW Critical IT Power (Expandable to 300 MW)
Digital Realty CPH1 Copenhagen Data Center: Ballerup Interconnection Hub Industriparken 20A–20C, DK-2750 Ballerup, Copenhagen, Denmark Operational Active Campus Operational ~4.2 MW Total Utility Supply Allocation
Beyond.pl WRO1 Wrocław Data Center Campus: 150MW AI-Ready Hub Strategic Industrial & Tech Corridor, Wrocław, Lower Silesia, Poland 2027–2029+ Under Development / Planned Expansion 150 MW Total Utility Capacity Allocation
Green ZRH1 Zurich West Data Center Campus: High-Density Lupfig Hub Industriestrasse 31–33, 5242 Lupfig, Aargau, Switzerland Operational Active Expansion Operational / Active Expansion (Zurich West 4) 40 MW+ Total Utility Allocation
STACK Infrastructure AMS3 Amsterdam Data Center Campus: Hyperscale AI Hub Strategic Hyperscale Corridor, Amsterdam Metropolitan Area, Netherlands Phased Multi-Stage Expansion Planned / Under Development ~50 MW – 100 MW Utility Power Allocation
Colt LHR2 London West Data Center Campus: 9.4MW Park Royal Hub 13 Volt Avenue, Park Royal, London NW10 6PW, United Kingdom Operational Operational 15.0 MVA Total Utility Supply Provision
Data4 Madrid MAD2 Data Center Campus: 80MW AI-Ready Hub Polígono Industrial Sur, 28750 San Agustín del Guadalix, Madrid, Spain 2026–2028+ (Phased Multi-Building Rollout) Under Construction / Active Multi-Building Phase Buildout 80 MW Total Utility Capacity Allocation
EcoDataCenter Östersund Data Center Campus: 150MW Sustainable HPC Hub Municipality of Östersund, Jämtland County, Sweden 2026–2028+ (Phased Multi-Building Expansion) Under Construction / Phased Campus Buildout 150 MW Total Utility Capacity Allocation
EcoDataCenter Falun Data Center Expansion: 80MW Sustainable AI Hub Slaggvarpsvägen 21, 791 77 Falun, Dalarna County, Sweden Operational Active Expansion Active Multi-Building Expansion / Under Construction 80 MW Total Secured Utility Power Capacity
Green Mountain OSL1 Oslo Data Center Campus: 93MW Sustainable Hub Granittveien 100, 1914 Ytre Enebakk, Norway Operational Active Expansion Operational / Active Expansion 93 MW Total Utility Supply Allocation
Bulk Infrastructure Gothenburg Data Center Campus: Nordic AI Hub Strategic Industrial Corridor, Gothenburg, Västra Götaland County, Sweden Phased Multi-Building Rollout Planned / Under Development ~50 MW – 80 MW Total Secured Utility Capacity Allocation
KevlinX Brussels Data Center Campus: 32MW+ AI-Ready Hub Av. Antoon Van Oss 1, 1120 Brussels, Belgium Active Multi-Building Campus Expansion Operational / Phased Active Expansion 32 MW – 68 MW Total Utility Power Allocation
Echelon DUB20 Data Center Campus: Ireland's 100MW Sustainable Hyperscale Hub Avoca River Park, Vale Road, Arklow, Co. Wicklow, Ireland Operational Active Campus Expansion Operational / Active Expansion Phase 100 MW Secured Grid Utility Power Allocation
Yondr Group Frankfurt Data Center Campus: 40MW Hyperscale Hub In der Niederwiese 3, 65474 Bischofsheim, Greater Frankfurt Metropolitan Area, Germany July 2025 (Full 40 MW Operational) Fully Operational / Active Campus Deployment 40 MW Total Secured Utility Power Capacity Allocation
atNorth DEN01 Copenhagen AI Data Center Campus: 30MW Sustainable HPC Hub in Denmark Tonsbakken 12, 2740 Skovlunde / Ballerup, Greater Copenhagen, Denmark Operational Active Campus Fully Operational / Active HPC & AI Deployment 30 MW Total Secured Utility Power Capacity Allocation
EdgeConneX WAW03 Warsaw Data Center Campus: 12MW Hyperscale & Edge Hub in Poland Posag 7 Panien 1, 02-495 Warsaw, Poland Operational Active Campus Fully Operational / Active Campus Expansion 12 MW Secured Utility Power Allocation (WAW03 Facility)
Green Mountain OML1 Bergen Data Center Campus: Sustainable Hyperscale Hub in Norway Hegglandsdalen, Osterøy Municipality, Greater Bergen Area, 5282 Osterøy, Norway Active Multi-Building Campus Expansion Fully Operational / Active Phased Expansion ~93 MW Secured Utility Power Allocation
Merlin Properties Lisbon AI Data Center Campus: 180MW Sustainable AI Hub Castanheira do Ribatejo, Vila Franca de Xira, Greater Lisbon Area, Portugal Active Multi-Phase Development Under Construction / Active Phase 1 Development 180 MW Secured Utility Power Allocation (scalable to 300 MW)
EcoDataCenter Stockholm Hyperscale Campus: 80MW Sustainable AI Hub in Sweden Greater Stockholm Region, Sweden Active Multi-Building Campus Development Active Development / Phased Buildout 80 MW Secured Utility Power Allocation
Yondr Group LON2 Slough Data Center: 30MW Hyperscale & AI Hub Slough Trading Estate Area, Slough, Berkshire, SL1 4DX, United Kingdom Active Multi-Phase Development Under Development / Active Phased Construction 30 MW Secured Utility Power Allocation
maincubes FRA04 Frankfurt Data Center Campus: 40MW Sustainable AI Hub Gulf Data Hub within the KAUST Research and Technology Park 23955 Thuwal Saudi Arabia Active Multi-Phase Development Under Development / Active Phased Planning 40 MW Critical IT Load (60 MW Secured Utility Power Allocation)
Start Campus SINES DC Portugal: 1.2GW Sustainable AI Data Center Zona C1.1, ZILS (Industrial and Logistics Zone of Sines), 7520 Sines, Portugal Active Multi-Phase Development through 2030 (1.2 GW total campus capacity) Operational (SIN01) & Active Multi-Facility Expansion (SIN02–SIN06) 1.2 GW Secured Utility Power Allocation
Equinix Warsaw Data Center Campus WA4x ul. Krakowiaków 91/101, 02-255 Warsaw, Poland (WA4x Hyperscale / Campus Node) Active Phased Development Operational & Active Multi-Building Expansion 19.2 MW Secured Utility Power Allocation
Equinix Warsaw WA1 Data Center: Premier Connectivity & Peering Hub in Poland Aleje Jerozolimskie 65/79, 00-697 Warsaw, Poland (LIM Center Skyscraper) Active Operational Facility Fully Operational Hub 3.0 MW Secured Utility Power Allocation
Equinix Warsaw WA2 Data Center: Regional Colocation & Cloud Node in Poland ul. Poleczki 23, 02-822 Warsaw, Poland Operational Active Facility Fully Operational Hub 4.0 MW Secured Utility Power Allocation
Equinix Warsaw WA3 Data Center: Sustainable Enterprise & Cloud Hub in Poland Aleje Jerozolimskie 213, 02-222 Warsaw, Poland Active Operational Facility Fully Operational Hub 4.5 MW Secured Utility Power Allocation
ITinSell Cloud La Ciotat Data Center: Tier IV Sovereign & HDS Hub in France 785 Voie Antiope, Zone d'Activités Athélia III, 13600 La Ciotat, France Operational Active Facility Fully Operational Sovereign Cloud & Colocation Hub ~3.5 MW Secured Utility Power Allocation
DATA4 Marseille Campus: 120MW Sustainable Hyperscale & AI Hub in France Former Normed Shipyards Site, Zone d'Activités, 13600 La Ciotat / Marseille Metro, France Active Multi-Phase Development through 2030+ Active Development / Under Construction 120 MW Secured Utility Power Allocation
STACK Infrastructure MIL02A Milan Data Center: 5.6MW Colocation Hub Via Marche 9, 27010 Siziano (PV), Lombardy, Italy Operational Active Building Fully Operational Hub 5.6 MW Secured Critical IT Utility Allocation
Mainova WebHouse MWH01 Frankfurt Data Center: 30MW Sustainable Campus Gwinnerstraße 7 & Mergenthaler Straße 12, 60388 Frankfurt am Main, Germany Operational / Active Expansion Phase (MWH01.2 - 2025) Operational (MWH01.1) / Active Expansion (MWH01.2) 30 MW Secured Utility Power Allocation
Kao Data Manchester Campus (KMAN-01): 40MW AI & Hyperscale Hub Kenwood Point, Kenwood Road, Reddish, Stockport, SK5 6PH, United Kingdom Active Development Campus Active Development / Under Construction 40 MW Secured Critical IT Utility Allocation
atNorth NOR01 Data Center Campus: 350MW Sustainable Mega Hub in Haugaland, Norway Haugaland Business Park, 5570 Aksdal, Tysvær Municipality, Rogaland, Norway Active Multi-Phase Mega Campus Development Active Development / Under Construction 350 MW Secured Critical IT Utility Allocation (Initial 120 MW)
Digital Realty PAR3 Data Center Paris: Carrier-Neutral Colocation Hub in Saint-Denis 7-9 avenue des Arts et Métiers, 93200 Saint-Denis, France Fully Operational Active Facility Fully Operational Carrier-Neutral Facility ~10 MW to 14 MW Secured Utility Power Allocation
Digital Realty FRA8 Data Center Frankfurt: Carrier-Neutral Hub on Weismüllerstraße Weismüllerstraße 36, 60314 Frankfurt am Main, Germany Fully Operational Active Facility Fully Operational Carrier-Neutral Facility ~8 MW to 12 MW Secured Utility Power Allocation
Hyperco Helsinki Data Center: Sustainable Hyperscale & Enterprise Hub in Finland Myllynkivenkuja 4, 01620 Vantaa, Finland Fully Operational Active Facility Fully Operational Hyperscale Facility ~20 MW to 50 MW Total Secured Utility Power Capacity
Atman Warsaw-1 (WAW-1) Data Center: Carrier-Neutral Hub in Poland Grochowska 21a 04-186 Warsaw Poland Fully Operational Active 11-Building Campus Fully Operational Hyperscale & Enterprise Campus 57.0 MW Total Allocated Utility Power Capacity
Atman Warsaw-2 (WAW-2) Data Center: Carrier-Neutral Hub in Warsaw Business District 5 Konstruktorska St, 02-673 Warsaw, Poland Fully Operational Active Facility Fully Operational Enterprise & Interconnection Facility 16.0 MW Total Utility Power Allocation
NDC-GARBE FRA02 Hanau Data Center Frankfurt: Sustainable Cloud & Hyperscale Hub Hanau Industrial Zone (Former Civil Defense Storage Site Brownfield Redevelopment), Hesse, Germany Fully Operational Active Facility Fully Operational Hyperscale Cloud Data Center ~15.0 MVA Total Utility Power Capacity Allocation
Apto DC Madrid Data Center Campus: 240MW Sustainable Hyperscale Hub in Fuenlabrada Calle Sauce 20, Fuenlabrada, 28942 Madrid (~14 km from Madrid City Centre), Spain Active Multi-Building Campus Development (5 Buildings Total) Under Development / Active Construction Phase 240.0 MW Total Campus Utility Power Capacity Allocation
Digital Realty Marseille MRS4 Data Center: 13MW Mediterranean Interconnection Hub ancienne base sous-marine, Enceinte Portuaire, Porte 4, 13015 Marseille, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Hub 13.0 MW Total Utility Critical IT Power Allocation
Pulsant Manchester NW-1 Data Center: Regional Edge Colocation Hub UK 1-2 Ball Green, Cobra Court, Trafford Park, Stretford, Manchester M32 0QT, United Kingdom Fully Operational Active Facility Fully Operational Regional Edge Data Center ~1.6 MW Total Facility Primary Power Connection
Conapto Stockholm 1 City Data Center Sweden: 1MW Central Colocation & Recovery Hub Sandhamnsgatan 63B, 115 28 Stockholm, Sweden Fully Operational Active Facility Fully Operational Enterprise & Colocation Facility 1.0 MW Total Utility Critical Power Allocation
Digital Realty CPH3 Data Center Copenhagen: 14MW Hyperscale & Interconnection Hub Industriparken 24, DK-2750 Ballerup, Copenhagen, Denmark Fully Operational Active Facility Fully Operational Hyperscale & Enterprise Facility ~16.0+ MVA Total Utility Grid Supply Allocation
Digital Realty Marseille MRS1 Data Center: 10MW Mediterranean Subsea Interconnection Hub 40 Avenue Roger Salengro, 13003 Marseille, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Interconnection Hub 10.0 MW Total Utility Power Grid Connection Allocation
Digital Realty Marseille MRS6 Data Center: 50MW Sovereign Cloud & AI Hub Avenue Ferdinand de Lesseps, 13320 Bouc-Bel-Air (Marseille Metro Area), France Active Multi-Hall Warehouse Conversion & Campus Development Under Development / Planned Greenfield Conversion ~60.0+ MVA Total Utility Grid Connection Allocation
Digital Realty Paris PAR8 Data Center: 19MW Hyperscale & Enterprise Hub France 2 Avenue Marcel Cachin, 93120 La Courneuve, Paris, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Facility Dual independent high-voltage utility grid feeds, static N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt N+1 standby emergency diesel generator arrays with on-site fuel reserve autonomy.
