Portugal’s Start Campus Launches SIN01, Advancing a 1.2GW Gigascale Vision |
Sines, Portugal (Atlantic Coast) |
2030+ |
Operational (First Building, SIN01) |
1.2 GW (Secured Total Grid Capacity) |
|
|
AWS European Cloud Region for Data Sovereignty |
Germany |
Initial launch by late 2026; full investment deployed by 2029 |
Confirmed / Under Construction |
Significant capacity as part of the total €7.8B investment in the region |
|
|
Start Campus SINES01 | Next-Generation Data Center Campus in Sines, Portugal |
ZILS (Sines Industrial and Logistics Zone), Sines, Portugal |
2028 - 2030 |
Under Construction / Phase 1 Operational |
1.2 GW |
|
|
WBS Power / Prime Capital Hyperscale Campus | Co-Located Project Jupiter AI Hub |
Former military airfield, Brandenburg, Germany |
Phased development |
Pre-Construction/Planning (Targeting 2026/2027 Start) |
500 MW |
|
|
DUB20 Hyperscale Campus |
Arklow, County Wicklow, Ireland (Greater Dublin Area) |
Target 2028-2030 |
Under Construction (Initial Phase Piling & Shell) |
90 MW |
|
|
Apto Data Center Campus in Lacchiarella |
Lacchiarella (Milan Metropolitan Area), Italy |
N/A |
Announced / Early Development Phase |
300 MW |
|
|
Global Switch London East GS2 | High-Density Colocation & Infrastructure Expansion |
London Docklands (East India Dock), United Kingdom |
Expected completion in the late 2020s. |
Upgrade/Reconfiguration - Underway |
74 MW |
|
|
Madrid Sur Campus by Echelon Iberdrola Digital Infra |
Madrid Sur Area, Spain (South of Madrid) |
N/A (Potential for 700 MW+ across the JV's secured portfolio) |
Planning / Pre-Construction (Secured Power Connection) |
230 MW |
|
|
Microsoft DUB14 Dublin Data Center | Next-Gen Hyperscale Compute Campus in Ireland |
Grange Castle Business Park, Clondalkin, Dublin, Ireland |
Projected over 5-7 years |
Under Construction / Phased Buildout |
240 MW |
|
|
CyrusOne FRA7 Frankfurt Westside Campus |
Griesheim (West of Frankfurt), Germany |
Expected completion in phases over several years. |
Under Construction |
126 MW |
|
|
SINES 4.0 | Next-Generation Data Center Campus in Sines, Portugal |
Sines, Portugal (ZILS - Sines Industrial and Logistics Area) |
Estimated by 2030-2035 (phased) |
Under Construction/Ongoing Phased Development |
Up to 1.2 GW |
|
|
Brookfield AI Data Center Campus Development |
Strängnäs (Stockholm Metro Area), Sweden |
Est. 2035 – 2040 (10-15 year construction timeline) |
Announced / Long-term Development |
Initial planned expansion from 300 MW to 750 MW |
|
|
VIRTUS Wustermark Megacampus | Next-Generation Colocation & Digital Infrastructure Campus |
Wustermark (30 km west of Berlin), Germany |
Est. 2028-2030 |
Under Construction / Phased Development |
Up to 300 MW (Across 9 data center buildings) |
|
|
Microsoft Middenmeer Campus | High-Performance AI & Cloud Infrastructure Expansion (AMS13/14) |
Middenmeer, Hollands Kroon (North Holland), Netherlands |
Long-term development |
Announced / Under Phased Construction |
Significant multi-MW capacity added over 50 hectares of new land |
|
|
Fossefall Data Center | AI Factory for Scalable Cloud & GPU Workloads |
Fyresdal, Vestfold and Telemark County, Norway |
Phased towards 500 MW goal by 2030 across the Nordic region. |
Announced / Acquisition Complete (Late 2025) Commissioning Commissioning Phased conversion, initial AI capacity launch expected H |
Initial 5.5 MW (Existing reserved capacity) |
|
|
Google Data Center Expansion, Saint-Ghislain Campus |
Saint-Ghislain, Hainaut Province, Belgium |
Continuous phased expansion over the next decade. |
Announced / Active Expansion (Investment committed late 2025) |
Significant increase from current load; scaled to support multi-phase gigawatt-scale AI requirements. |
|
|
Amsterdam Hyperscale Campus |
Greater Amsterdam Region, Netherlands |
To be determined (Likely multi-year development) |
Announced / Pre-Construction (Lease Secured) |
Up to €1 Billion in construction investment; Hyperscale scale, multi-megawatt IT load. |
|
|
Frankfurt Hyperscale Campus Colt DCS 4 & 5 |
Rhine-Main Region, Frankfurt, Germany |
TBC |
Announced / Land Secured & Power Contracts Signed |
63 MW (Total IT Load) |
|
|
Vantage CWL1 Cardiff | Next-Generation Colocation & Digital Infrastructure Campus |
Celtic Way, Newport, South Wales, UK |
Estimated completion of all three buildings by 2026-2027 |
Partially Operational / Expanding |
148MW+ (Upgradeable) |
|
|
