Europe

Europe – Data Center Regional Overview

Europe is a mature and strategically important data center market, characterized by strong enterprise demand, advanced regulatory frameworks, and a growing emphasis on sustainability. The region serves as a critical hub for cloud infrastructure, financial services, content delivery, and cross-border digital traffic.

Key European markets benefit from robust fiber connectivity, dense subsea cable networks, and proximity to major enterprise and government customers. Increasing adoption of cloud computing, AI workloads, and digital services continues to drive demand for hyperscale and colocation data centers, while edge deployments gain traction to support latency-sensitive applications.

Sustainability plays a central role in European data center development, with operators increasingly investing in renewable energy sourcing, energy-efficient cooling technologies, and carbon-neutral operations. At the same time, strict data protection regulations and planning approvals influence site selection and development timelines.

Europe’s data center landscape is evolving beyond traditional core hubs, with secondary and emerging markets gaining importance due to power availability, land access, and cost optimization. This positions the region for steady long-term growth despite regulatory and infrastructure complexities.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Portugal’s Start Campus Launches SIN01, Advancing a 1.2GW Gigascale Vision Sines, Portugal (Atlantic Coast) 2030+ Operational (First Building, SIN01) 1.2 GW (Secured Total Grid Capacity)
AWS European Cloud Region for Data Sovereignty Germany Initial launch by late 2026; full investment deployed by 2029 Confirmed / Under Construction Significant capacity as part of the total €7.8B investment in the region
Start Campus SINES01 | Next-Generation Data Center Campus in Sines, Portugal ZILS (Sines Industrial and Logistics Zone), Sines, Portugal 2028 - 2030 Under Construction / Phase 1 Operational 1.2 GW
WBS Power / Prime Capital Hyperscale Campus | Co-Located Project Jupiter AI Hub Former military airfield, Brandenburg, Germany Phased development Pre-Construction/Planning (Targeting 2026/2027 Start) 500 MW
DUB20 Hyperscale Campus Arklow, County Wicklow, Ireland (Greater Dublin Area) Target 2028-2030 Under Construction (Initial Phase Piling & Shell) 90 MW
Apto Data Center Campus in Lacchiarella Lacchiarella (Milan Metropolitan Area), Italy N/A Announced / Early Development Phase 300 MW
Global Switch London East GS2 | High-Density Colocation & Infrastructure Expansion London Docklands (East India Dock), United Kingdom Expected completion in the late 2020s. Upgrade/Reconfiguration - Underway 74 MW
Madrid Sur Campus by Echelon Iberdrola Digital Infra Madrid Sur Area, Spain (South of Madrid) N/A (Potential for 700 MW+ across the JV's secured portfolio) Planning / Pre-Construction (Secured Power Connection) 230 MW
Microsoft DUB14 Dublin Data Center | Next-Gen Hyperscale Compute Campus in Ireland Grange Castle Business Park, Clondalkin, Dublin, Ireland Projected over 5-7 years Under Construction / Phased Buildout 240 MW
CyrusOne FRA7 Frankfurt Westside Campus Griesheim (West of Frankfurt), Germany Expected completion in phases over several years. Under Construction 126 MW
SINES 4.0 | Next-Generation Data Center Campus in Sines, Portugal Sines, Portugal (ZILS - Sines Industrial and Logistics Area) Estimated by 2030-2035 (phased) Under Construction/Ongoing Phased Development Up to 1.2 GW
Brookfield AI Data Center Campus Development Strängnäs (Stockholm Metro Area), Sweden Est. 2035 – 2040 (10-15 year construction timeline) Announced / Long-term Development Initial planned expansion from 300 MW to 750 MW
VIRTUS Wustermark Megacampus | Next-Generation Colocation & Digital Infrastructure Campus Wustermark (30 km west of Berlin), Germany Est. 2028-2030 Under Construction / Phased Development Up to 300 MW (Across 9 data center buildings)
Microsoft Middenmeer Campus | High-Performance AI & Cloud Infrastructure Expansion (AMS13/14) Middenmeer, Hollands Kroon (North Holland), Netherlands Long-term development Announced / Under Phased Construction Significant multi-MW capacity added over 50 hectares of new land
Fossefall Data Center | AI Factory for Scalable Cloud & GPU Workloads Fyresdal, Vestfold and Telemark County, Norway Phased towards 500 MW goal by 2030 across the Nordic region. Announced / Acquisition Complete (Late 2025) Commissioning Commissioning Phased conversion, initial AI capacity launch expected H Initial 5.5 MW (Existing reserved capacity)
Google Data Center Expansion, Saint-Ghislain Campus Saint-Ghislain, Hainaut Province, Belgium Continuous phased expansion over the next decade. Announced / Active Expansion (Investment committed late 2025) Significant increase from current load; scaled to support multi-phase gigawatt-scale AI requirements.