Vantage CWL21 Cardiff Data Center: 28MW Sustainable Hyperscale Hub UK Imperial Park, Celtic Way, Marshfield, Newport / Cardiff CF3 0XW, United Kingdom Active Greenfield Campus Development Active Development / Phased Delivery ~35.0 MVA Primary Grid Utility Connection Allocation
Vantage CWL44 Bridgend Data Center: 20MW Hyperscale & AI Campus South Wales UK Bridgend Industrial Estate / Waterton Industrial Estate, Bridgend CF31 3WT, South Wales, United Kingdom Active Greenfield Campus Development Active Development / Planned Greenfield Campus ~25.0 MVA Primary Grid Utility Connection Allocation
Verne Helsinki Vantaa Data Center: 10MW Sustainable AI & Cloud Hub Finland Verne Mittalinja 1 01260 Vantaa Finland Fully Operational Active Campus Fully Operational Enterprise, Cloud & AI Campus ~12.0 MVA Total Utility Grid Connection Allocation
VIRTUS Cardiff Data Center Campus: Hyperscale & AI Expansion Hub Wales UK Cardiff Metropolitan Corridor, South Wales, United Kingdom Active Regional Campus Pipeline Active Development / Master-Planned Regional Expansion Scalable Primary High-Voltage Utility Substation Supply Allocation
Serverfarm Amsterdam AMS1 Data Center: 18MW AI-Ready Colocation Hub Netherlands Keienbergweg 22, 1101 GB Amsterdam / Archangelkade 1, 1013 BE Amsterdam, Netherlands Fully Operational Active Facility Fully Operational Enterprise, Cloud & AI Colocation Hub 30.0 MVA Total Primary Utility Grid Supply Allocation
Serverfarm London LON1 Data Center: 11.4MW AI-Ready Colocation Hub Feltham UK Unit 4, Westgate Estate, Staines Road, Feltham TW14 8RS, London, United Kingdom Fully Operational Active Facility Fully Operational Enterprise, Cloud & AI Colocation Hub ~15.0 MVA Total Primary Grid Utility Connection Power Allocation
SoftBank Group Bosquel AI Data Center: 1GW Sovereign Hyperscale Campus Hauts-de-France Bosquel, Communauté de Communes Somme Sud-Ouest, Hauts-de-France, France Target 2031 (Complete 1 GW Master-Planned AI Factory Delivery) Announced / Pre-Development & Site Planning ~1.2 GVA Dedicated High-Voltage Substation Grid Capacity Allocation
SoftBank Group Bouchain AI Data Center: 400MW Repurposed Industrial AI Factory Hauts-de-France Former EDF Thermal Power Plant Industrial Brownfield Site, Bouchain, Nord, Hauts-de-France, France Target 2031 (Complete 400 MW Industrial Conversion) Announced / Preferred Bidder Selected & Active Due Diligence Phase ~500.0 MVA High-Voltage Grid Substation Capacity Allocation
Microsoft Zaragoza Data Center Campus: €6.7B Hyperscale Cloud Hub Aragon Spain Rda. Externa Anillar (Z-40) 50007 Zaragoza Spain Long-Term Phased Campus Expansion (2026–2034) Permitted / Under Construction & Site Preparation ~350 MVA Grid Capacity Allocation across Planned Substation Additions
LEV002 Data Center (AtlasEdge Leverkusen LEV002) Dornierstraße 10, 51381 Leverkusen-Quettingen, North Rhine-Westphalia, Germany Integrated Operations across Leverkusen Campus (LEV001 + LEV002 = ~14.4 MW total capacity) Under Construction / Active Development ~6.0 MVA Dedicated Utility Grid Substation Allocation
Maincubes BER01 Berlin Data Center: Go West Campus Colocation Specs Mecklenburgische Straße 32 (Go West Campus), 14197 Berlin, Germany Active Commercial Colocation Center Operational ~11.0 MVA Dedicated Utility Grid Substation Allocation
TikTok Kouvola Data Center: €1B Project Clover Hyperscale Facility Finland Kouvola, Kymenlaakso, Southern Finland Multi-Phase Phased Delivery (Complemented by Lahti Data Center Expansion) Under Construction / Commissioning Phase ~60+ MVA Dedicated Substation Grid Service Allocation
CloudHQ Lisses CDG Data Center Campus Paris France Specs Rue Léonard de Vinci, 91090 Lisses, Île-de-France, France Multi-Phase 148.8 MW Master Campus Rollout (CDG1 & CDG2) Operational / Multi-Phase Expansion ~180+ MVA Dedicated Substation Grid Service Allocation
Icade Rungis Data Center Paris: Hyperscale Tech Park Development France 70 Rue des Solets, Parc d'affaires Paris Orly-Rungis, 94150 Rungis, Île-de-France, France Multi-Phase Hyperscale Campus Rollout Planned / Under Development ~45+ MVA Dedicated Utility Grid Substation Allocation
Campus AI Paris France: €8.5B MGX Bpifrance Mistral AI Megacampus Specs Route Départementale 57 (D57), 77390 Fouju, Seine-et-Marne, Île-de-France, France Multi-Phase Gigawatt Campus Rollout across Fouju and secondary expansion sites Under Development / Early Site Preparation ~1.6+ GVA Dedicated Substation Grid Service Allocation (Fouju Campus)
Colt Berlin Data Center Campus: Enterprise Colocation Germany Specs Uhlandstraße 181, 10623 Berlin / Kitzingstraße 15-18, 12277 Berlin, Germany Active Commercial Colocation & Network Hub Operational / Phased Expansion ~5.28 MVA Utility Grid Allocation
Colt Frankfurt 3 Hyperscale Data Centre: Germany Expansion Specs Wilhelm-Fay-Straße, 65936 Frankfurt am Main (Sossenheim), Germany Active Multi-Phase Hyperscale Deployment Under Construction / Phased Delivery ~40 MVA Total Utility Grid Provision / 32.4 MW Critical IT Capacity
Arcem Joroinen Data Center Campus: Powered Land Development Finland Specs Vättiläntie 1227, Huutokoski Industrial Area, 79620 Joroinen, Finland Multi-Phase Master-Planned Campus Development Planned / Site Origination & Permitting Phase ~30+ MVA Initial Substation Grid Access (Scalable to match site footprint)
DataVita dv2 Data Centre Chapelhall: York Road Edge Hub Scotland Specs Unit 1, York Road, Chapelhall Industrial Estate, Chapelhall, Airdrie, ML6 8NW, Scotland, United Kingdom Active Commercial Operations & Corporate HQ Operational ~3.5 MVA Utility Substation Allocation
IFB Altens Data Centre Aberdeen: Scotland Managed Hosting Specs 54 Hareness Road, Altens Industrial Estate, Aberdeen, AB12 3LE, Scotland, United Kingdom Active Commercial Colocation & Managed Cloud Hub Operational ~1 MVA Utility Substation Connection
IFB Union Street Data Centre Aberdeen: Central Scotland Colocation Specs 387 Union Street, Aberdeen, AB11 6BX, Scotland, United Kingdom Active Commercial Colocation & Network Facility Operational ~0.8 MVA Utility Grid Provision
Brightsolid Aberdeen Data Centre: Whitemyres Ave Tier III Specs Whitemyres Avenue / Lang Stracht, Mastrick, Aberdeen, AB16 6HQ, Scotland, United Kingdom Active Commercial Operations & Colocation Hub Operational ~2.5 MVA Utility Grid Allocation / 2.0 MVA Backup Generation
Blackdog Data Center Campus Aberdeen: Multi-Gigawatt AI Hub Scotland Specs A92 & Aberdeen Western Peripheral Route (AWPR / A90 Junction), AB23 8AR Blackdog, Aberdeenshire, Scotland, United Kingdom Multi-Phase Gigawatt Master Campus Rollout Proposed / Planning Permission in Principle (Masterplan Entitlements) 600 MW Initial Substation/Power Allocation (Scalable to Multi-GW)
iomart Glasgow Data Centre DC1: Middlesex Street Colocation Specs 88 Middlesex Street, Kinning Park, Glasgow, G41 1EE, Scotland, United Kingdom Operational Colocation & Managed Services Hub Operational 1.0 MVA Total Grid Provisioning
Schuberg Philis Boeing Avenue Data Center: Schiphol-Rijk Specs Boeing Avenue 271, 1119 PD Schiphol-Rijk, Haarlemmermeer, The Netherlands Active Commercial Operations & Sovereign Cloud Center Operational ~4.5 MVA Utility Grid Provision
Digital Realty AMS10 Pudongweg Data Center: Schiphol Colocation Specs Pudongweg 25, 1437 EM Aalsmeerderbrug (Schiphol-Rijk area), The Netherlands Active Commercial Colocation & Interconnection Hub Operational ~31.2 MW Total Utility Power Provision
Digital Realty AMS8 Pudongweg Data Center: Schiphol Colocation Specs Pudongweg 37, 1437 EM Rozenburg, North Holland, The Netherlands Active Commercial Operations & Cloud Campus Facility Operational ~20 MVA Total Utility Substation Capacity
nLighten Amsterdam AMS II Data Center: Schiphol-Rijk Specs Koolhovenlaan 120, 1119 NR Schiphol-Rijk, Haarlemmermeer, The Netherlands Active Commercial Edge Colocation Operations Operational ~5.0 MVA Total Utility Substation Capacity Allocation
EdgeConneX Amsterdam EDCAMS05: Schiphol-Rijk Hyperscale Specs Boeing Avenue 201-203, 1119 PD Schiphol-Rijk, Haarlemmermeer, The Netherlands Active Commercial Operations & Cloud Edge Hub Operational ~25 MVA Dedicated Utility Substation Allocation
DayOne Aragon AI Data Center Campus: Technical Specs & Infrastructure Ctra. de Quinto de Ebro a Gandesa (A-221), 50790 Escatrón, Zaragoza, Spain Operational in phased 50 MW–100 MW high-density modules Announced / Under Development ~300 MW High-Voltage Grid Substation & Direct Generation Capacity
Campus Data Navarra: Grupo VDR Data Center Specs Polígono de servicios de Gazólaz (Calle A & Calle C), 31190 Gazólaz, Navarra, Spain 2029 (Buildings 2–4 with 100 MW capacity each) Announced / Pre-Construction & Urbanization Phase ~350 MVA Total Substation Grid Capacity
Tillion Aragon Data Center Campus: Technical Specs ~80-Hectare Master Site, Carretera A-129, 50162 Villamayor de Gállego, Zaragoza, Spain 2032–2034 (Multi-Phase Rollout to 300 MW Total Scale over 7–8 Years) Announced / Pre-Construction Phase (DIGA Approved) ~350 MVA Total Utility Substation Capacity (150 MW Initial Secured Grid Concession, Expandable to 300 MW)
Apto Lacchiarella Data Center Campus: Technical Specs Via SP105 / SP40 Junction Area, 20084 Lacchiarella, Metropolitan City of Milan, Italy 2029–2030 (Multi-Phase Rollout Across All 3 Buildings) Announced / Pre-Construction & Permitting Phase ~220 MVA Dedicated Substation Grid Connection
Adriatic DC Bari Data Center: Technical Specs Via Francesco de Blasi, Ex-Manifattura Tabacchi Industrial Zone, 70123 Bari, Puglia, Italy 2030 (Multi-Phase Campus Deployment) Announced / Permitting & Site Regeneration Phase ~250 MVA Dedicated Utility Substation Capacity
EDF OpCore Montereau AI Data Center France Hyperscale Campus Former Montereau Thermal Power Station Site, Montereau-Fault-Yonne, 77130, France Q4 2029 Under Construction / Master Development 200 MW Gross Utility Power Capacity (Campus Limit)
Polarise Amberg AI Data Center Bavaria Germany Amberg Industrial Park, 92224 Amberg, Bavaria, Germany Q2 2028 Under Construction 100 MW Gross Utility Power Capacity
Prime Esbjerg ESB01 Data Center Nordre Tovrupvej Denmark Prime Data Centers Nordre Tovrupvej, 6705 Esbjerg, Denmark Q4 2033 (Full 550MW Campus Buildout) Under Development / Planned 650 MW Gross Utility Power Capacity
Île-de-France AI Infrastructure Campus Ardian Verne Paris France Greater Paris Metropolitan Area, Île-de-France, France Q4 2029 (Full 120MW IT Buildout) Under Development / Planned 150 MW Gross Utility Power Capacity
Goodman AMS01 Data Centre (Amsterdam) Hybrideweg 101, 2141 DM Vijfhuizen, Netherlands Expected 2027–2028 Planning & Power Secured / Under Development 76.0 MW Secured Power Capacity / 48.0 MW Total IT Load Campus Capacity
Goodman PAR01A Data Centre 13 Rue Charles Cros Tremblay en France Paris Goodman Group 13 Rue Charles Cros, 93290 Tremblay-en-France, France Q4 2028 Under Development / Planning Phase 48.0 MW Gross Utility Power Allocation / 32.0 MW Total IT Load