Equinix Lelystad AI Data Center (AMS10) |
Flevokust Haven, Lelystad, Netherlands |
2030 |
Planning / Pre-Construction |
150 MW Dedicated Site Power |
|
|
QuantumBasel Tempo Hub | IonQ Quantum Computing & Data Science Platform |
uptownBasel Campus, Arlesheim/Basel, Switzerland |
2029 |
Active Expansion / Technology Integration |
Scalable Hub (Quantum systems are high-efficiency) |
|
|
Goodman GEDCDP | European Data Centre Development & Investment Partnership |
Frankfurt (Germany), Amsterdam (Netherlands), Paris (France) |
2030 |
Announced / Pre-construction |
435 MW Total Portfolio |
|
|
AMS11 Amsterdam Data Tower Campus by Digital Realty |
Science Park, Amsterdam, Netherlands |
Q3 2026 |
Live / Operational |
27 MW IT Capacity |
|
|
Sesterce "Rhône-Alps" AI Mega-Campus |
Lyon-Valence Logistics Hub, Auvergne-Rhône-Alpes |
2032 |
Latest Launch (Active Execution Phase - Jan 2026) |
1 GW (Initial Execution) |
|
|
Hertfordshire Campus Equinix DC01UK |
Hertfordshire, UK |
2029 |
Under Development / Construction Phase |
250 MW IT Load |
|
|
Villasequilla AI Campus | High-Performance AI Compute & Connectivity Facility |
Villasequilla, Spain |
2029 |
Approved / Ready-to-Build (RTB) |
600 MW IT Load |
|
|
Digital Realty FRA18: 16MW AI-Ready Heritage Facility |
Frankfurt |
Estimated late 2027 |
Phase 1 Live (Operational) |
16 MW Total |
|
|
DayOne Nurmijärvi: 300MW Renewable AI Campus |
Nurmijärvi, Finland |
2030 |
Phase 1 Groundbreaking / Early Construction |
300 MW (Total Campus Buildout) |
|
|
Mediterra Barcelona: 12MW AI-Ready Edge-Hyperscale Hub |
Strategic site in Catalonia, near Barcelona |
2029 |
Launched / Site Acquired (Feb 20, 2026) |
Secured 12 MW |
|
|
Osae-NFU 250MW AI Data Center Bordeaux France |
Former Industrial Site, Bordeaux Metropole |
2029 |
Groundbreaking (Today) |
250 MW IT Load |
|
|
Digital Realty FRA20: 16MW AI-Ready Hyper-Scale Frankfurt |
Digital Park Fechenheim, Frankfurt |
Estimated 2028–2029 (Total Campus) |
Under Construction (Phase 1 Groundbreaking) |
16 MW (IT Load) |
|
|
Google Skien Norway: 240MW Hyperscale AI-Ready Data Center |
Skådalsvegen, Skien, Telemark, Norway |
2030 (Planned 840 MW) |
Live / Commissioning |
240 MW |
|
|
atNorth SWE04 Sollefteå AI Campus (300 MW) |
Sollefteå (Långsele) |
2031 |
Announced (Feb 24, 2026) |
300 MW Total Utility Capacity |
|
|
AWS Aragon Expansion: 33.7B Euro AI & Cloud Infrastructure |
Zaragoza, Multi-site: Zaragoza, Huesca, and Teruel (Aragon Region) |
2030 |
Announced / Under Expansion |
Total regional capacity projected at 1 GW+ by full buildout |
|
|
DT-NVIDIA AI Factory Munich: €1B 10,000 Blackwell GPU Hub |
Munich (Refurbished Industrial Site) |
2028 |
Go-Live: March 4, 2026 |
10,000 NVIDIA Blackwell GPUs (Initial phase) |
|
|
Google Waltham Cross: $1B AI Data Centre Hertfordshire UK |
, Waltham Cross, Hertfordshire |
2026 |
Operational (Inaugurated Sept 2025) |
Estimated 100 MW Utility Feed |
|
|
Google Dietzenbach: €5.5B AI Data Center & Heat Recovery Germany |
Dietzenbach (near Frankfurt), Hesse |
2029 |
Under Construction / Groundwork (March 2026) |
Part of a regional 4-GW-ready German grid strategy. |
|
|
Project Lusitanus Mérida: €2.8B AI Data Center FRV Spain |
Mérida (Extremadura) |
2029 |
Under Construction / Phase 1 Foundations (March 2026) |
1,000 MW (1 GW) Target |
|
|
Nostrum Evergreen Badajoz: €1.9B 500MW AI Data Center Spain |
Badajoz |
2029 (for 500MW) |
Permitting / Pre-Construction (March 2026) |
500 MW |
|
|
Microsoft Italy Project Raven | Next-Gen 800MW AI & Data Center Platform |
Lombardy and Lazio, Milan |
2027 |
Operational / Rapid Scaling Phase (March 2026) |
800 MW |
|
|
Newport Wales Data Centre | Microsoft £2.5B AI-Ready Hyperscale Campus (200MW) |
Newport, Wales |
2028 |
Under Construction / Fit-out (March 2026) |
200 MW |
|
|
Google Netherlands Winschoten | High-Performance AI & Hyperscale Cloud Hub |
Winschoten (Municipality of Oldambt), Groningen |
2026 (Active Scaling) |
Operational (Opened November 18, 2025) |
~200 MW (Phase 1) |
|
|
Lappeenranta AI Factory | Nebius 310MW Hyperscale Liquid-Cooling Infrastructure |
Lappeenranta |
2028 |
Announced / Pre-Construction (March 31, 2026) |
310 MW |
|
|
Nascale Norway Narvik | $1B 520MW AI Gigafactory |
Narvik (Kvandal), Nordland |
2028 |
Under Construction / Initial Phase (April 2026) |
520 MW |
|
|
Digital Realty FRA32 Frankfurt: 9MW AI-Ready Data Center |
Frankfurt am Main |