Amsterdam Hyperscale Campus Greater Amsterdam Region, Netherlands To be determined (Likely multi-year development) Announced / Pre-Construction (Lease Secured) Up to €1 Billion in construction investment; Hyperscale scale, multi-megawatt IT load.
Frankfurt Hyperscale Campus Colt DCS 4 & 5 Rhine-Main Region, Frankfurt, Germany TBC Announced / Land Secured & Power Contracts Signed 63 MW (Total IT Load)
Vantage CWL1 Cardiff | Next-Generation Colocation & Digital Infrastructure Campus Celtic Way, Newport, South Wales, UK Estimated completion of all three buildings by 2026-2027 Partially Operational / Expanding 148MW+ (Upgradeable)
Equinix Lelystad AI Data Center (AMS10) Flevokust Haven, Lelystad, Netherlands 2030 Planning / Pre-Construction 150 MW Dedicated Site Power
QuantumBasel Tempo Hub | IonQ Quantum Computing & Data Science Platform uptownBasel Campus, Arlesheim/Basel, Switzerland 2029 Active Expansion / Technology Integration Scalable Hub (Quantum systems are high-efficiency)
Goodman GEDCDP | European Data Centre Development & Investment Partnership Frankfurt (Germany), Amsterdam (Netherlands), Paris (France) 2030 Announced / Pre-construction 435 MW Total Portfolio
AMS11 Amsterdam Data Tower Campus by Digital Realty Science Park, Amsterdam, Netherlands Q3 2026 Live / Operational 27 MW IT Capacity
Sesterce "Rhône-Alps" AI Mega-Campus Lyon-Valence Logistics Hub, Auvergne-Rhône-Alpes 2032 Latest Launch (Active Execution Phase - Jan 2026) 1 GW (Initial Execution)
Hertfordshire Campus Equinix DC01UK Hertfordshire, UK 2029 Under Development / Construction Phase 250 MW IT Load
Villasequilla AI Campus | High-Performance AI Compute & Connectivity Facility Villasequilla, Spain 2029 Approved / Ready-to-Build (RTB) 600 MW IT Load
Digital Realty FRA18: 16MW AI-Ready Heritage Facility Frankfurt Estimated late 2027 Phase 1 Live (Operational) 16 MW Total
DayOne Nurmijärvi: 300MW Renewable AI Campus Nurmijärvi, Finland 2030 Phase 1 Groundbreaking / Early Construction 300 MW (Total Campus Buildout)
Mediterra Barcelona: 12MW AI-Ready Edge-Hyperscale Hub Strategic site in Catalonia, near Barcelona 2029 Launched / Site Acquired (Feb 20, 2026) Secured 12 MW
Osae-NFU 250MW AI Data Center Bordeaux France Former Industrial Site, Bordeaux Metropole 2029 Groundbreaking (Today) 250 MW IT Load
Digital Realty FRA20: 16MW AI-Ready Hyper-Scale Frankfurt Digital Park Fechenheim, Frankfurt Estimated 2028–2029 (Total Campus) Under Construction (Phase 1 Groundbreaking) 16 MW (IT Load)
Google Skien Norway: 240MW Hyperscale AI-Ready Data Center Skådalsvegen, Skien, Telemark, Norway 2030 (Planned 840 MW) Live / Commissioning 240 MW
atNorth SWE04 Sollefteå AI Campus (300 MW) Sollefteå (Långsele) 2031 Announced (Feb 24, 2026) 300 MW Total Utility Capacity
AWS Aragon Expansion: 33.7B Euro AI & Cloud Infrastructure Zaragoza, Multi-site: Zaragoza, Huesca, and Teruel (Aragon Region) 2030 Announced / Under Expansion Total regional capacity projected at 1 GW+ by full buildout
DT-NVIDIA AI Factory Munich: €1B 10,000 Blackwell GPU Hub Munich (Refurbished Industrial Site) 2028 Go-Live: March 4, 2026 10,000 NVIDIA Blackwell GPUs (Initial phase)