Goodman PAR01 Data Centre Campus 13 Rue Charles Cros, 93290 Tremblay-en-France / Paris, France Q4 2029 Under Development / Planning Phase 96.0 MW Gross Utility Power Allocation / 64.0 MW Total Campus Critical IT Load
Goodman PAR02 Data Centre Campus 34 Rue Louis Armand, 94190 Villeneuve-Saint-Georges, France Q4 2030 Under Development / Planning Phase 108.0 MW Gross Utility Power Allocation / 72.0 MW Total Campus Critical IT Load
Nscale Oslo AI Data Center Campus Norway Renewable Hydro Compute Hub Hønefoss, Buskerud, Norway Q4 2026 Operational & High-Density AI Expansion Phase 25.0 MW Gross Power Allocation / 20.0 MW Critical IT Load
atNorth ICE02 Keflavik Mega Data Center Sjónarhóll Reykjanesbær Iceland Sjónarhóll 6, 235 Reykjanesbær (Keflavik), Iceland Operational / Multi-Phase High-Density Expansion Operational & High-Density Expansion Phase 80.0 MW Gross Power Allocation / 64.0 MW Critical IT Load
Microsoft Bornasco Data Center Campus Via dei Pioppi & Via Olivetti (ex Via Rimembranze), 27010 Bornasco (PV), Italy Early 2029 Under Construction Phase (Groundbreaking Q1 2026) 65.0 MW Gross Power Allocation / 50.0 MW Critical IT Power Load
Microsoft Cologne INKA Data Center Campus Bergheim terra nova Industrial Park Germany Industrial Park INKA:terra nova, 50126 Bergheim, North Rhine-Westphalia, Germany Q4 2029 Under Construction Phase (Groundbreaking Q1 2026) 115.0 MW Gross Power Allocation / 90.0 MW Critical IT Power Load
Vantage FRA2 Frankfurt II Data Center Campus – 56 MW IT Load Alexander-von-Humboldt-Strasse 4, 65479 Raunheim, Germany 2025 (56 MW total across 2 buildings) Phase 1 Operational / Phase 2 Expansion 56 MW critical IT load allocation
Northern Data European AI Mega Campus Frankfurt – 60 MW HPC Main-Biopark Industrial Zone, Frankfurt Metropolitan Area, Germany Q2 2026 (Full 60 MW IT load operational) Fully Operational / Phased Expansion 75 MW grid supply allocation
CyrusOne FRA4 Frankfurt Data Center Sossenheim – 11 MW Wilhelm-Fay-Straße 58, 65936 Frankfurt am Main, Germany Q4 2021 (Full 11 MW critical load operational across 4 floors) Fully Operational 15 MW utility grid supply
Vantage FRA13 Offenbach Frankfurt Data Center – Hyperscale Campus Goethering 27, 63067 Offenbach am Main, Hesse, Germany Q4 2024 / Q1 2025 Fully Operational / Active Phase 70 MVA Gross Grid Allocation (56 MW IT Load)
STACK Infrastructure STO01 Stockholm Sovereign Data Center – 30 MW Smedbyvägen 6, 194 30 Upplands Väsby, Stockholm, Sweden 2024 / 2025 (Complete 30 MW active across STO01A and STO01B) Fully Operational (STO01A) / Expansion Active (STO01B) 35+ MVA dedicated grid transformation capacity
GLi Charlton Gateway London Data Center – 180MW Greenwich Hub 669A Woolwich Road, Charlton, London SE7 8SL, United Kingdom Scheduled across 70,324 sq m master plan Proposed / Planning Scoping & EIA Phase 182.0 MVA Dedicated Utility Grid Feed
Templus Lisbon LIS01 1.5MW Carrier-Neutral Data Center Edifício Diogo Cão, Doca de Alcântara Norte, 1350-352 Lisbon, Portugal 500 m² whitespace hosting 150 server racks with full cage, suite, and rack colocation options Operational / Regional Edge Interconnection Node Substation Power Infrastructure Allocation
MEO LDV Linda-a-Velha Lisbon Interconnection Data Center R. Marconi SN, 2795-242 Linda-a-Velha, Lisbon, Portugal 3,000 m² building housing multi-carrier meet-me rooms, high-density server racks, and subsea cable interconnects Operational / Strategic International IX Hub Substation Utility Grid Allocation
AtlasEdge Lisbon Campus Carnaxide 30MW Data Center Estrada Outurela 117a, 2790-072 Carnaxide, Lisbon, Portugal Multi-building edge campus offering up to 30 MW IT capacity optimized for high-density AI/HPC racks Operational & Active Multi-Phase Expansion Substation Power Infrastructure Allocation
NOS Imopolis II Carnaxide Lisbon 2MW Data Center Parque Holanda, Estrada Outurela 118, 2790-114 Carnaxide, Portugal Modular white space hosting customizable racks, private suites, and cloud analytics platforms Operational / Enterprise Cloud & Managed IT Facility Dedicated Utility Grid Connection Allocation
NOS Imopolis I Carnaxide Lisbon 1.26MW Data Center Estrada Outurela 118, 2790-114 Carnaxide, Portugal 1,777 m² computer room area hosting enterprise white space, private cabinets, and managed server racks Operational / Strategic Enterprise & Colocation Node Substation Power Infrastructure Allocation
MEO Picoas Lisbon Carrier-Neutral Colocation Data Center Av. Fontes Pereira de Melo 38C, 1069-300 Picoas, Lisbon, Portugal Urban technical facility hosting high-density telecom routing switches, carrier meet-me rooms, and colocation suites Operational / Strategic Metro Telecom & Interconnection Node Substation Grid Capacity Allocation
Oni Datacenter Lisbon Matinha 1MW Colocation Facility Rua 3 da Matinha A, Edifício Altejo, 1950-326 Lisbon, Portugal 2,000 m² total whitespace hosting 500+ racks, private cages, virtual cloud nodes, and telco footprints Operational / Strategic Enterprise & Carrier Node Substation Power Infrastructure Allocation
WebTuga LS2 Lisbon Edifício Altejo Colocation Data Center Rua nº3 da Matinha - Edifício Altejo, 1950-326 Lisbon, Portugal Technical whitespace hosting high-density rack units, private cages, virtualized cloud racks, and telco PoPs Operational / Strategic Regional Edge & Hosting Node Substation Utility Grid Capacity Allocation
FCCN SE03 GigaPix II Lisbon Academic Internet Exchange Data Center Piso 1, Edifício Manuel Rocha, Avenida do Brasil 101, 1700-066 Lisbon, Portugal Specialized technical whitespace hosting GigaPIX core switches, RCTS optical routers, and peering racks Operational / Strategic National Academic & Internet Exchange Hub Dedicated Utility Grid Connection Allocation
MEO Carnide Lisbon Enterprise Colocation Data Center R. Maria Veleda 1, 1500-024 Carnide, Lisbon, Portugal 300 m² technical whitespace hosting customizable enterprise racks, server footprints, and cloud nodes Operational / Enterprise Edge & Hosting Hub Substation Grid Capacity Allocation
Claranet Lisboa Prior Velho Enterprise Colocation Data Center Av. Severiano Falcao, 16, 1998-014 Lisbon, Portugal Technical white space hosting enterprise racks, hybrid cloud platforms, and managed security suites Operational / Strategic Enterprise Cloud & Colocation Hub Substation Utility Grid Capacity Allocation
Equinix LS1 Lisbon IBX Colocation Data Center Av. Severiano Falcão 14, 2685-378 Prior Velho, Lisbon, Portugal 1,487 m² technical colocation white space supporting 4.0 kW to 6.0 kW+ density per rack, private cages, and cloud suites Operational / Flagship International Interconnection Hub Substation Utility Grid Allocation
Equinix LS2 Lisbon IBX 2MW+ Carrier-Neutral Data Center Avenida Severiano Falcão 12–14, 2685-378 Prior Velho, Lisbon, Portugal 2,050 m² colocation white space optimized for AI/HPC high-density cabinets, private cages, and cloud suites Operational / Strategic IBX Campus Expansion Node Substation Utility Grid Capacity Allocation
Edged Lisbon Campus Castanheira do Ribatejo 100MW Data Center Azinhaga da Fruteira 2600, 2600-638 Castanheira do Ribatejo, Portugal 100 MW multi-building hyperscale campus with high-density AI liquid-cooled racks and solar integration Active Development / Phased Buildout Substation Power Infrastructure Allocation
EDC One Pego Abrantes 100MW Hyperscale Data Center Estrada Nacional 118 (EN118), 2205-305 Pego, Abrantes, Portugal Multi-building campus featuring high-density AI rack configurations, battery storage (BESS), and liquid cooling Under Development / Strategic Greenfield Campus Dedicated Substation Utility Grid Capacity Allocation
Ar Telecom Porto Largo da Estacao Data Center Largo da Estação, 4350 Porto, Portugal Operational colocation facility catering to northern regional cloud, edge, and telecommunication workloads Operational MV Grid Connection
NFSI Porto 1 Colocation & Telecom Data Center R. Dr. Alfredo Magalhães, 46, 4000-061 Porto, Portugal Technical whitespace supporting full/partial racks, private suites, cages, and high-speed network PoPs Operational Substation Utility Grid Capacity Allocation
NOS Data Center NS Matosinhos Porto Enterprise Colocation R. Henrique Pousao, n.o 432, 4461-901 Senhora da Hora - Matosinhos, Portugal 1,800 m² technical white space hosting standard/high-density enterprise racks, private cages, and telco PoPs Operational / Primary Northern Enterprise Hub Dedicated Utility Grid Connection Allocation
MEO Tenente Valadim Porto Enterprise Colocation Data Center R. de João de Deus 636, 4100-366 Porto, Portugal Urban technical facility hosting telecom switches, enterprise colocation racks, and carrier meet-me rooms Operational / Primary Northern Telecom & Interconnection Node Substation Grid Capacity Allocation
REGISTER Porto Enterprise Cloud & Colocation Data Center Rua Dr Dinis Jacinto, 4350-059 Porto, Portugal Technical whitespace hosting enterprise server racks, cloud platforms, and web hosting infrastructure Operational / Regional Cloud & Managed IT Hub Substation Utility Grid Capacity Allocation
MEO Covilhã Data Center Flagship Cloud & Colocation Hub Portugal Transversal Rua da Grila 4, 6200-000 Covilhã, Portugal 4-block modular campus with 24 server halls housing over 50,000 physical server footprints Operational / Flagship National Infrastructure Hub Substation Power Infrastructure Allocation
FCCN SE02 GigaPix Porto Internet Exchange Data Center FEUP, Sala 102, Edifício CICA, Rua Dr. Roberto Frias, 4200-465 Porto, Portugal Technical switching room hosting national internet exchange switches, research compute racks, and carrier PoPs Operational / Primary Northern IXP & Academic Switching Node University Grid Connection Allocation
IP Telecom Lisbon Prior Velho Enterprise Colocation Data Center Prior Velho, 2685 Loures, Greater Lisbon, Portugal Technical whitespace hosting enterprise server cabinets, cloud infrastructure, and railway fiber PoPs Operational / Primary Capital Metropolitan Hub Substation Utility Grid Capacity Allocation
Colt Lisbon Carnaxide Carrier-Neutral Data Center Estrada da Outurela 118, 2790-113 Carnaxide, Greater Lisbon, Portugal Carrier-neutral whitespace hosting enterprise server racks, managed network nodes, and carrier PoPs Operational / Strategic Network Interconnect Node Substation Utility Grid Capacity Allocation
EXA Infrastructure Lisbon Cable Landing Station & Subsea Hub Greater Lisbon Digital Corridor, Portugal Cable landing station whitespace housing subsea SLTE/PFE equipment, optical amplifiers, and carrier PoPs Operational / Strategic Subsea Gateway Utility Grid Connection Capacity Allocation
Vodafone Portugal Lisbon Headquarters Central Office & Data Center Avenida D. João II 36, Parque das Nações, 1998-017 Lisbon, Portugal Urban technical complex hosting 5G core switching, enterprise cloud suites, and network operations rooms Operational / Primary Capital Telecom Core Node Substation Utility Grid Capacity Allocation
REN Ermesinde Data Center RENTELECOM Porto Carrier-Neutral Colocation Rua das Agras Novas 46, 4445-283 Ermesinde, Portugal Operational Phase Operational / Primary Northern Telecommunications Node Substation Power Infrastructure Allocation