Operational (Ongoing high-density retrofits) |
Operational / High-Density Upgrade (April 2026) |
9.0 MW |
|
|
Google Azores Nuvem & Sol | 10MW AI-Ready Subsea Connectivity Data Center |
Tecnoparque da Lagoa, São Miguel, Azores |
Q1 2027 |
Under Construction (April 2026) |
10 MW |
|
|
Digital Realty PAR12 Paris AI & Connectivity Hub |
16 Avenue Joseph Froelicher, 77600 Ferrières-en-Brie, France |
Operational |
Operational / High-Density Optimized (April 2026) |
20.0 MW |
|
|
Paris Digital Park | Next-Generation 130MW Hyperscale AI Compute Campus |
12-14 Rue de la Gare, 93120 La Courneuve, France |
2026 (Final capacity tranches) |
Operational / Phased Expansion (April 2026) |
130.0 MW |
|
|
Digital Realty Marseille MRS5 River-Cooled AI Hub |
Port of Marseille Fos, Marseille, France |
2027 |
Under Construction (April 2026) |
14.0 MW |
|
|
London III West London Data Center | 56MW Hyperscale AI & Cloud Infrastructure Hub |
Digital Park, Crawley, UK |
2028 |
Under Construction / Phased Expansion (April 2026) |
56.0 MW |
|
|
Prime Finland: €6B Järvenpää AI-Ready 550MW Campus |
Vähänummi Industrial Area, Järvenpää |
2031 |
EIA Phase / Pre-Development (April 2026) |
550 MW |
|
|
Vantage BER1 Brandenburg | 56MW Hyperscale AI & Cloud Infrastructure Hub |
25-Acre Campus within Brandenburg Park |
2026 |
Operational / Active Phase 2 & 3 Expansion (April 2026) |
56.0 MW |
|
|
Google Kronstorf AI Data Center |
Business Park Kronstorf |
2029 |
Under Construction (Groundbreaking) |
150 MW IT Load |
|
|
Digital Realty ROM1 Rome |
Rome West |
2029 |
Under Construction (Phase 1) |
120 MW Total IT Load |
|
|
Pantheon AI Topusko |
Zagreb |
2032 |
Announced / Permitting |
500 MW IT Load |
|
|
Nexus-1 | 100MW Distributed AI Cloud & High-Performance Compute Hub |
Distributed across Southern France |
2028 (1,000 Units Worldwide) |
Groundbreaking / Launch Phase |
100 MW (First 100 Units) |
|
|
Equinix MD5 Madrid | Next-Gen AI Data Center Launching Q2 2026 in Southern Europe |
Madrid Metropolitan Area |
NA |
In Development / Targeted Q2 2026 Opening |
Multi-MW Scalable |
|
|
Pangea 5 Supercomputer | €100M AI Compute & Sustainable Energy Infrastructure Hub |
Technical Center (CSTJF) pau |
2027 |
Project Announced / Design Phase (May 6, 2026) |
Scalable High-Density (HPC Optimized) |
|
|
TikTok Lahti | €1 Billion AI-Ready Expansion for European Data Sovereignty |
Lahti, Finland |
H2 2027 |
Phase 1 Planning / Tenant Agreement Signed (May 2026) |
128.0 MW (Full Build) |
|
|
Microsoft Centurion Spain: 300MW Aragon Hyperscale AI Region |
Centrovía Industrial Park, La Muela (Zaragoza) |
2029 (Projected) |
Phase 1 Commissioning / Active Buildout |
300 MW (Campus Total) |
|
|
Maincubes BER2: 186MW AI-Ready Hyperscale Campus Berlin |
Luckenwalde, South of Berlin |
Late 2027 |
Under Construction (Phase 2 Groundbreaking May 2026) |
186 MW Total Utility Power |
|
|
Transatlantic Innovation Campus: 500MW AI Hub Croatia |
Dugopolje |
2030 |
Under Construction (Announced May 2026) |
500 MW Total Utility Power |
|
|
Equinix AM11 International Business Exchange™ |
Lemelerbergweg 28, 1101 AH Amsterdam |
2026 / early 2027 |
Operational / Continuous Interconnection Optimization (May 2026) |
9.0 MW |
|
|
Equinix AM5: 13MW High-Density Amsterdam South East Hub |
Amsterdam |
Continuous Expansion / 2026 AI Infrastructure Upgrades |
Live / Operational (Active AI-Ready Upgrades) |
13 MW Total Utility Supply |
|
|
CyrusOne MIL1: 27MW Eco-Sovereign Data Center Milan |
Via delle Regioni, Segrate, Lombardy |
Late 2028 |
Under Construction (Groundbreaking March 25, 2026) |
35 MW Total Utility Connection |
|
|
CyrusOne AMS1: 54MW Hyperscale Amsterdam-Gateway Campus |
Linieweg 1, 1165 AA Halfweg (Haarlemmerliede) |
Ongoing / 2025-2026 |
Live / Operational (Active AI-Density Modernization) |
54 MW IT Load (27 MW Dedicated per Building) |
|
|
NTT Amsterdam 1: 40MW High-Density Network Gateway |
Aviolanda 1, 1437 Rozenburg |
2025–2026 |
Live / Operational (Active AI-Density Modernization) |
40 MW Total White Space Capacity |
|
|
Equinix PA10: 15MW Highly Connected Eco-Hub Paris |
114 Rue Ambroise Croizat, 93200 Saint-Denis |
2025–2026 |
Live / Operational (Active AI Liquid-Cooling Upgrades) |
15 MW Total Utility Connection |
|
|
Digital Realty BCN1: 14MW Mediterranean Interconnection Gateway |
Sant Adrià de Besòs Innovation Area, Barcelona, Catalonia |
May 18, 2026 |