Google Waltham Cross: $1B AI Data Centre Hertfordshire UK , Waltham Cross, Hertfordshire 2026 Operational (Inaugurated Sept 2025) Estimated 100 MW Utility Feed
Google Dietzenbach: €5.5B AI Data Center & Heat Recovery Germany Dietzenbach (near Frankfurt), Hesse 2029 Under Construction / Groundwork (March 2026) Part of a regional 4-GW-ready German grid strategy.
Project Lusitanus Mérida: €2.8B AI Data Center FRV Spain Mérida (Extremadura) 2029 Under Construction / Phase 1 Foundations (March 2026) 1,000 MW (1 GW) Target
Nostrum Evergreen Badajoz: €1.9B 500MW AI Data Center Spain Badajoz 2029 (for 500MW) Permitting / Pre-Construction (March 2026) 500 MW
Microsoft Italy Project Raven | Next-Gen 800MW AI & Data Center Platform Lombardy and Lazio, Milan 2027 Operational / Rapid Scaling Phase (March 2026) 800 MW
Newport Wales Data Centre | Microsoft £2.5B AI-Ready Hyperscale Campus (200MW) Newport, Wales 2028 Under Construction / Fit-out (March 2026) 200 MW
Google Netherlands Winschoten | High-Performance AI & Hyperscale Cloud Hub Winschoten (Municipality of Oldambt), Groningen 2026 (Active Scaling) Operational (Opened November 18, 2025) ~200 MW (Phase 1)
Lappeenranta AI Factory | Nebius 310MW Hyperscale Liquid-Cooling Infrastructure Lappeenranta 2028 Announced / Pre-Construction (March 31, 2026) 310 MW
Stargate Norway Narvik | $1B 520MW AI Gigafactory Narvik (Kvandal), Nordland 2028 Under Construction / Initial Phase (April 2026) 520 MW
Digital Realty FRA32 Frankfurt: 9MW AI-Ready Data Center Frankfurt am Main Operational (Ongoing high-density retrofits) Operational / High-Density Upgrade (April 2026) 9.0 MW
Google Azores Nuvem & Sol | 10MW AI-Ready Subsea Connectivity Data Center Tecnoparque da Lagoa, São Miguel, Azores Q1 2027 Under Construction (April 2026) 10 MW
Digital Realty PAR12 Paris AI & Connectivity Hub 16 Avenue Joseph Froelicher, 77600 Ferrières-en-Brie, France Operational Operational / High-Density Optimized (April 2026) 20.0 MW
Paris Digital Park | Next-Generation 130MW Hyperscale AI Compute Campus 12-14 Rue de la Gare, 93120 La Courneuve, France 2026 (Final capacity tranches) Operational / Phased Expansion (April 2026) 130.0 MW
Digital Realty Marseille MRS5 River-Cooled AI Hub Port of Marseille Fos, Marseille, France 2027 Under Construction (April 2026) 14.0 MW
London III West London Data Center | 56MW Hyperscale AI & Cloud Infrastructure Hub Digital Park, Crawley, UK 2028 Under Construction / Phased Expansion (April 2026) 56.0 MW
Prime Finland: €6B Järvenpää AI-Ready 550MW Campus Vähänummi Industrial Area, Järvenpää 2031 EIA Phase / Pre-Development (April 2026) 550 MW
Vantage BER1 Brandenburg | 56MW Hyperscale AI & Cloud Infrastructure Hub 25-Acre Campus within Brandenburg Park 2026 Operational / Active Phase 2 & 3 Expansion (April 2026) 56.0 MW
Google Kronstorf AI Data Center Business Park Kronstorf 2029 Under Construction (Groundbreaking) 150 MW IT Load
Digital Realty ROM1 Rome Rome West 2029 Under Construction (Phase 1) 120 MW Total IT Load
Pantheon AI Topusko Zagreb 2032 Announced / Permitting 500 MW IT Load