REN Sacavém Data Center RENTELECOM Lisbon Carrier-Neutral Colocation Sacavém, 2685 Loures, Greater Lisbon, Portugal Technical whitespace supporting full/partial cabinets, private cages, and carrier PoPs Operational / Primary Capital Telecommunications Hub Substation Power Infrastructure Allocation
Retelit Corsico Milan Carrier-Neutral Colocation Data Center Via Antonio Canova 7/9, 20094 Corsico (MI), Italy Technical whitespace hosting enterprise server racks, cloud infrastructure, and national carrier PoPs Operational / Primary Strategic Telecom & Cloud Node Substation Utility Grid Capacity Allocation
Vodafone Milan Via Kuliscioff Central Office & Network Data Center Via Anna Kuliscioff 32/38, 20152 Milan, Italy Metropolitan technical exchange hosting 5G core switching, enterprise cloud suites, and network rooms Operational / Primary Capital Metropolitan Core Hub Substation Utility Grid Capacity Allocation
Keppel Milan Data Centre Via Bisceglie Enterprise Colocation Via Bisceglie 71, 73 & 75, 20152 Milan, Italy Multi-tenant whitespace hosting enterprise server cabinets, cloud infrastructure, and telecommunication PoPs Operational / Flagship Italian Colocation Asset Substation Utility Grid Capacity Allocation
Equinix ML2 Milan Via Savona International Business Exchange Data Center Via Savona 125, 20144 Milan, Italy Multi-tenant IBX whitespace hosting enterprise server cabinets, cloud nodes, and network PoPs Operational / Strategic European Interconnection Node Substation Utility Grid Capacity Allocation
Retelit Settimo Milanese Via Darwin Enterprise Colocation Data Center Via Carlo Roberto Darwin 85, 20019 Settimo Milanese (MI), Italy Technical whitespace hosting enterprise server cabinets, cloud nodes, and network PoPs Operational / Strategic Milan Metro Node Substation Utility Grid Capacity Allocation
DATA4 Milan Campus MIL01 Cornaredo 170MW Hyperscale Data Center Via Monzoro 101-105, 20007 Cornaredo (MI), Italy 20-hectare campus hosting up to 12+ standalone data center modules for cloud & enterprise tenants Operational / Strategic Multi-Building Hyperscale Campus Substation High-Voltage Infrastructure Capacity Allocation
Vantage MXP2 Milan II Castelletto 32MW Hyperscale Data Center Campus Via Aganippo Brocchi, 20019 Castelletto (MI), Italy 2-building campus hosting dedicated enterprise halls, cloud availability pods, and high-density AI suites Under Construction / Multi-Phase Buildout Substation High-Voltage Infrastructure Capacity Allocation
DATA4 Milan Campus MIL02 Vittuone 100MW Hyperscale Data Center Via Giovanni Pascoli, 20009 Vittuone (MI), Italy 22-hectare campus hosting up to 6+ standalone data center modules for hyperscale & AI tenants Under Construction / Multi-Phase Hyperscale Development Substation High-Voltage Infrastructure Capacity Allocation
Hscale MXP1 Arluno Milan Hyperscale Data Center Via Padre Massimiliano Kolbe, 20004 Arluno (MI), Italy Technical whitespace hosting hyperscale cloud suites, AI pods, and carrier PoPs Operational / Strategic Western Milan Hyperscale Hub Substation High-Voltage Infrastructure Capacity Allocation
DAMAC Digital MIL01 Pregnana Milanese 15MW Hyperscale Data Center Viale dell'Industria 15-3, 20006 Pregnana Milanese (MI), Italy Purpose-built campus hosting dedicated hyperscale suites, cloud availability zones, and AI clusters Under Construction / Multi-Phase Buildout Substation High-Voltage Infrastructure Capacity Allocation
VIRTUS MILAN1 Cornaredo 30MW Hyperscale Data Center Campus Via Brennero, 20007 Cornaredo (MI), Italy 15-hectare campus hosting high-density AI suites, private enterprise halls, and cloud availability pods Under Construction / Strategic Italian Flagship Hub Substation High-Voltage Infrastructure Capacity Allocation
Fastweb Milan Via Caracciolo Central Office & Cloud Data Center Via Francesco Caracciolo 51, 20155 Milan, Italy Metropolitan technical exchange hosting 5G core switching, enterprise cloud suites, and network rooms Operational / Primary Capital Metropolitan Core Hub Substation Utility Grid Capacity Allocation
TIM Telecom Italia Rozzano Flagship Cloud & Colocation Data Center Via Achille Grandi, 20089 Rozzano (MI), Italy Strategic national campus hosting Google Cloud Region, sovereign government data, and enterprise halls Via Achille Grandi, 20089 Rozzano (MI), Italy Substation High-Voltage Infrastructure Capacity Allocation
Equinix ML5 Milan Rozzano 18MW Hyperscale IBX Data Center Via Gian Battista Vico 1, 20089 Rozzano (MI), Italy Strategic IBX campus hosting enterprise server cabinets, hyperscale cloud suites, and network PoPs Operational / Flagship Italian Interconnection Hub Substation High-Voltage Infrastructure Capacity Allocation
Vantage MXP1 Milan Linate 64MW Hyperscale Data Center Campus Via per Carpiano, 32, 20077 Melegnano MI, Italy 30-acre campus hosting up to 3 standalone data center buildings for hyperscale & AI workloads Operational / Flagship Italian Hyperscale Campus Substation High-Voltage Infrastructure Capacity Allocation
Equinix ML3 Milan Basiglio Carrier Neutral IBX Data Center Via Francesco Sforza 13, 20080 Basiglio (MI), Italy Multi-tenant IBX whitespace hosting enterprise server cabinets, cloud nodes, and network PoPs Operational / Strategic Interconnection Node Substation Utility Grid Capacity Allocation
Retelit Bologna Castenaso Enterprise Colocation Data Center Via Cà dell'Orbo Nord 35, 40055 Castenaso (BO), Italy Regional technical facility hosting enterprise cabinets, edge cloud nodes, and carrier PoPs Operational / Strategic Regional Hub Substation Utility Grid Capacity Allocation
Galicia Green Data Center Curtis Teixeiro 15MW Green AI Facility Polígono Industrial Teixeiro, 15310 Curtis–Teixeiro, A Coruña, Galicia, Spain Northwest Spain's landmark green digital hub hosting enterprise suites and cloud workloads Approved Strategic Project / Active Pre-Construction Phase Substation High-Voltage Infrastructure Capacity Allocation
EDGNEX MAD01 Vicálvaro Madrid 40MW Hyperscale Data Center Calle Vigil, 11, Vicálvaro, 28052 Madrid, Spain Strategic Southern European cloud hub hosting enterprise suites, hyperscale clouds, and AI nodes Under Construction / Active Development Phase Substation High-Voltage Infrastructure Capacity Allocation
Portus IPHH4 Hamburg Wendenstraße 12.8MW Hyperscale Data Center Germany Wendenstraße 412, 20537 Hamburg, Germany Multi-building 12.8 MW interconnected campus node in Hamburg Under Construction / Active Development 20.3 MVA Grid Connection Capacity
Iridium Carretera Nacional Alcalá de Henares 50MW Hyperscale Data Center Madrid Spain Carretera Nacional II, Alcalá de Henares, 28805 Madrid, Spain Strategic Eastern Madrid availability zone & high-density AI supercomputing node Active Development / Construction Phase Substation High-Voltage Infrastructure Capacity Allocation
Form8tion Madrid One Fuenlabrada 160MW Hyperscale Data Center Campus Madrid Spain Calle Sauce 20, 28942 Fuenlabrada, Madrid, Spain 5-building 160MW flagship hyperscale and AI supercomputing hub in Madrid Under Construction / Active Campus Phase Development Dedicated Substation High-Voltage Infrastructure Allocation
Thames Valley Park Data Centre Reading RG6 1WG 72MW Hyperscale Data Center Berkshire UK Thames Valley Park, Reading, Berkshire RG6 1WG, UK 72MW flagship tech-corridor hyperscale and AI computing facility in Reading Proposed / Public Consultation Phase 72.0 MW Dedicated IT Load Supply
DE Devon Data Campus Alverdiscott 100MW Zero Carbon Hyperscale Data Centre UK Alverdiscott, Torridge District, Devon EX39, England, UK Strategic South West UK zero-carbon availability zone & AI supercomputing node Proposed / Active Planning & Land Scoping Phase Substation High-Voltage Infrastructure Capacity Allocation
Larbert Data Centre Campus Glenbervie Business Park Falkirk Scotland 300MW Glenbervie Business Park, Bellsdyke Road, Larbert, Scotland, UK 55-acre 300MW flagship Scottish Central Belt green computing campus Proposed / Full Planning Application Accepted by Falkirk Council 300 MW Confirmed Grid Agreement
Arcem Husnes Data Center Gron Naeringspark Kvinnherad Norway 90MW Grøn Næringspark, 5460 Husnes, Kvinnherad Municipality, Vestland, Norway 60,000+ sq. m. 90MW green computing and storage campus in Western Norway Proposed / Land Secured & Grid Reservation Active 90 MW Total Plan (Phase 1 Grid Reserved for 40 MW via BKK)
Arcem Bergen Data Center Langedalen Sondre Arna Norway 130MW Langedalen (Arnatippen), Søndre Arna, 5268 Haukeland, Bergen, Norway Flagship 130MW green AI and cloud computing campus in Søndre Arna, Bergen Proposed / Plan Initiative Submitted to Bergen Municipality Up to 130 MW Grid Power Application
Dataglow Energy Data Center Project London Way, Melbourn, Royston SG8 6DJ, UK Flagship UK deployment of the Energy Superloop waste-heat model Planning Permission Pending / Development Phase ~30%+ direct local solar power supply + 100% renewable grid import
Pinewood Nurseries Data Centre Wexham Street Stoke Poges SL3 6NB UK Land at Pinewood Nurseries, Wexham Street, Stoke Poges, Buckinghamshire SL3 6NB, UK Flagship Slough-fringe hyperscale & AI inference compute facility Outline Planning Submitted (Application Ref: PL/26/06414/OA) Planned grid connection + on-site energy generation centre (~5,000 sq. m)
LDC1 South Mimms Data Centre Hertfordshire Equinix DC01UK 3.9B Land East of South Mimms Services, St Albans Road, South Mimms, UK 85-acre, 2M sq. ft. flagship £3.9B cloud & AI campus in South Mimms, UK Approved Outline Planning / Pre-Construction Site Prep ~400 MW High-Voltage Grid Capacity Request
Bower Street Data Centre Manchester Latos M40 2AF AI Edge Land south of Bower Street / Ten Acres Lane, Newton Heath, Manchester M40 2AF, UK 28,000 sq. ft. flagship Neural Edge AI data centre in Newton Heath, East Manchester Proposed / Planning Application Submitted (Manchester City Council Ref: PLA-2026-001350) Estimated ~10 MW Power Interconnect Request
Hayes Bridge Retail Park Heathrow Data Centre Uxbridge Road UB4 0RH Uxbridge Road, Hayes UB4 0RH, London Borough of Hillingdon, UK 4-phase, 85,000+ sqm flagship Colt cloud & AI campus in Hayes, West London Approved Hybrid Planning (Ref: 78343/APP/2025/719) / Reserved Matters Active ~180 MW Dedicated Substation Allocation Request
Meta Data Center Campus Talavera de la Reina Toledo Spain 248MW Torrehierro Industrial Park Phase 2, Talavera de la Reina, Toledo, Spain 191-ha, 248MW flagship European Meta hyperscale AI campus in Talavera de la Reina Approved (PSI Designation) / Land Reparceling & Pre-Construction 248 MW Approved High-Voltage Transmission Interconnect
Cardiff East Data Centre Park and Ride Wales UK Curtis Hall Cardiff East Park & Ride, St Albans Road, Pentwyn / Llanrumney, Cardiff, Wales, UK ~10-ha high-density cloud & AI compute campus in Pentwyn/Llanrumney, Cardiff Proposed / Planning Hybrid Submitted (Welsh Government Holding Direction Active) ~80 MW High-Voltage Grid Capacity Allocation Request