Live / Operational (Launched May 18, 2026) |
14 MW Planned IT White Space Load |
|
|
Project Monet: €2.2B High-Density Hyperscale AI Campus |
Île-de-France Corridor |
Late 2027 |
Approved / Pre-Construction Planning (Siting Finalized May 2026) |
360 MW Maximum Allocated Site Power Envelope |
|
|
Yondr London Slough Building 3: 40MW Hyperscale Data Center |
Slough SL2 5EJ, United Kingdom |
May 2026 (Complete 3-Building Campus Operational) |
Operational / Ready for Service (Achieved May 7, 2026) |
100 MW+ Ultimate Combined Campus Substation Grid Allocation |
|
|
Vantage Cardiff CWL12 |
The Celtic Way Glasgow, UK |
Estimated 2031 |
Planned / Site Infrastructure Under Development |
120 MW maximum expansion capacity |
|
|
Mistral AI EcoDataCenter 150MW Sustainable Sweden AI Campus |
Falun, Sweden |
Estimated 2029 |
Under Construction |
150 MW maximum allocated grid capacity |
|
|
Málaga Digital Gateway 45MW Tier III Andalusian Data Center |
Andalucía Tech Park District, Spain |
Estimated 2030 |
Planning & Site Acquisition Approved |
45 MW gross facility footprint capacity |
|
|
EdgeConneX Italy Hyperscale Expansion |
Milan Technology Hub, Italy |
Comprehensive portfolio development and final phase completions scheduled to scale through 2031 |
Active Development Phase |
300 MW cumulative gross utility power allocation across three core deployment sites |
|
|
Ark Data Centers Barcelona Project Montjuic 45 MW Investment |
La Maquinista, Barcelona, Spain |
Sequential multi-floor modular expansion phases projected to reach full capacity by 2031 |
Active Engineering & Permitting Phase |
45 MW gross electrical capacity delivered via independent high-voltage utility lines |
|
|
Equinix xScale Paris Hyperscale Data Center Expansion (23MW) |
114 Rue Ambroise Croizat, 93200 Saint-Denis |
February 2025 (PA13x fully operational and pre-leased) |
Operational |
23 MW total across primary xScale modules (expandable via future phases) |
|
|
Frankfurt Central IV Hyperscale Data Center 186MW Campus |
Frankfurt, EU |
Q4 2028 |
Under Construction |
186 MW Net IT Capacity |
|
|
Civicos Networking: Roubaix Cloud Node |
1 Rue Kellermann, 59100 Roubaix, France |
Seamlessly integrated into a multi-facility cluster including sister nodes in Tenerife, Lanzarote, and Madrid |
Active / Operational Cloud Services Node |
Up to 1.6 MW total localized operational power threshold, with densities scaling from 1.2 kW up to 10 kW per rack depending on hardware layout |
|
|
EXA Mareuil sur Ay |
Mareuil-sur-Ay (Marne) |
Continuous "build-to-suit" internal data hall adaptations executing based on carrier and enterprise interconnect requirements |
Active / Fully Operational Core Network & Colocation Node |
Scalable multi-megawatt allocation providing high-reliability power feeds to partial, full, and multi-cabinet cage deployments |
|
|
Digital Realty Paris 13: PAR13 Hyperscale |
14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France |
Continuous internal space optimizations and dense cooling retrofits tracking completely active through June 2026 |
Active / Operational |
15 MW gross utility transformer capacity supporting high-density configurations |
|
|
SoftBank Dunkirk AI Campus: 3.1GW Sovereign Mega-Hub |
Port of Dunkirk (Loon-Plage), Hauts-de-France Region, France |
Sequential regional campus completions across Dunkirk, Bosquel, and Bouchain tracking for full delivery by 2031 |
Active / Pre-Construction & Fast-Track Planning Phase (Announced June 2026) |
3,100 MW regional allocation delivered via dedicated on-site 400 kV extra-high-voltage substations |
|
|
Yondr Frankfurt FRA02: 40MW Hyperscale Bischofsheim Node |
Industrial Zone Am Schindberg, 65474 Bischofsheim, Hesse, Germany |
Continuous modular server hall fit-outs pacing sequentially across the multi-story footprint through 2029 |
Active / Under Heavy Structural Construction (Tracking June 2026) |
40 MW gross utility line allocation feeding high-density rows scaling past 25 kW per rack |
|
|
NTT London LON3: 24MW High-Density Dagenham AI Campus |
Yew Tree Ave, Dagenham RM10 7FZ, United Kingdom |
Continuous modular data hall expansion scaling sequentially across the campus footprint through 2029 |
Active / Under Heavy Structural Construction (Tracking June 2026) |
24 MW gross utility capacity delivered via fully redundant, dedicated on-site transformer blocks |
|
|
Data4 Escaudain: €5B 700MW Hyperscale Campus in France |