Nexus-1 | 100MW Distributed AI Cloud & High-Performance Compute Hub Distributed across Southern France 2028 (1,000 Units Worldwide) Groundbreaking / Launch Phase 100 MW (First 100 Units)
Equinix MD5 Madrid | Next-Gen AI Data Center Launching Q2 2026 in Southern Europe Madrid Metropolitan Area NA In Development / Targeted Q2 2026 Opening Multi-MW Scalable
Pangea 5 Supercomputer | €100M AI Compute & Sustainable Energy Infrastructure Hub Technical Center (CSTJF) pau 2027 Project Announced / Design Phase (May 6, 2026) Scalable High-Density (HPC Optimized)
TikTok Lahti | €1 Billion AI-Ready Expansion for European Data Sovereignty Lahti, Finland H2 2027 Phase 1 Planning / Tenant Agreement Signed (May 2026) 128.0 MW (Full Build)
Microsoft Centurion Spain: 300MW Aragon Hyperscale AI Region Centrovía Industrial Park, La Muela (Zaragoza) 2029 (Projected) Phase 1 Commissioning / Active Buildout 300 MW (Campus Total)
Maincubes BER2: 186MW AI-Ready Hyperscale Campus Berlin Luckenwalde, South of Berlin Late 2027 Under Construction (Phase 2 Groundbreaking May 2026) 186 MW Total Utility Power
Transatlantic Innovation Campus: 500MW AI Hub Croatia Dugopolje 2030 Under Construction (Announced May 2026) 500 MW Total Utility Power
Equinix AM11 International Business Exchange™ Lemelerbergweg 28, 1101 AH Amsterdam 2026 / early 2027 Operational / Continuous Interconnection Optimization (May 2026) 9.0 MW
Equinix AM5: 13MW High-Density Amsterdam South East Hub Amsterdam Continuous Expansion / 2026 AI Infrastructure Upgrades Live / Operational (Active AI-Ready Upgrades) 13 MW Total Utility Supply
CyrusOne MIL1: 27MW Eco-Sovereign Data Center Milan Via delle Regioni, Segrate, Lombardy Late 2028 Under Construction (Groundbreaking March 25, 2026) 35 MW Total Utility Connection
CyrusOne AMS1: 54MW Hyperscale Amsterdam-Gateway Campus Linieweg 1, 1165 AA Halfweg (Haarlemmerliede) Ongoing / 2025-2026 Live / Operational (Active AI-Density Modernization) 54 MW IT Load (27 MW Dedicated per Building)
NTT Amsterdam 1: 40MW High-Density Network Gateway Aviolanda 1, 1437 Rozenburg 2025–2026 Live / Operational (Active AI-Density Modernization) 40 MW Total White Space Capacity
Equinix PA10: 15MW Highly Connected Eco-Hub Paris 114 Rue Ambroise Croizat, 93200 Saint-Denis 2025–2026 Live / Operational (Active AI Liquid-Cooling Upgrades) 15 MW Total Utility Connection
Digital Realty BCN1: 14MW Mediterranean Interconnection Gateway Sant Adrià de Besòs Innovation Area, Barcelona, Catalonia May 18, 2026 Live / Operational (Launched May 18, 2026) 14 MW Planned IT White Space Load
Project Monet: €2.2B High-Density Hyperscale AI Campus Île-de-France Corridor Late 2027 Approved / Pre-Construction Planning (Siting Finalized May 2026) 360 MW Maximum Allocated Site Power Envelope
Yondr London Slough Building 3: 40MW Hyperscale Data Center Slough SL2 5EJ, United Kingdom May 2026 (Complete 3-Building Campus Operational) Operational / Ready for Service (Achieved May 7, 2026) 100 MW+ Ultimate Combined Campus Substation Grid Allocation
Vantage Cardiff CWL12 The Celtic Way Glasgow, UK Estimated 2031 Planned / Site Infrastructure Under Development 120 MW maximum expansion capacity