DataVita DV4 Data Centre Chapelhall North Lanarkshire Scotland 120MW Land south of Lancaster Avenue / Bellside Road, Chapelhall, ML6 8XN, UK 9.67-ha, 120MW green AI hyperscale facility in Scotland's AI Growth Zone Proposed / Planning Permission in Principle Submitted (Ref: North Lanarkshire Council) ~150 MW High-Voltage Grid Allocation Request
Kao Data Park Royal Data Center London UK Acton Lane Former Frogmore Industrial Estate, Acton Lane, Park Royal, West London NW10, UK 4.7-acre, 107,000 sq ft sustainable AI & cloud data center in West London Proposed / Pre-Planning & Community Consultation Est. 30 MW Dedicated High-Voltage Utility Supply Allocation
Revikon Giessen Data Center Germany 65MW Katzenfeld Campus Gewerbegebiet Katzenfeld (Gießen-West Outer Ring Road), 35390 Gießen, Hesse, Germany Q4 2032 Proposed / Municipal Council Approved 65.0 MW IT Load / Dedicated High-Voltage Substation Interconnect Allocation
Greenfield Finsbury Milan Data Center Lombardy Italy 36MW AI Campus East of Milan, Metropolitan Area of Milan, Lombardy, Italy Q3 2029 Proposed / Pre-Development & Engineering Phase 80.0 MW Substation Allocation
Greenock Data Centre Spango Valley IBM Site Scotland 80000 sqm AI Campus Former IBM Site, Spango Valley, Inverkip Road, Greenock PA16 0AH, Scotland, UK Q4 2032 Proposed / Planning Permission in Principle (PPP) Application Submitted 150.0 MW Total Power Draw Allocation (Supported by 99 MW BESS)
SDC M40 Campus 300MW Data Centre Beaconsfield Buckinghamshire UK Former landfill and mineral extraction site between M40 and A40 (Oxford Road), near Beaconsfield and Gerrards Cross, Buckinghamshire, UK Q4 2032 Proposed / Nationally Significant Infrastructure Project (NSIP) DCO Consultation Stage 300.0 MW Total Campus Power Capacity
Norwich Apex Data Centre Keswick South Norfolk Ipswich Road 150MW AI Cloud Campus Land adjoining Ipswich Road and the B1113 (opposite Tesco Harford Superstore), Keswick, South Norfolk, UK Q4 2030 Proposed / Pre-Planning Consultation Stage 150.0 MW Total Campus Power Allocation
Google Kajaani AI Data Center Infrastructure Finland Kainuu Hyperscale Ryynäsentie, Kajaani, Kainuu Region, Northern Finland Q4 2031 Proposed / Land Acquired & Development Planning Phase 300.0 MW Contracted Utility Grid Capacity
Google Muhos AI Data Center Infrastructure Muhos Finland Northern Ostrobothnia Hyperscale Dedicated Data Center Site (2,100 ha combined acquisition area), Muhos, Northern Ostrobothnia, Finland Q4 2031 Under Development / Site Preparation & Pre-Construction Phase 300.0 MW Contracted Grid Capacity
Google Vaala AI Data Center Infrastructure Vaala Finland North Ostrobothnia Hyperscale Ouluntie (Highway 22), Nuojua–Järvikylä, 91700 Vaala, Finland Q4 2031 Under Development / Site Infrastructure & Pre-Construction Phase 300.0 MW Contracted Grid Capacity
Former Sipson Garden Centre Data Center Campus Sipson Road West London UB7 Heathrow Former Sipson Garden Centre site, Sipson Road (A408), Sipson, London Borough of Hillingdon, West London UB7 0HW, UK Q4 2030 Proposed / Pre-Planning Land Site Conversion Stage 40.0 MW Contracted Grid Interconnect Capacity
Schwarz Group Dummerstorf Data Center Stackit Cloud Mecklenburg Vorpommern Dummerstorf, Mecklenburg-Vorpommern 18196, Germany Q4 2031 Proposed / Land Acquisition & Planning Phase 50.0 MW Contracted Utility Power Allocation
Cato Data Centre Campus Auchtertool Fife Scotland 600MW AI Hyperscale Land north of Camilla Road, Camilla Farm, Gleniston, Auchtertool, Fife KY2 5XW, UK Q4 2032 Proposed / Planning Permission in Principle (PPP) Phase 600.0 MW Contracted Utility Interconnect
Rufus Data Centre Campus Hurlford East Ayrshire Scotland 540MW AI Hyperscale Land at Purroch Farm, Mauchline Road, Hurlford, East Ayrshire, KA1 5JJ, Scotland, UK Q4 2032 Proposed / Pre-Application Consultation (25/0008/PREAPP) 540.0 MW Contracted Grid Interconnect Capacity
Aurelius Data Centre Campus Newhouse Cleland North Lanarkshire Scotland 400MW AI Land at North Lanrigg, Carlisle Road, Cleland / Newhouse, North Lanarkshire, ML1 5LT, Scotland, UK Q4 2031 Proposed / Pre-Application Consultation & EIA Screening Stage (26/00595/EIASCR / 25/00989/PAN) 400.0 MW Contracted Grid Interconnect Capacity
Apatura Drumshangie Data Center Greengairs North Lanarkshire Scotland 500MW AI Drumshangie Moss & Former Opencast Coal Mine Site, Greengairs / Airdrie, North Lanarkshire, ML6 7TZ, Scotland, UK Q4 2032 Proposed / Pre-Planning Application Consultation Stage (26/00069/PAN) 500.0 MW Contracted Grid Interconnect Capacity
Apatura Borders Data Center Coldstream Laundry Field Scottish Borders Scotland Laundry Field, Land East of A697, Coldstream, Scottish Borders, TD12 4LZ, Scotland, UK Q4 2032 Proposed / Pre-Planning & EIA Screening Phase (25/00556/SCR) 300.0 MW Contracted Grid Interconnect Capacity
Cerebras Mikkeli Data Center Campus Mikkeli Finland Mikkeli Industrial Area / Technology Park, Mikkeli, South Savo, Finland Q4 2029 Under Construction / Phased Expansion 165.0 MW Contracted Total IT Capacity (50 MW Initial Phase)
Kao Data KLON 06 16MW Data Center Slough United Kingdom Slough Trading Estate, 672 Galvin Road, Slough, SL1 4AN, United Kingdom Q4 2023 Operational / Fully Leased Colocation & Enterprise Campus 20.0 MW Total Utility Power Interconnect
NTT GDC Slough Campus 5 MW Data Center United Kingdom Slough Trading Estate, 665 & 670 Ajax Avenue, Slough, SL1 4BG, United Kingdom Q4 2014 Operational / Colocation & Enterprise Cloud Hub 6.0 MW Total Utility Interconnect
Digital Realty LHR26 9MW Data Center Slough United Kingdom Slough Trading Estate, 630 Ajax Avenue, Slough, SL1 4DG, United Kingdom Q4 2022 Operational / Colocation & Cloud Ecosystem Campus 11.0 MW Total Utility Power Allocation
Digital Realty LHR27 4.5MW Data Center Slough United Kingdom Slough Trading Estate, 631 Ajax Avenue, Slough, SL1 4DG, United Kingdom Q4 2022 Operational / Enterprise & Cloud Colocation Facility 6.0 MW Total Utility Power Allocation
GTR London GB One Campus 40.5MW Data Center Slough Slough Trading Estate, 654-662 Ajax Avenue, Slough, SL1 4BG, United Kingdom Q4 2026 Active Development / Phased Delivery 50.0 MW Dedicated Substation Allocation
CyrusOne Slough Campus 36MW Data Center United Kingdom 225B & 225C Bath Road, Slough, SL1 5PP, United Kingdom Q4 2023 Operational / Hyperscale & Enterprise Colocation Campus 54.0 MW Dedicated Utility Power Allocation
China Mobile International London 10MW Data Center Slough Slough Trading Estate, 536 Ipswich Road, Slough, SL1 4EP, United Kingdom Q4 2020 Operational / Colocation & International Telecom Hub 15.0 MVA Utility Substation Allocation
Iron Mountain LON-3 25MW Data Center Slough Slough Trading Estate, 111 Buckingham Avenue, Slough, SL1 4PF, United Kingdom Q4 2027 Active Development / Phased Delivery 30.0 MW Total Utility Power Allocation
Rackspace London 3 10MW Data Center Slough Slough Trading Estate, 115 Buckingham Avenue, Slough, SL1 4PF, United Kingdom Q4 2013 Operational / Colocation & Managed Cloud Hub 12.0 MW Dedicated Utility Power Allocation
VIRTUS Slough Campus 145MW Data Center United Kingdom Slough Trading Estate, Slough, SL1 4PN, United Kingdom Q4 2026 Operational / Phased Expansion Campus 185.0 MW Total Utility Power Allocation
CyrusOne LON1 9MW Data Center Slough United Kingdom Slough Trading Estate, 12 Liverpool Road, Slough, SL1 4QA, United Kingdom Q4 2018 Operational / Colocation & Enterprise Cloud Hub 15.0 MVA Total Utility Power Allocation
Equinix Slough Campus Data Center London United Kingdom Slough Trading Estate (Buckingham Ave / Liverpool Rd / Banbury Ave), Slough, SL1 4LH, United Kingdom Q4 2021 Operational / Flagship Financial & Cloud Ecosystem Hub 80.0+ MVA Total Utility Grid Capacity
PolarDC HER01 40MW AI Data Center Porsgrunn Norway Herøya Industrial Park, Fjordgata 48, 3936 Porsgrunn, Telemark, Norway Q4 2028 Announced / Retrofit & Site Engineering Phase 50.0 MW Substation Power Allocation
Ferrovial MAD01 40MW AI Data Center Madrid Spain Av. del Monte Valdelatas, 10-16, 28108 Alcobendas, Madrid, Spain Q4 2029 Active Development / Earthworks Permitted 60.0 MW Dedicated Grid Substation Allocation
DC Mudarra 160MW Data Center Valladolid Spain Adjacent to San Lorenzo Wind Farms, Near La Mudarra Substation, 47660 Torrelobatón, Valladolid, Spain Q4 2030 Announced / Environmental Impact Assessment & Administrative Phase 200.0 MW Grid & Co-Located Renewable Allocation
T1 Energy Mo i Rana 50MW AI Data Center Norway Terminalveien 22, 8624 Mo i Rana, Norway Q4 2029 Active Redevelopment / Rezoned for Data Center Operations 50.0 MW Dedicated Allocation (396.0 MW Queue Position)
Techbau Trino 100MW Hyperscale Data Center Vercelli Italy Strada Provinciale 1 (SP1), km 10, 13025 Trino (Vercelli), Piedmont, Italy Q4 2029 Under Construction / Earthworks & Permitting Phase 120.0 MW Grid Substation Allocation
Unidata UniCenter 20MW Tier IV Data Center Rome Viale Alexandre Gustave Eiffel 100 / Ponte Galeria Area, 00148 Rome, Italy Q4 2028 Active Construction / Fit-Out Phase 20.0 MW Total Substation Capacity Allocation
Microsoft Grevenbroich Data Center 200MW North Rhine-Westphalia Germany Landesstraße 361, Grevenbroich, 41515, Germany Q4 2032 Planning / Land Acquisition Phase 200.0 MW Initial Utility Allocation (Scalable up to 1,000.0 MW)
noris network FRA1 Data Center 30MW Schwalbach Frankfurt Germany Am Kronberger Hang 2c, 65824 Schwalbach am Taunus, Frankfurt, Germany Q4 2029 Under Construction 30.0 MW Total Grid Infrastructure Allocation
LVL Energy Data Center 50MW Dabrowa Gornicza Katowice Poland Zygmunta Różyckiego, Tucznawa Investment Zone, 42-523 Dąbrowa Górnicza, Poland Q4 2030 Planned / Pre-Construction Stage 50.0 MW Minimum Initial Grid Allocation (up to 200 MW connection request)
Baltic Data Center Campus 3200MW Lublewko Pomeranian Poland Droga Wojewódzka 213 (DW213), 84-210 Lublewko, Pomeranian Voivodeship, Poland Q4 2032 Planned / Pre-Construction Stage 3,200.0 MW Total Planned Utility Allocation (800 MW per stage)
Monforte del Cid, Alicante / Valencia Region (03679, Spain) Polígono Las Norias, Calle Marrón Imperial, 03679 Monforte del Cid, Alicante, Spain Q4 2029 Planned / Pre-Construction Stage 30.0 MW Initial Connection Allocation
IREN Zamudio Data Center 30MW Bilbao Bizkaia Spain Polígono Industrial de Pinto / Biscay Science & Technology Park, 48170 Zamudio, Bizkaia, Spain Q4 2029 Permitted / Pre-Construction Stage 30.0 MW Initial Grid Allocation (10 MW Phase 1 Buildout)
DC Estate Malpica Campus 300MW Mora Toledo Spain Polígono Industrial Malpica, 45400 Mora, Toledo, Castilla-La Mancha, Spain Q4 2030 Permitted / Pre-Construction Stage 300.0 MW IT Power Capacity (360.0 MW On-Site Generation Facility)
Equinix MD2 Madrid Data Center Alcobendas Spain Calle Valgrande, 6, 28108 Alcobendas, Madrid, Spain Q4 2017 Operational 8.0 MW Total Installed Utility Capacity
Cheops Technology Canéjan Sovereign Cloud Data Center Bordeaux France 37 Rue Thomas Edison, 33610 Canéjan, France Q4 2011 Operational 1.0 MW Utility Supply / 0.6 MW IT Load