Former Parc des Soufflantes Industrial Redevelopment Site, Escaudain, Northern France |
2032 - Q4 |
Active / Master Planning & Environmental Site Permitting Phase (Tracking June 2026) |
700 MW gross ultimate site power allocation engineered to sustain high-density AI server clusters and next-generation compute configurations |
|
|
Equinix MD6 Madrid 3.5MW Colocation Campus |
Calle de la Pedriza, 12, 28108 Alcobendas, Madrid, Spain |
Q2 2027 (Final BME Matching Engine Migration) |
Operational |
3.5 MW Marketed Power |
|
|
Milan CyrusOne MIL2 54MW Hyperscale Data Center |
Via Raffaele Rubattino no. 90, 20134, Milan, Italy |
Q4 2028 |
Under Development / Planning |
90 MVA Dual Active High-Voltage Supply Allocation |
|
|
London Kao Data KL03 40MW AI-Ready Data Center |
Park Royal, West London, UK |
Q4 2029 |
Under Development / Planning |
40 MW Dedicated Critical Power Allocation |
|
|
Digital Reef Havering 600MW AI Tech Campus London |
499-Acre Fen Lane & North Ockendon Site, Havering Green Belt Corridor, East London |
Incremental 12-building campus expansions rolling out sequentially across a 5-to-10-year horizon |
Under Construction |
200MW Phase 1 configuration (scalable up to 600MW full site allocation) |
|
|
Google Horndal: New 150MW Air-Cooled Sweden Data Center |
Greenfield industrial zone, Horndal, Avesta Municipality, Dalarna County, Sweden |
Projected 2030 |
Groundbreaking Achieved / Active Civil Construction (June 2, 2026) |
150.0 MW Phase 1 Baseline Capacity |
|
|
Bucharest ClusterPower 800MW Off-Grid AI Infrastructure Factory |
Strada Viitorului nr.2, 207405 Mlecănești, Romania |
Q2 2030 |
Under Construction (Phase 1 Fast-Track) |
800 MW |
|
|
Cambois Northumberland 720MW Massive Hyperscale Campus |
Northumberland , england |
Q4 2031 |
Under Construction (Enabling Works / Phase 1) |
720 MW |
|
|
Solleftea atNorth 300MW High-Density Nordic AI Campus |
SWE04 Industrial Zone, Solleftea, Sweden |
Q4 2029 |
Under Construction (Phase 1 Framing) |
300 MW |
|
|
Paris Verne 500MW Sovereign AI High Performance Campus |
36-43 Great Sutton St, London EC1V 0AB, United Kingdom |
Q4 2030 |
Under Construction (Phase 1 Groundwork) |
500 MW |
|
|
Project Boreas: 800MW Nordic Hyperscale Campus |
Northern Sweden (Nordic Region) |
2031 |
Groundbroken / Under Construction |
800 MW dedicated capacity |
|
|
Granada: €3B Alto Infrastructure SP01 AI & HPC Campus Spain |
Escúzar, Granada (Andalusia) |
2029 |
Groundbreaking Initiated |
70 MW total master-planned power footprint (50 MW dedicated IT load) |
|
|
Philippsburg: 707MW Project Engrida Hyperscale Data Center Campus Germany |
Former Goodyear Tire Factory & Decommissioned Philippsburg Nuclear Power Plant (KKP Site) |
2032+ |
Pre-Construction / Municipal Council Preliminary Approval Received |
707 MW total grid capacity allocation (Supporting an estimated ~550 MW of continuous critical IT infrastructure) |
|
|
Vantage Frankfurt II FRA21 56MW AI Megacampus |
Alexander-von-Humboldt-Straße, 65479 Raunheim, Germany |
Mid-2026 |
Fully Operational / Undergoing Active High-Density Upgrades |
100 MVA Dedicated On-Site Substation via Westnetz |
|
|
Microsoft Azure NRW Germany 300MW AI Megacampus |
Rheinisches Revier Industrial Zone, NRW, Germany |
H2 2027 |
Fully Operational / Newly Launched |
300 MW Dedicated High-Voltage Transmission Substation Connection |
|
|
Digital Realty Lelystad Hyperscale Data Center Campus |
Flevokust Haven Industrial Estate, Lelystad, Netherlands |
Q4 2029 |
Planning / Pre-construction |
150 MW Total Substation Allocation |
|
|
Black Sea AI Gigafactory Campus (500MW Capacity) |
Constanța Logistics Zone, Black Sea Coast, Romania |
Q4 2031 |
Approved / Pre-construction |
500 MW total utility power allocation |
|
|
Google Farciennes AI-Ready Data Center Campus |
Rue de la Neuville 21, 6240 Farciennes, Belgium |
Q4 2029 |
Under Construction |
300 MW total utility power allocation |
|
|
Hscale MXP2 Hyperscale Milan Campus |
Milan Industrial District, Italy |
Q2 2030 |
Under Construction / Development |
120 MW total allocated utility power |
|
|
G2S Bourges Data Center: Tier III Groupama Core Facility |
Rue Denys Dodard, 18000 Bourges, France |
Q2 2015 (Complete operational stabilization) |
Fully Operational |
5 MW total allocated utility grid connection |
|
|
EXA Edge DC Poitiers: High-Availability French Node |
Zone d’Aménagement Concerté de Saint-Eloi, 86021 Poitiers, France |