Mistral AI EcoDataCenter 150MW Sustainable Sweden AI Campus Falun, Sweden Estimated 2029 Under Construction 150 MW maximum allocated grid capacity
Málaga Digital Gateway 45MW Tier III Andalusian Data Center Andalucía Tech Park District, Spain Estimated 2030 Planning & Site Acquisition Approved 45 MW gross facility footprint capacity
EdgeConneX Italy Hyperscale Expansion Milan Technology Hub, Italy Comprehensive portfolio development and final phase completions scheduled to scale through 2031 Active Development Phase 300 MW cumulative gross utility power allocation across three core deployment sites
Ark Data Centers Barcelona Project Montjuic 45 MW Investment La Maquinista, Barcelona, Spain Sequential multi-floor modular expansion phases projected to reach full capacity by 2031 Active Engineering & Permitting Phase 45 MW gross electrical capacity delivered via independent high-voltage utility lines
Equinix xScale Paris Hyperscale Data Center Expansion (23MW) 114 Rue Ambroise Croizat, 93200 Saint-Denis February 2025 (PA13x fully operational and pre-leased) Operational 23 MW total across primary xScale modules (expandable via future phases)
Frankfurt Central IV Hyperscale Data Center 186MW Campus Frankfurt, EU Q4 2028 Under Construction 186 MW Net IT Capacity
Civicos Networking: Roubaix Cloud Node 1 Rue Kellermann, 59100 Roubaix, France Seamlessly integrated into a multi-facility cluster including sister nodes in Tenerife, Lanzarote, and Madrid Active / Operational Cloud Services Node Up to 1.6 MW total localized operational power threshold, with densities scaling from 1.2 kW up to 10 kW per rack depending on hardware layout
EXA Mareuil sur Ay Mareuil-sur-Ay (Marne) Continuous "build-to-suit" internal data hall adaptations executing based on carrier and enterprise interconnect requirements Active / Fully Operational Core Network & Colocation Node Scalable multi-megawatt allocation providing high-reliability power feeds to partial, full, and multi-cabinet cage deployments
Digital Realty Paris 13: PAR13 Hyperscale 14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France Continuous internal space optimizations and dense cooling retrofits tracking completely active through June 2026 Active / Operational 15 MW gross utility transformer capacity supporting high-density configurations
SoftBank Dunkirk AI Campus: 3.1GW Sovereign Mega-Hub Port of Dunkirk (Loon-Plage), Hauts-de-France Region, France Sequential regional campus completions across Dunkirk, Bosquel, and Bouchain tracking for full delivery by 2031 Active / Pre-Construction & Fast-Track Planning Phase (Announced June 2026) 3,100 MW regional allocation delivered via dedicated on-site 400 kV extra-high-voltage substations
Yondr Frankfurt FRA02: 40MW Hyperscale Bischofsheim Node Industrial Zone Am Schindberg, 65474 Bischofsheim, Hesse, Germany Continuous modular server hall fit-outs pacing sequentially across the multi-story footprint through 2029 Active / Under Heavy Structural Construction (Tracking June 2026) 40 MW gross utility line allocation feeding high-density rows scaling past 25 kW per rack