EXA Edge DC Bordeaux Edge Colocation Data Center France Bassin à Flots, Bâtiment G2, 27 Quai Lawton, 33000 Bordeaux, France Q4 2008 Operational 0.40 MW Utility Supply / 0.25 MW IT Load
Assetel Data Center Zapopan Guadalajara 1MW C. Quetzalcóatl 512A, Cd del Sol, 45050 Zapopan, Jal., Mexico Q2 2015 Operational 1.2 MW Utility Input / 0.8 MW Total IT Load Capacity
Equinix AM9 Amsterdam Hyperscale IBX Data Center Netherlands Luttenbergweg 1, 1101 ED Amsterdam, Netherlands Q4 2032 Planned / Permitted ~80.0 MW Total Campus Grid Allocation
Krolmap Villanueva de Gállego Data Center Campus Zaragoza Spain Villanueva de Gállego Industrial District / A-1102 Corridor, 50830 Villanueva de Gállego, Zaragoza, Spain Q4 2032 Planned / Permitted ~150.0 MW Total Utility Power Allocation
3data V141 Data Center Moscow Varshavskoye Varshavskoye sh. 141c33, Moscow, 117405, Russia Q4 2026 Under Construction 1.5 MW IT Power (2.5 MW Total Utility Capacity)
AKADO Data Center Moscow Varshavskoye Varshavskoye Hwy, 133, Moscow, 117519, Russia Q4 2012 Operational 3.0 MW IT Power (5.0 MW Total Utility Capacity)
Atomdata 36MW Capacity Colocation Data Center Facility In Moscow Dorozhnaya Ulitsa, 9с1, Moscow, 117545, Russia Q4 2024 Operational 25.0 MW IT Power (36.0 MW Total Utility Capacity)
NUBES 3MW Capacity Colocation Data Center Facility In Moscow 1-Ya Stekol'naya Ulitsa, 7, Moscow, 115404, Russia Q4 2022 Operational 2.2 MW IT Power (3.0 MW Total Utility Capacity)
TrustInfo 10MW Capacity Colocation Data Center Facility In Moscow Varshavskoye Hwy, 125c16, Moscow, 117587, Russia Q4 2008 Operational 6.5 MW IT Power (10.0 MW Total Utility Power Capacity)
Stack Telecom 12MW Capacity Colocation Data Center Facility In Moscow Varshavskoe highway 125 building 1, Moscow, 117587, Russia Q4 2012 Operational 8.0 MW IT Power (12.0 MW Total Utility Power Capacity)
3data 2MW Capacity Colocation Data Center Facility In Moscow ul. Butlerova, 17B, Moscow, 117342, Russia Q4 2015 Operational 1.2 MW IT Power (2.0 MW Total Utility Capacity)
Rostelecom 6.5MW Capacity Colocation Data Center Facility In Moscow Ulitsa Butlerova, 7, Moscow, 117485, Russia Q4 2013 Operational 5.0 MW IT Power (6.5 MW Total Utility Power Capacity)
Contell 1.5MW Capacity Colocation Data Center Facility In Moscow Nauchniy proezd 20, 2, Moscow, 117246, Russia Q4 2014 Operational 1.0 MW IT Power (1.5 MW Total Utility Capacity)
NeoServer 1.5MW Capacity Colocation Data Center Facility In Moscow Odesskaya Ulitsa, 2, Moscow, 117638, Russia Q4 2016 Operational 1.0 MW IT Power (1.5 MW Total Utility Capacity)
Tech.ru 2MW Capacity Colocation Data Center Facility In Moscow Nagatinskaya Ulitsa, 16к1с2, Moscow, 115487, Russia Q4 2015 Operational 1.2 MW IT Power (2.0 MW Total Utility Power Capacity)
MCN Telecom 1.5MW Capacity Colocation Data Center Facility In Moscow 2nd Nagatinsky Drive, 2с8, Moscow, 115487, Russia Q4 2015 Operational 1.0 MW IT Power (1.5 MW Total Utility Power Capacity)
DataHouse 9.8MW Capacity Colocation Data Center Facility In Moscow Elektrolitnyy Proyezd, 3c47, Moscow, 115230, Russia Q4 2011 Operational 6.5 MW IT Power (9.8 MW Total Utility Power Capacity)
RackStore 2.5MW Capacity Colocation Data Center Facility In Moscow 84/32 Profsoyuznaya Str, Moscow, 117997, Russia Q4 2010 Operational 1.8 MW IT Power (2.5 MW Total Utility Power Capacity)
CitySystems 1.5MW Capacity Colocation Data Center Facility In Moscow Leninskiy Prospekt, 53, Moscow, 119333, Russia Q4 2013 Operational 1.0 MW IT Power (1.5 MW Total Utility Power Capacity)
Friesen Elektra 400MW Capacity Colocation Data Center Facility In Sande Wasserstoffpark Friesland, 26452 Sande, Lower Saxony, Germany Q4 2030 Under Construction 320.0 MW IT Load (400.0 MW Total Utility Power Capacity)
Winda Energy 120MW Capacity Colocation Facility In Keminmaa Jäämerentie, Rajakangas, 94450 Keminmaa, Lapland, Finland Q4 2030 Permitting / Regulatory Review 100.0 MW IT Power (120.0 MW Total Utility Power Capacity)
FCDC Corp 50MW Capacity Colocation Facility In Rovaniemi Hietavaara Industrial Area, 96100 Rovaniemi, Lapland, Finland Q4 2030 Permitting / Regulatory Review 40.0 MW IT Power (50.0 MW Total Utility Power Capacity)
Rivington Energy 40MW Capacity Colocation Facility In Bristol Severn Road, Avonmouth, Bristol, BS11 0YL, United Kingdom Q4 2028 Permitting / Regulatory Review 32.0 MW IT Power (40.0 MW Total Utility Power Capacity)
Equinix AM7 18 MW Amsterdam Data Center Netherlands Kuiperbergweg 19, 1101 AE Amsterdam, Netherlands Q2 2019 Operational 18.0 MW
Equinix LD5 30 MW Slough Data Center United Kingdom 8 Buckingham Avenue, Slough Trading Estate, SL1 4AX Slough, United Kingdom Q4 2018 Operational 30.0 MW
Digital Realty PAR7 32 MW La Courneuve Data Center Paris France 1-3 rue Rateau, 93120 La Courneuve, France Q3 2022 Operational 32.0 MW
Google Eemshaven 300 MW Hyperscale Data Center Groningen Oostpolder 4, 9979 XT Eemshaven, Groningen, Netherlands Q4 2026 Operational / Under Expansion 300.0 MW
Google Hamina 350 MW Hyperscale Data Center Campus Finland Ensontie 1, 49420 Hamina, Finland Q4 2028 Operational / Under Major Expansion 350.0 MW
Google Dublin 180 MW Hyperscale Data Center Campus Ireland Grange Castle Business Park South, 22 Baldonnel Road, Clondalkin, Dublin 22, Ireland Q4 2028 Grange Castle Business Park South, 22 Baldonnel Road, Clondalkin, Dublin 22, Ireland 180.0 MW
Meta Clonee 300 MW Hyperscale Data Centre Campus Ireland Portan, Clonee, Co. Meath, D15 P2RV, Ireland Q4 2026 Operational / Under Expansion 300.0 MW
Meta Odense 200 MW Hyperscale Data Center Denmark Odense in Funen, Denmark Q4 2025 Operational / Under Expansion 200.0 MW
Meta Lulea 300 MW Hyperscale Data Center Sweden Datavägen 15, 977 54 Luleå, Norrbotten, Sweden Q4 2024 Operational / Under Expansion 300.0 MW
Applied Digital 1 GW AI Factory Data Center Campus Finland Kajaani / Northern Finland Industrial Zone, Finland Q4 2030 Announced / Under Development 1000.0 MW (1.0 GW)
Equinix FR5 25 MW Frankfurt Data Center Germany Kleyerstrasse 90, 60326 Frankfurt, Germany Q4 2018 Operational 25.0 MW
VIRTUS LONDON19 40 MW Slough Data Center United Kingdom Slough Trading Estate, Slough, SL1 4DX, United Kingdom Q4 2027 Under Construction 40.0 MW
Pure DC SJK01 550 MW AI Data Center Campus Seinäjoki Finland Seinäjoki Data Park, Seinäjoki, Southern Ostrobothnia, Finland 2032+ Under Construction / Phased Buildout 700.0+ MVA Grid Connection (550.0 MW IT Capacity)
DayOne Lahti Data Center 128 MW Hyperscale Campus Finland Väinämöisentie 2, 15170 Lahti, Finland 2028 Under Construction 150 MW Grid Provisioning (128 MW Total IT Capacity)
Nscale Loughton Data Center 90 MW AI Campus Essex UK Langston Road, Loughton, Essex IG10 3TQ / IG10 3SD, United Kingdom 2028 Announced / Under Development (Planning Approved) 50 MW Initial Provisioning (Scalable up to 90 MW Total Electrical Allocation)
Panattoni Barcelona DC01 42MW Data Center Campus Parc de l’Alba, BP-1413, 08290 Cerdanyola del Vallès, Barcelona, Spain Q4 2028 Under Construction / Permitted 42 MW (Phase 1) / 88 MW (Full Campus Capacity)
Compute Nordic Mikkeli AI Data Center 165MW Finland Suonsaarentie 2, Visulahti Industrial Zone, 50180 Mikkeli, Finland Q4 2028 Under Construction 212.0 MW Gross Utility Power Allocation
Nation Data Center Vélizy 6MW Paris Facility 8 Avenue Morane Saulnier, 78140 Vélizy-Villacoublay, France Q4 2022 Operational 6.0 MW Gross Utility Power Allocation
Verne Mäntsälä Data Center 70MW Campus Finland Gneissitie, Kapuli Business Park, 04620 Mäntsälä, Finland Q4 2028 Under Construction 70.0 MW Gross Utility Power Allocation
Vaultica MIL03 Data Center 24MW Milan Via Marisa Bellisario, 20019 Settimo Milanese MI, Italy Q4 2027 Under Construction / In Development 24.0 MW Gross Utility Power Allocation
Green Mountain FRA1 Mainz Data Center 54MW Frankfurt Region Kraftwerkallee 1, 55120 Mainz, Germany Q4 2027 Under Construction 80.0 MW Gross Utility Power Allocation
DATA4 Frankfurt Campus FRA01 Data Center 180MW Hanau Depotstraße, Grossauheim, 63457 Hanau, Hesse, Germany Q4 2030 Under Construction / Groundbroken 180.0 MW Gross Utility Power Allocation
Quetta DC Tres Cantos 16MW Madrid Campus Ronda de Valdecarrizo 8, 28760 Tres Cantos, Community of Madrid, Spain Q4 2026 Under Construction / In Development 16.0 MW Gross Utility Power Allocation
Colt Paris Villebon Campus Data Center 24MW Île-de-France 20 Avenue du Québec, Courtabœuf Industrial Park, 91140 Villebon-sur-Yvette, Île-de-France, France Q4 2026 Operational / Expanding 30.0 MW Gross Utility Power Allocation
Echelon LIN10 Campus Data Center 250MW Milan Via della Costa 2, 24047 Treviglio, Province of Bergamo, Lombardy, Italy Q4 2029 Under Construction / In Development 250.0 MW Gross Utility Power Allocation
ADAM Data Center BCN3 Parc de l’Alba 8MW Barcelona Parc de l’Alba Sincrotró, 08290 Cerdanyola del Vallès, Barcelona, Spain Q4 2027 Under Construction / Groundbroken 8.0 MW Gross Utility Power Allocation
XTX Markets Kajaani Building 3 Data Center 22.5MW Finland XTX Finland Oy, Sokajärventie 24, 87100 Kajaani, Finland 2027 Under Construction / Fit-Out Phase 25.0 MW Gross Utility Power Allocation
Ebbsfleet AI Data Centre Campus 300MW Kent C8CG+4XH Gravesend, United Kingdom 2033 Announced / In Planning (NSIP DCO Process) 300.0 MW Gross Utility Power Allocation
CX Technology Campus Chapelcross Data Centre 1GW Scotland Former Chapelcross Nuclear Power Station site, B722, near Annan, Dumfries and Galloway DG12 6RF, Scotland, United Kingdom 2035 Announced / In Planning (Planning Permission in Principle Application Submitted) 1,000.0 MW (1.0 GW) Gross Utility Power Allocation
Denham Data Centre Campus 100MW Buckinghamshire Denham Court Drive, Denham, Buckinghamshire UB9 5PG, United Kingdom Q4 2030 Announced / In Planning 100.0 MW Gross Utility Power Allocation
Project Blackwater Campus Data Center Chelmsford Essex Beaulieu Park, Loverose Way, Chelmsford, Essex CM3 3HR, United Kingdom Q4 2030 Announced / In Planning 90.0 MW Gross Utility Power Allocation
Elevate Quarter Data Centre Campus 55MW Stevenage Gunnels Wood Road, Stevenage, Hertfordshire SG1 2FX, United Kingdom 2029 Under Construction / Development Phase 55.0 MW Gross Utility Power Allocation
Wycombe Film Studios Data Centre Campus High Wycombe Wycombe Air Park, Clay Lane, Booker, High Wycombe, Buckinghamshire SL7 3DP, United Kingdom 2031 Approved / Planning Permission Minded-to-Grant (Outline) 75.0 MW Gross Utility Power Allocation
CyrusOne LON6 Data Centre Campus 210MW Iver Heath UK Seven Hills Road, Iver Heath, Buckinghamshire SL0 0PA, United Kingdom (Historic site adjacent to Shannon Training 2032 Approved / Planning Granted 210.0 MW Gross Utility Power Allocation
NTT GDC Berlin 3 Data Center Campus Brieselang Brandenburg Brieselang, Brandenburg 14656, Germany (Exact site coordinates proprietary / confidential industrial zone approx. 30 km west of central Berlin) 2031 Under Development / Master Planning Phase Multi-Megawatt Gross Utility Power Allocation