Q4 2021 (Acquisition and asset integration under the EXA Infrastructure brand) |
Fully Operational |
2.0 MW total dedicated operational utility power |
|
|
SoftBank Northern France AI HyperCampus: 3.1GW Mega Hub |
Port of Dunkirk Western Harbour Zone, Loon-Plage, Hauts-de-France, France |
Q4 2033 (Realization of adjacent advanced electronics and containment assembly facilities) |
Pre-construction / Site Engineering (Announced May 2026) |
1.0 Gigawatt (GW) initial active site substation capability |
|
|
Vantage Dublin DUB1 Campus: 52MW Hyperscale Data Hub |
Profile Park, Clondalkin, Dublin 22, Ireland |
H2 2028 (Final system integration and handover of the second facility block) |
Active Construction Phase |
52 MW dedicated server-ready power deployment |
|
|
Pure DC Amsterdam Westpoort Hyperscale Campus (78 MW) |
Donauweg 12, Westpoort, Amsterdam |
2027 (All 3 towers operational) |
Under Construction |
78 MW Total Site Capacity |
|
|
STT Frankfurt 1 Hyperscale Data Centre Campus (96 MW) |
Business Park, Hanauer Landstraße, Frankfurt am Main |
Late 2028 |
Under Construction |
96 MW Total Scalable Substation Capacity |
|
|
QTS Northumberland: 720MW UK Hyperscale AI Campus |
133-acre (540,000 sqm) former Britishvolt site, Cambois, Northumberland NE24, UK |
2035 (Phased completion across all 10 planned buildings) |
Under Construction (Enabling Works & Site Remediation Active) |
720 MW total allocated utility grid capacity |
|
|
Digital Realty Paris Digital Park Campus (PAR8–PAR11) |
2 Avenue Marcel Cachin, 93120 La Courneuve, Seine-Saint-Denis, France |
Q4 2025 (PAR11 Handover completing full 76 MW campus) |
Operational (PAR8, PAR9, PAR10 Live) / Final Phase Delivery (PAR11) |
85 MW gross utility capacity / 76 MW critical IT load |
|
|
Vantage FRA1 Frankfurt: 56MW German Hyperscale Data Center Campus |
Goethering 27, 63067 Offenbach am Main, Hesse, Germany |
2026–2027 (Completion across all 3 campus buildings) |
Operational / Active Campus Expansion |
56 MW total critical IT capacity |
|
|
Digital Realty FRA11 Frankfurt: 9MW Digital Park Ostend Hub |
Weismüllerstraße 40, 60314 Frankfurt am Main, Germany |
Operational |
Operational |
9.0 MW total critical IT capacity |
|
|
Digital Realty London Docklands: 30MW Financial Interconnection Hub |
1 Muirfield Crescent (Cloud House) & 227 Marsh Wall (Sovereign House), London E14, UK |
Operational |
Operational |
30.0 MW total critical IT load across campus facilities |
|
|
Digital Realty London LHR20 Data Center (Sovereign House) |
227 Marsh Wall, London E14 9SD, United Kingdom |
Operational |
Operational |
4.8 MW – 8.0 MW critical IT load |
|
|
Ada Infrastructure London Docklands: 210MW AI Data Campus |
St. Vincent Ferrer Lane, Silvertown, London E16 2AP, United Kingdom |
Active multi-phase development (Phase 1 delivery 2027) |
Under Construction (Broke ground March 2026) |
210.0 MW total critical IT load (3 x 70 MW buildings) |
|
|
Pure DC Brent Cross LON01 Expansion (LON01B2) |
Harp View, 12 Priestley Way, Brent Cross, London NW2 7AL, United Kingdom |
Q2 2029 (LON01B2 completion / 90 MW campus target) |
Under Construction (Active live campus expansion; West Cold Shell phase awarded) |
90.0 MW campus total IT load (70 MW added via LON01B2) |
|
|
Pure DC Seinäjoki: 550MW Hyperscale Finland AI Campus |
Ämmäläntie & Törnäväntie, Pihlajaniemi, 60200 Seinäjoki, Finland |
Multi-phase 10-year development master plan (550+ MW total capacity) |
Under Construction |
550.0 MW total critical IT capacity (110 MW Phase 1 capacity fully leased) |
|
|
Equinix LD11x Expansion: London Slough Hyperscale xScale Hub |
765/767 Henley Road, Slough Trading Estate, Slough, SL1 4JW, United Kingdom |
Q4 2023 – 2025 (Full 19 MW Capacity Expansion) |
Operational / Fully Energized Phase Expansion |
~24+ MW Utility Capacity / 19 MW Critical IT Load |
|
|
Iron Mountain AMS-1 Data Center Campus Expansion |
J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-acre campus) |
Q2 2027 (+10 MW Expansion Go-Live) / 2028–2030 (Full 43.1 MW Campus Target) |
Operational / Active Multi-Phase Campus Expansion |
43.1 MW Total Utility Capacity (13.1 MW Active / +10 MW Phase 2 / +20 MW Phase 3) |
|
|
Vantage Data Centers Milan: 96MW Italian Hyperscale & AI Infrastructure Hub |
Milan, Metropolitan City of Milan, Lombardy, Italy |
2027–2029 (Full 96 MW regional multi-campus completion) |