NTT London LON3: 24MW High-Density Dagenham AI Campus Yew Tree Ave, Dagenham RM10 7FZ, United Kingdom Continuous modular data hall expansion scaling sequentially across the campus footprint through 2029 Active / Under Heavy Structural Construction (Tracking June 2026) 24 MW gross utility capacity delivered via fully redundant, dedicated on-site transformer blocks
Data4 Escaudain: €5B 700MW Hyperscale Campus in France Former Parc des Soufflantes Industrial Redevelopment Site, Escaudain, Northern France 2032 - Q4 Active / Master Planning & Environmental Site Permitting Phase (Tracking June 2026) 700 MW gross ultimate site power allocation engineered to sustain high-density AI server clusters and next-generation compute configurations
Equinix MD6 Madrid 3.5MW Colocation Campus Calle de la Pedriza, 12, 28108 Alcobendas, Madrid, Spain Q2 2027 (Final BME Matching Engine Migration) Operational 3.5 MW Marketed Power
Milan CyrusOne MIL2 54MW Hyperscale Data Center Via Raffaele Rubattino no. 90, 20134, Milan, Italy Q4 2028 Under Development / Planning 90 MVA Dual Active High-Voltage Supply Allocation
London Kao Data KL03 40MW AI-Ready Data Center Park Royal, West London, UK Q4 2029 Under Development / Planning 40 MW Dedicated Critical Power Allocation
Digital Reef Havering 600MW AI Tech Campus London 499-Acre Fen Lane & North Ockendon Site, Havering Green Belt Corridor, East London Incremental 12-building campus expansions rolling out sequentially across a 5-to-10-year horizon Under Construction 200MW Phase 1 configuration (scalable up to 600MW full site allocation)
Google Horndal: New 150MW Air-Cooled Sweden Data Center Greenfield industrial zone, Horndal, Avesta Municipality, Dalarna County, Sweden Projected 2030 Groundbreaking Achieved / Active Civil Construction (June 2, 2026) 150.0 MW Phase 1 Baseline Capacity
Bucharest ClusterPower 800MW Off-Grid AI Infrastructure Factory Strada Viitorului nr.2, 207405 Mlecănești, Romania Q2 2030 Under Construction (Phase 1 Fast-Track) 800 MW
Cambois Northumberland 720MW Massive Hyperscale Campus Northumberland , england Q4 2031 Under Construction (Enabling Works / Phase 1) 720 MW
Solleftea atNorth 300MW High-Density Nordic AI Campus SWE04 Industrial Zone, Solleftea, Sweden Q4 2029 Under Construction (Phase 1 Framing) 300 MW
Paris Verne 500MW Sovereign AI High Performance Campus 36-43 Great Sutton St, London EC1V 0AB, United Kingdom Q4 2030 Under Construction (Phase 1 Groundwork) 500 MW
Project Boreas: 800MW Nordic Hyperscale Campus Northern Sweden (Nordic Region) 2031 Groundbroken / Under Construction 800 MW dedicated capacity
Granada: €3B Alto Infrastructure SP01 AI & HPC Campus Spain Escúzar, Granada (Andalusia) 2029 Groundbreaking Initiated 70 MW total master-planned power footprint (50 MW dedicated IT load)
Philippsburg: 707MW Project Engrida Hyperscale Data Center Campus Germany Former Goodyear Tire Factory & Decommissioned Philippsburg Nuclear Power Plant (KKP Site) 2032+ Pre-Construction / Municipal Council Preliminary Approval Received 707 MW total grid capacity allocation (Supporting an estimated ~550 MW of continuous critical IT infrastructure)