EdgeConneX Skelleftea Campus Data Center 1GW Sweden Torsgatan 122, Bergsbyn, Skellefteå 931 36, Sweden (Exact building coordinates within Lyten Industrial Hub proprietary) 2034 Announced / Site Acquisition & Pre-Development Phase 1,000.0 MW (1.0 GW) Gross Utility Power Allocation
EcoDataCenter Smedjebacken Campus Data Center 150MW Dalarna Nya Humbobergsvägen, Smedjebacken, Dalarna County 777 34, Sweden 2031 Announced / Permitting & Pre-Development Phase 150.0 MW Gross Utility Power Allocation
Digital Realty Ankara Data Center Campus 22MW Türkiye Ankara, Türkiye (Exact secure street address and parcel coordinates are proprietary / confidential) 2030 Announced / Initial Development & Planning Phase 22.0 MW Gross Utility Power Allocation
Nscale Harjavalta Campus Data Center 100MW Finland Hiittenkiukaantie and Valtaväylä (Highway 2), Sievari Industrial Area, Harjavalta 29200, Finland 2029 Approved / Site Acquisition & Pre-Construction Phase 100.0 MW Gross Utility Power Allocation
VOLT Rotterdam AI Gigafactory Data Center 800MW Netherlands Markweg, Europoort Rotterdam, Port of Rotterdam, 3198 LK Rotterdam, South Holland, Netherlands 2033 Announced / Pre-Development & Master Planning Phase 800.0 MW Gross Utility Power Allocation
DATA4 Athens Campus ATH01 Data Center 90MW Peania Greece Agiou Louka 33, Peania 190 02, Attica, Greece (7.5-hectare campus footprint in Peania industrial zone) 2030 Under Construction (Groundbroken November 2024) 90.0 MW Gross Utility Power Allocation90.0 MW Gross Utility Power Allocation
GTR London GB Two Campus Data Centre Southall London International Trading Estate, Southall, London UB2 5LB, United Kingdom 2031 Approved / Pre-Construction & Site Preparation Phase Multi-Megawatt Utility Power Allocation
Ark Data Centres Elstree Campus Data Center 200MW Watford UK A41 Watford Bypass, former Mercure Hotel Site (Hilfield Park), Watford, Hertfordshire WD25 8JH, United Kingdom 2033 Announced / Planning & Pre-Development Phase 200.0 MW Gross Utility Power Allocation
Sesterce Bosquel AI Data Center 1GW Hauts-de-France Rue d’Amiens, 80160 Bosquel, Somme, Hauts-de-France, France 2033 Announced / Site Master Planning & Environmental Permitting Phase 1,000.0 MW (1.0 GW) Gross Utility Power Allocation
DCP Munich 1 Data Center 18MW Unterschleissheim Bavaria Carl-Linde-Straße, 85716 Unterschleißheim, Bavaria, Germany (10,000 m² total gross building area) 2030 Pre-Development & Master Planning Phase 30.0 MVA Gross Utility Power Allocation
Risti Data Center Campus 400MW Lääne-Nigula Estonia Kolge tee, 90904 Risti, Lääne-Nigula, Lääne County, Estonia 2032 Pre-Development & Site Master Planning Phase (Detailed Plan Application Filed March 2026; Joint Venture Expanded September 2026) 400.0 MW Gross Utility & Renewable Power Allocation (180.0 MW Phase 1 Capacity)
GDD Schladen-Werla Data Center Campus 120MW Lower Saxony Germany Marktteichweg 2, 38315 Schladen-Werla, Lower Saxony, Germany 2031 Pre-Development & Urban Land Use Planning Phase (Resolution on Development Plan Initiated) 120.0 MW Gross Utility Power Allocation
Switch Datacenters WAW1 Data Center 20MW Warsaw Poland Kręta 39–37, 05-850 Mory, near Warsaw, Masovian Voivodeship, Poland (Strategic connectivity corridor west of Warsaw) 2030 Pre-Development & Site Master Planning Phase 20.0 MW Gross Utility Power Allocation
IREN Cáceres Data Center Campus 70MW Extremadura Spain Polígono Industrial Las Capellanías, 10005 Cáceres, Extremadura, Spain (Part of the CCGreen Eco-Industrial Master Plan) 2030 Pre-Development & Site Permitting Phase (Acquired via Ingenostrum transaction in June 2026) 100.0 MW Gross Utility Power Allocation
DNA Oulu Torikatu Data Center 2MW Northern Finland Torikatu 18, 90100 Oulu, Northern Ostrobothnia, Finland (Downtown Oulu telecom & edge corridor) Operational Operational Facility / Regional Telecom & Edge Colocation Hub 2.0 MW Gross Utility Power Allocation
Trevian Leväsuo Data Center Oulu Northern Finland Elektroniikkatie 10, 90590 Oulu, Northern Ostrobothnia, Finland 2029 Pre-Development & Master Planning Phase (Brownfield Redevelopment) 20.0 MW Gross Utility Power Allocation
Glesys Oulu Data Center Elektroniikkatie Northern Finland Elektroniikkatie 13–15, 90590 Oulu, Northern Ostrobothnia, Finland Operational Operational Facility (Acquired via Oulun DataCenter Oy integration) 0.7 MW Gross Utility Power Allocation
Glesys Oulu Rusko Data Center Campus 300MW Finland Kaapelitie 4, 90620 Oulu, Northern Ostrobothnia, Finland 2032 Pre-Development & Site Master Planning Phase (Partnership Announced June 2026) 300.0 MW Gross Utility Power Allocation
Arcem Oulu Johdintie Data Center Campus Northern Finland Johdintie, Ruskonselkä Industrial District, 90620 Oulu, Northern 2031 Pre-Development & Site Reservation Phase (Feasibility Study Phase) 150.0 MW Gross Utility Power Allocation
Meta Ii Data Center Campus Kivijärvensuo Finland Kivijärvensuo, 91150 Kärppäsuo, Municipality of Ii, Northern Ostrobothnia, Finland ( 2033 Land Banked / Pre-Development & Site Master Planning Phase 450.0 MW Gross Utility Power Allocation
BiltTek Veitsiluoto Data Center Kemi Finland Poikkitie 6, 94800 Kemi, Lapland, Finland 2031 Pre-Development & Industrial Conversion Phase 100.0 MW Gross Utility Power Allocation
BiltTek Tervaharju Edge & Grid-Adaptive Data Center Kiveliönkatu, Tervaharju District, 94700 Kemi, Lapland, Finland 2027 Permitted / Pre-Development Phase (Permit Granted August 2025) 10.0 MW Gross Utility Power Allocation
AiOnX Örträsk Sustainable AI Compute Facility Länsväg AC 845, 935 93 Norsjö, Örträsk District, Västerbotten County, Sweden 2029 Target Operational & Active Expansion Phase (Pivoted to High-Density AI Compute) 100.0 MW Gross Utility Power Allocation (7.5 MW Operational Phase)
EcoDataCenter Piteå Arctic Data Center Campus Träskåsvägen 229, 943 36 Piteå (Hortlax), Norrbotten County, Sweden Operational (4.5 MW Active Envelope) Operational & Active Expansion Phase 4.5 MW Gross Utility Power Allocation
PureDC Madrid Meco Flagship Hyperscale Campus Calle Zeus 19–17, 28880 Meco, Community of Madrid, Spain 2029–2030 Under Construction Phase (Phase 1 Groundbreaking November 2025) 70.0 MW Gross Utility Power Allocation (30.0 MW Phase 1 / 40.0 MW Phase 2)
AVAIO Digital Algete Data Hub Campus Algete Industrial Zone, 28119 Algete, Community of Madrid, Spain 2030 Active Development / Permitting & Pre-Construction Phase 64.0 MW Gross Utility Power Allocation (51.2 MW Critical IT Load)
Art Data Centre Ennis Hyperscale AI Campus R352 Road (Toberteascane / Toureen), off the N18/M18 Corridor, Ennis, County Clare, Ireland 2032–2033 Permitted / Pre-Construction Phase (Supreme Court Clearance October 2026) 200.0 MW Gross Utility Power Allocation (Six 33.3 MW Data Center Halls)
Cisco Krakow R&D & AI Innovation Data Center Kraków Technology Park / Special Economic Zone Region, Kraków, Lesser Poland Voivodeship 30-707, Poland 2026 Active Development / Construction Phase (Groundbroken July 2026) 5.0 MW Gross Utility Power Allocation (4.0 MW Critical IT Load)
T.Loop Hanko Data Energy Center (DEC) Hanko Eastern Industrial Area, 10960 Hanko, Uusimaa Region, Finland 2028–2029 Active Development / Expansion Phase (Announced May 2026) 20.0 MW Gross Utility Power Allocation (16.0 MW Critical IT Load)
Equinix IL3 9 MW Data Center Istanbul Türkiye Dudullu Organized Industrial Zone (Dudullu OSB), Ümraniye, Istanbul 34775, Türkiye Q3 2026 Under Construction 9 MW facility power capacity
Equinix LD14 30 MW Data Center Slough London 11 Banbury Avenue (9-13 Banbury Avenue), Slough Trading Estate, Slough, Berkshire SL1 4LH, United Kingdom Q1 2027 Under Construction 30 MW facility power capacity
Equinix PA12x xScale Data Center Paris France 18-82 Rue de Montigny, 95100 Argenteuil, Paris, France Q2 2026 Under Construction Not publicly disclosed
Equinix PA14 Data Center Aubervilliers Paris Rue du Corindon, 93300 Aubervilliers, Paris, France Q2 2028 Under Construction Not publicly disclosed
Equinix DB7x Dublin Data Center Blanchardstown Corporate Park / Ballycoolin Zone, Blanchardstown, Dublin 15, Ireland 2027–2028 Under Construction 12.5 MW Gross Utility Power Allocation (10.0 MW Critical IT Load)
Equinix PA13x Paris xScale Data Center 9 Avenue du Maréchal Juin, 92190 Meudon, Hauts-de-Seine, Île-de-France, France February 2025 Fully Operational 35.0 MW Gross Power Allocation (28.8 MW Critical IT Capacity)
Equinix IL4 Istanbul International Business Exchange Dudullu OSB, 3. Cadde, No. 4, Yukarı Dudullu, 34776 Ümraniye, İstanbul, Türkiye Operational Fully Operational 7.5 MW
AWS DUB Clonshaugh Data Center Campus Clonshaugh Business & Technology Park, Priorswood, Dublin 17, Ireland Operational Multi-Building Expansion Campus Fully Operational ~165.0 MW Combined Gross Utility Allocation (~132.0 MW Total Critical IT Capacity)
AWS DUB Hibernian Data Center Campus Hibernian Industrial Estate, 30A Greenhills Road, D24 TW42 Kilnamanagh, Dublin, Ireland Operational Multi-Building Expansion Campus Fully Operational / Active Multi-Building Campus Expansion 120.0 MW Combined Gross Utility Power Allocation (96.0 MW Total Critical IT Capacity)
AWS DUB Mulhuddart Data Center Campus Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland Operational Multi-Building Expansion Campus Active Development and Multi-Building Operational Campus Phase 175.0 MW Combined Gross Utility Allocation (140.0 MW Total Critical IT Capacity)
AWS DUB Tallaght Data Center Campus Airton Road / Belgard Road (Former Jacob's Biscuits Industrial Site), Tallaght, Dublin 24, D24 DA27, Ireland Operational Multi-Building Expansion Campus Fully Operational 55.0 MW Combined Gross Utility Power Allocation (45.0 MW Total Critical IT Capacity)
AWS DUB Airton 1 Data Center Airton Road, Tallaght, Dublin 24, D24 F200, Ireland Operational Fully Operational / Active Node 27.5 MW Gross Utility Power Allocation
AWS DUB Airton 2 Data Center Airton Road / Belgard Road (Building 2 West), Tallaght, Dublin 24, D24 DA27, Ireland Operational Fully Operational / Active Node 28.5 MW Gross Utility Power Allocation (23.0 MW Critical IT Capacity)
AWS DUB Blanchardstown 1 Data Center Blanchardstown Corporate Park / Industrial Park, Snugborough Road, Blanchardstown, Dublin 15, Ireland Operational Fully Operational / Active Core Node 30.0 MW Gross Utility Power Allocation
AWS DUB Blanchardstown 2 Data Center Blanchardstown Corporate Park / Industrial Park, Snugborough Road, Blanchardstown, Dublin 15, Ireland Operational Fully Operational 30.0 MW Gross Utility Power Allocation (24.0 MW Critical IT Capacity)
AWS DUB Hibernian 5 Data Center Hibernian Industrial Estate, 30A Greenhills Road, D24 TW42 Kilnamanagh, Dublin, Ireland Operational Fully Operational 25.0 MW Gross Utility Power Allocation (20.0 MW Critical IT Capacity)
AWS DUB Kildare Innovation Campus Data Center Kildare Innovation Campus, Barnhall, Leixlip, County Kildare, W23 X5R2, Ireland 2028 Target Active Development 150.0 MW Combined Gross Utility Allocation (120.0 MW Total Critical IT Capacity)