Active Operation (MXP1) / Active Expansion Construction (MXP2) |
96 MW Critical IT Power (64 MW MXP1 + 32 MW MXP2) |
|
|
Vantage Data Centers Warsaw WAW1: 48MW CEE Hyperscale Hub |
Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw, Poland (12-acre campus) |
2025–2026 (Building 2 Full Buildout) |
Operational / Active Multi-Building Phase Expansion |
48 MW Critical IT Load (16 MW Building 1 + 32 MW Building 2)48 MW Critical IT Load (16 MW Building 1 + 32 MW Building 2) |
|
|
Digital Realty BER2 Berlin Data Center Campus |
Strategic Industrial Hub, Greater Metropolitan Berlin Area, Germany |
2027 – 2028 |
Under Development / Active Phased Buildout |
32 MW Critical IT Load (Initial Campus Capacity) |
|
|
Digital Realty MAD4 Madrid: 34MW Hyperscale Data Center |
Calle de Alfonso Gómez 4, 28037 Madrid, Spain |
Operational / Phased Expansion 2025–2027 |
Operational / Active Phased Capacity Expansion |
34 MW Critical IT Power Capacity |
|
|
Digital Realty MRS2 Marseille: Mediterranean Subsea & Interconnection Hub |
136 Chemin du Littoral, 13015 Marseille, France (Grand Port Maritime de Marseille) |
Operational / Phased Expansion 2024–2026 |
Operational / Active Multi-Phase Capacity Expansion |
12 MW Critical IT Power Capacity |
|
|
Digital Realty PAR9 Data Center (Paris Digital Park / Interxion PAR9) |
3 Avenue Marcel Cachin, 93120 La Courneuve, France (Paris Digital Park Campus) |
Operational / Continuous Phased Expansion |
Operational / Active Capacity Phasing |
19 MW Critical IT Power Capacity |
|
|
Digital Realty LON2 London: City Campus Financial Interconnection Hub |
11 Hanbury Street (Block C), London E1 6QR, United Kingdom |
Operational |
Operational / Active Multi-Tenant & High-Density Density Upgrades |
16 MW Utility / Substation Power Allocation |
|
|
Digital Realty DUB12 Dublin: 10.3MW Hyperscale & Cloud Hub |
Clonshaugh Industrial Estate, Clonshaugh Crescent, Dublin 17, D17 AW86, Ireland |
Operational / Phased AI & Density Density Optimizations Active |
Operational / Active Multi-Tenant & Cloud Capacity Expansion |
10.3 MW Critical IT Power Capacity / ~12 MW Gross Utility Allocation |
|
|
Digital Realty BRU3 Brussels: Carrier-Neutral Capital Interconnection Hub |
Wezembeekstraat 2, 1930 Zaventem, Greater Brussels Metropolitan Area, Belgium |
Operational / Phased Density and Cooling Upgrades Active |
Operational / Active Multi-Tenant Modernization & Density Upgrades |
1.3 MW Critical IT Power Capacity / 11kV Substation Feed |
|
|
Iron Mountain AMS-2 Amsterdam: 10MW Hyperscale & AI Expansion |
J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-Acre Amsterdam Campus) |
2028–2030 (Full 43.1 MW campus buildout) |
Active Development / Construction Phase |
10 MW Critical IT Power Capacity (AMS-2) / 43.1 MW Total Campus Substation |
|
|
Iron Mountain FRA-2 Frankfurt: 10.6MW Hyperscale & Connectivity Hub |
Am Martinszehnten Industrial Park, 60437 Frankfurt am Main, Germany |
Operational / Active Modernization & AI High-Density Modernization |
Operational / Active Multi-Tenant Capacity Expansion & Upgrades |
10.6 MW Critical IT Power Capacity (FRA-2) / 37.6 MW Combined Campus Total |
|
|
Iron Mountain LON-2 London Slough: 27MW Hyperscale Data Center |
110 Buckingham Avenue, Slough Trading Estate, Slough SL1 4PF, United Kingdom |
Operational |
Operational / Fully Commissioned Wholesale Facility |
27 MW Critical IT Power Capacity / 32+ MW Utility Substation Feed |
|
|
Colt DCS London Hayes Campus Expansion: 160MW Hyperscale & AI Hub |
Hayes Digital Park, London Borough of Hillingdon, West London, United Kingdom |
2029–2032+ (Phased delivery across London 6, 7, and 8) |
Approved / Pre-Construction Phase (Construction Start: 2026) |
97 MW Expansion Capacity / 160 MW Total Campus Capacity |
|
|
Nabiax Alcalá Madrid Campus: 100MW Hyperscale Data Center Expansion |
Av. Punto Com, 23, 28805 Alcalá de Henares, Madrid, Spain |
2026–2029+ (Phased delivery to 100 MW) |
Operational / Active Multi-Phase Hyperscale Expansion |
22.3 MW Operational IT Power / 100 MW Total Campus Power Potential |
|
|
atNorth FIN02 Helsinki Expansion: 45MW High-Density AI & HPC Campus |
Sinimäentie 6, 02630 Espoo, Greater Helsinki Area, Finland |
Q3/Q4 2027 (Completion of 45 MW Expansion Extension) |
Active Construction Phase (5-Story Extension Underway) |
35 MW Critical IT Power Capacity / 45 MW Gross Substation Feed |
|
|
Bulk OS-IX Oslo Internet Exchange: 14MW Carrier-Neutral Data Center |