AWS DUB Mulhuddart 1 Data Center Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland Operational Fully Operational / Active Node 35.0 MW Gross Utility Power Allocation (28.0 MW Critical IT Capacity)
AWS DUB Mulhuddart 2 Data Center Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland Operational Fully Operational / Active Node 35.0 MW Gross Utility Power Allocation (28.0 MW Critical IT Capacity)
CDC San Mateo Data Center Campus Polígono Industrial Río Gállego, San Mateo de Gállego, Zaragoza 50840, Spain 2035 Active Development / Permitted Master-Planned Campus Phase 570.0 MW Combined Gross Utility Allocation (456.0 MW Total Critical IT Capacity)
BXIA Data Center Campus Bordeaux Parc des Expositions de Bordeaux, Cours Jules Ladoumègue, 33300 Bordeaux, France 2033 Active Development 380.0 MW Combined Gross Utility Allocation (250.0 MW Total Critical IT Capacity)
Frankfurt DATA FFO AI Campus Müllroser Chaussee, 15234 Frankfurt (Oder), Brandenburg, Germany 2033 Active Development / Permitted Master-Planned Campus Phase 400.0 MW Combined Gross Utility Allocation (320.0 MW Total Critical IT Capacity)
Telis Lower Saxony Data Center Campus Hämelerwalder Straße (L413), North of Mehrum, 31249 Hohenhameln, Lower Saxony, Germany 2034 Planned 500.0 MW Combined Gross Utility Allocation (400.0 MW Total Critical IT Capacity)
Eclairion La Maxe Data Center Chemin Thury, 57140 La Maxe, Moselle, France 2030 Active Development / Permitted Master-Planned Campus Phase 250.0 MW Combined Gross Utility Allocation (200.0 MW Total Critical IT Capacity)
DATA4 Cambrai Data Center Campus Parc E-Logistique Épinoy-Cambrai (Base Aérienne 103), 62860 Épinoy, France 2035 Active Development / Permitted Master-Planned Campus Phase 1000.0 MW Combined Gross Utility Allocation (800.0 MW Total Critical IT Capacity)
Digital Realty Paris PAR14 Data Center 14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France 2021 Fully Operational 3.2 MW Combined Gross Utility Allocation (2.4 MW Total Critical IT Capacity)
Digital Realty Paris PAR15 Data Center Rue Sébastien et Jacques Lorenzi, 93440 Dugny, France 2030 Under Construction / Active Groundbreak Phase 82.5 MW Gross Utility Allocation (66.0 MW Total Critical IT Capacity for PAR15)
Digital Realty Paris PAR16 Data Center Rue Sébastien et Jacques Lorenzi, 93440 Dugny, France 2030 Active Development 68.8 MW Combined Gross Utility Allocation (55.0 MW Total Critical IT Capacity for PAR16)
Era4 Shelford Data Center Canterbury Shelford Farm Estate, Shalloak Rd CT2 0PRCanterbury 2027 Permitted 7.2 MW Combined Gross Utility Allocation
Humber Tech Park Data Center Campus A160 and Habrough Road, South Killingholme, North Lincolnshire DN40 3BA, United Kingdom 2030 Permitted 384.0 MW Total Critical IT Capacity (Gross Utility Allocation NA)
Southside Data Centre Campus Scottish Borders Land near Clawbare Cottage, Longformacus, near Duns, Scottish Borders, Scotland TD11 3PG, United Kingdom NA Pre-Application / Environmental Impact Assessment (EIA) & Public Consultation Phase 225.0 MW Combined Gross Power Capacity (Critical IT Load NA)
Dugny Digital Realty Digital Hub Data Center Campus Place Sébastien et Jacques Lorenzi, 93440 Dugny, Seine-Saint-Denis, France NA Under Construction Critical IT Load NA (Gross Utility Allocation NA)
Sembcorp Teesside Data Center Campus Wilton International, Greystones Roundabout, Lazenby, Teesside TS6 8JF, United Kingdom NA Permitted 280.0 MW Total Critical IT Capacity (Gross Utility Allocation NA)
VIRTUS Saunderton Data Centre Campus Buckinghamshire Haw Lane, Saunderton, Buckinghamshire HP14 4JD, United Kingdom 2027 Under Construction 78.0 MW Total Critical IT Capacity
Conesby Data Centre Campus Scunthorpe Normanby Road, Foxhills Industrial Estate, Scunthorpe, North Lincolnshire DN15 9BE, United Kingdom NA Permitted 180.0 MW Total Critical IT Capacity (Gross Utility Allocation NA)
Graven Hill Data Center Campus Bicester Anniversary Avenue, Ambrosden, Bicester, Oxfordshire OX26 6HF, United Kingdom NA Permitted 290.0 MW Total Critical IT Capacity (435.0 MW Gross Utility Capacity Allocation)
Digital Realty DUS1 Data Center Zagreb In der Steele 25–45, 40599 Düsseldorf, North Rhine-Westphalia, Germany 2009 Fully Operational 2.3 MW Critical IT Capacity Allocation
Digital Realty DUS2 Data Center Düsseldorf In der Steele 39–45, 40599 Düsseldorf, North Rhine-Westphalia, Germany 2013 Fully Operational 3.5 MW Critical IT Capacity Allocation
Digital Realty ATH3 Data Center Athens Koropi Ifestou 74 (Varis Koropiou Avenue), Koropi 194 00, Attica, Athens, Greece 2023 Fully Operational 6.8 MW Critical IT Capacity (10.0 MW Gross Power Allocation)
Digital Realty DUB10 Data Center Dublin Blanchardstown Unit 9, Blanchardstown Corporate Park, Dublin 15, Ireland 2018 Fully Operational 10.0 MW Critical IT Load (15.0 MW Gross Power Allocation)
Digital Realty DUB11 Data Center Dublin Clonshaugh Unit 1, Clonshaugh Business & Technology Park, Dublin 17, Ireland 2020 Fully Operational 12.0 MW Critical IT Load (18.0 MW Gross Power Allocation)
Echelon Kilmeaden Campus Data Center Waterford R680 Road, Kilmeaden, County Waterford, Ireland 2030 In Planning 300.0 MW Critical IT Load (500.0 MW Gross Power Allocation Master Plan)
APL Varkaus Data Center Campus Finland Pöppökalliontie, 78400 Varkaus, North Savo, Finland 2029 In Planning 60.0 MW Critical IT Load (100.0 MW Gross Power Capacity Allocation)
Sesterce Jämsä Data Center Campus Finland Former Kaipola Paper Mill Site, Tehtaankatu 1, Jämsä 42220, Central Finland 2029 In Planning 400.0 MW Critical IT Load (600.0 MW Gross Power Allocation Master Plan)
Equinix Wexham Road Campus Data Center Slough Wexham Road, Slough, Berkshire SL2 5DS, United Kingdom 2030 In Planning / Master Development Phase 50.0 MW Critical IT Load (75.0 MW Gross Power Allocation Master Plan)
Microsoft Langley Data Center Slough Berkshire Langley Business Centre, 6A Station Road, Langley, Berkshire SL3 8DS, United Kingdom 2031 In Planning 40.0 MW Critical IT Load (60.0 MW Gross Power Allocation Master Plan)
ADA London Docklands LCY01 Data Center St Vincent Ferrer Lane, Silvertown, London E16 2AP, United Kingdom 2030 In Planning 210.0 MW Critical IT Load (250.0 MW Gross Power Allocation Master Plan)
FlexBase Technology Center AI Data Center Laufenburg Former Swissgrid Site, Werkstrasse 12, 5080 Laufenburg, Canton of Aargau, Switzerland 2028 Under Construction 100.0 MW Critical IT Capacity (150.0 MW Gross Power Allocation; Integrated with 1.2 GW Redox Flow Battery System)
Firstcolo Data Center Rosbach FRA7 Germany Hertha-Sponer-Straße, 61191 Rosbach vor der Höhe, Hesse, Germany 2029 Under Construction 18.0 MW Critical IT Load (24.0 MW Gross Power Allocation Master Plan)
MasterDC Kanice AI Data Center Czech Republic Kanice 176, 664 01 Kanice, South Moravian Region, Czech Republic 2029 Under Construction 4.0 MW Critical IT Load (25.0 MW Gross Power Allocation Master Plan)
Turksat Golbasi Data Center Ankara 40th km, Ankara–Konya Road, Gölbaşı, Ankara 06830, Türkiye 2029 Under Construction 21.0 MW Critical IT Load (33.0 MVA Gross Utility Power Capacity)
CRA Prague Gateway Data Center Jíloviště 178, 252 02 Jíloviště, Czech Republic 2030 Under Construction 17.3 MW Critical IT Load (26.0 MW Gross Power Allocation; 44.0 MW Grid Reserve)
NXDATA-3 Bucharest Data Center Romania 38 Bucharest Ring Road (Șoseaua de Centură București Nr. 38), Tunari, Ilfov 077180, Romania 2027 Under Construction 4.0 MW Critical IT Load (5.0 MW Gross Power Allocation)
Digital Realty ZUR1 Zurich Data Center Sägereistrasse 29 & 35, 8152 Glattbrugg, Switzerland Operational Operational 12.0 MW Critical IT Load (18.0 MW+ Gross Campus Utility Power Allocation)
Digital Realty ZUR2 Zurich Data Center Bäulerwisenstrasse 4, 8152 Glattbrugg, Switzerland Operational Operational 12.0 MW Critical IT Capacity (Up to 150 kW per Rack Density Support)
Digital Realty ZUR3 Zurich Data Center Bäulerwisenstrasse 6, Building 2, CH-8152 Glattbrugg, Switzerland 2022 Operational 24.0 MW Critical IT Capacity (25.0 MW+ Gross Building Utility Power Allocation)
Digital Realty ZUR4 Zurich Data Center Bäulerstrasse 6, CH-8152 Glattbrugg, Switzerlandz 2028 Under Construction 15.0 MW Critical IT Capacity (20.0 MW+ Gross Building Utility Power Allocation)
NorthC Frankfurt 1 Data Center Germany Mainzer Landstraße 695, 65934 Frankfurt am Main, Germany Operational Operational 4.0 MW – 6.0 MW Critical IT Capacity (10.0 MW+ Gross Utility Power Allocation)
NxN Datacenter Madrid Hortaleza Spain Calle de las Abelias 1, Hortaleza, Madrid 28042, Spain 2026 Operational 7.5 MW Critical IT Capacity in 2N Redundant Configuration (15.0 MW Total Gross Power Allocation)
YEXIO Dorfen Data Center Germany Zieglhaus 3, Gewerbegebiet Dorfen Süd-West, 84405 Dorfen, Germany 2028+ Under Construction 4.0 MW Planned Full Buildout IT Capacity (2.0 MW Initial Phase 1 IT Load)
QTS Cambois Data Center Campus Northumberland Former Blyth Power Station Site, Cambois, Blyth, Northumberland NE24 1BG, United Kingdom 2035 Under Construction 720.0 MW Critical IT Load / 1,100.0 MW Gross Power
QTS Eemshaven Data Center Netherlands Huibertgatweg 2, 9979 XZ Eemshaven, Groningen, Netherlands 2026 – 2027 Operational 36.0 MW+ Critical IT Load (Doubling via EEMSDC2)
QTS Forssa Data Center Campus Finland Ratasmäki Industrial Area, 30100 Forssa, Finland NA Planned Up to 450.0 MW Planned IT Load
Playmobil Digital Data Center Campus Dietenhofen Germany Former Playmobil Production Site, Neustädter Straße 26, 90599 Dietenhofen, Middle Franconia, Bavaria, Germany NA Planned / Brownfield Industrial Redevelopment 100.0 MW Initial Connection Capacity (Expandable)
Northern Energy Riihimäki Data Center Finland Riihimäenportti VI, Intersection of Hämeenlinnantie & Lahdentie, Riihimäki, Kanta-Häme, Finland 2033 Proposed / Preliminary Land Agreement & Zoning Preparation NA
Minreal Kankaanpää AI Data Center Finland Ruukinkatu Industrial Area, Kankaanpää, Satakunta, Finland NA Planned 40.0 - 45.0 MW
Meridian One Data Center Campus West Sussex UK Jobs Lane, Hickstead, West Sussex RH17 5NZ, United Kingdom 2036 (10-Year Indicative Horizon) Planned 100.0 MW
Fortum Pispantalli Data Center Campus Valkeakoski Finland Pispantalli, Valkeakoski, Pirkanmaa, Finland NA Planned 800.0 MW
Durham Technology Park Data Center Campus Seaham UK Murton Lane, between South Hetton, Murton and Easington Lane, Seaham, County Durham SR7 9TN, United Kingdom NA Planned 500.0 MW
Agios Dimitrios PPC-AWS Data Center Campus Kozani Greece Agios Dimitrios Power Plant, Ellispontos, Kozani 501 00, Western Macedonia, Greece 2031 Planned 300.0 MW
Northern Europe Energy Salaspils Data Center Latvia Riga, Latvia, EU Info is not publicly available Planned Over 200.0 MW
Heim 01 Data Center Finland Capital North Helsinki FInland 2030 Planned 50.0 MW Immediate Capacity
Heim 02 Data Center Finland Capital North Specs Finland Capital Area, Finland (250,000 square meter plot) 2030 Planned (Building Permit Process) 60.0 MW Immediate Capacity (+40.0 MW in 2028; +400.0 MW TBC in 2030)