Hans Møller Gasmanns vei 9, 0594 Oslo, Norway |
Operational / Continuous AI & High-Density Modernization |
Operational / Active High-Density & AI Expansion Phase |
14.4 MW Critical IT Power Capacity |
|
|
NTT DATA FRA5 Frankfurt: 80MW Sovereign AI & Hyperscale Campus |
Greater Frankfurt Metro Corridor / Offenbach East Region, Hesse, Germany |
2027–2029+ (Phased delivery across multi-building expansion blocks) |
Active Construction & Site Development Phase |
80 MW Critical IT Power Capacity |
|
|
Vantage Data Centers WAW2 Warsaw: 48MW Hyperscale & Cloud Hub |
ul. Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw (Bielany District), Poland |
2025–2026 (Completion of Building 2 / WAW2 Expansion) |
Operational (Building 1) / Active Expansion (Building 2 / WAW2) |
48 MW Critical IT Power Capacity |
|
|
Data4 Milan Data Center Campus: 270MW AI Digital Hub |
Cornaredo (MIL01: Via Monzoro, 101-105) & Vittuone (MIL02: Via Giovanni Pascoli), Metropolitan City of Milan, Italy |
2028–2030 (Completion of all 18 Data Center Buildings across MIL01 & MIL02) |
Operational (MIL01 Phase 1–DC09) / Active Construction & Expansion (MIL01 expansion & MIL02) |
170 MW (MIL01 Campus) + 100 MW (MIL02 Campus) = 270 MW Total Capacity |
|
|
CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub |
Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area) |
2026–2027 (Building 2 & Final AI High-Density Expansion) |
Operational / Active Phased Development & Expansion |
54 MW Total Critical IT Load (27 MW per building) / 90 MVA Grid Capacity |
|
|
Colt DCS Leeds Data Centre Campus: High-Density UK Digital Hub |
Leeds Metropolitan Area, West Yorkshire, United Kingdom |
Targeted 2027–2028 |
Active Development / Planned Regional Expansion |
~20 MW – 40 MW Grid Supply Capacity |
|
|
Echelon DUB20 Arklow Data Center Campus: 100MW Hyperscale Infrastructure Hub Ireland |
Avoca River Park / Vale Road, Arklow, Co. Wicklow, Ireland |
Targeted 2026–2027+ |
Under Construction / Phased Grid Integration & Site Development |
~100 MW – 120 MW Utility Connection Capacity |
|
|
atNorth HEL1 AI Data Center Helsinki Finland: Sustainable High-Density & AI Computing Hub |
Kuortaneenkatu 3, 00510 Helsinki, Finland |
Fully Operational / Ongoing High-Density AI Expansions |
Operational / Upgraded for AI & High-Density Workloads |
~1.5 MW Utility Supply Connection |
|
|
Etix Everywhere Regional Edge Data Center Network: Sovereign French Infrastructure |
Multi-site French Regional Edge Portfolio (e.g., ETIX Paris #3: Vélizy-Villacoublay, Yvelines; ETIX Nantes #1–#3: Chantenay/Saint-Herblain) |
Continuous Expansion & New Edge Acquisitions |
Operational / Active Regional Edge Expansion |
~2.0 MW to 7.0 MW per regional facility module (~20 MW–50 MW network total) |
|
|
KevlinX BRU01 Brussels Data Center Campus: 32MW+ AI-Ready Hub |
Avenue Antoon Van Oss / Av. Antoon Van Oss, 1120 Brussels, Belgium |
2026–2027 (Phased Whitespace Expansion) |
Operational (Live as of Q1 2026) |
~32 MW Critical IT Power (~68 MW Utility Power Capacity) |
|
|
MERLIN Edged LIS2 Lisbon Data Center Campus: 180MW Waterless AI Hub |
Plataforma Logística Lisboa Norte, Freguesia de Castanheira do Ribatejo, Vila Franca de Xira, 111405, Portugal |
2027–2029+ (Phased 5-Facility Expansion) |
Under Construction / Active Phase 1 Buildout |
180 MW Critical IT Power (Expandable to 300 MW) |
|
|
Digital Realty CPH1 Copenhagen Data Center: Ballerup Interconnection Hub |
Industriparken 20A–20C, DK-2750 Ballerup, Copenhagen, Denmark |
Operational Active Campus |
Operational |
~4.2 MW Total Utility Supply Allocation |
|
|
Beyond.pl WRO1 Wrocław Data Center Campus: 150MW AI-Ready Hub |
Strategic Industrial & Tech Corridor, Wrocław, Lower Silesia, Poland |
2027–2029+ |
Under Development / Planned Expansion |
150 MW Total Utility Capacity Allocation |
|
|
Green ZRH1 Zurich West Data Center Campus: High-Density Lupfig Hub |
Industriestrasse 31–33, 5242 Lupfig, Aargau, Switzerland |
Operational Active Expansion |
Operational / Active Expansion (Zurich West 4) |
40 MW+ Total Utility Allocation |
|
|
STACK Infrastructure AMS3 Amsterdam Data Center Campus: Hyperscale AI Hub |
Strategic Hyperscale Corridor, Amsterdam Metropolitan Area, Netherlands |
Phased Multi-Stage Expansion |
Planned / Under Development |
~50 MW – 100 MW Utility Power Allocation |
|
|
Colt LHR2 London West Data Center Campus: 9.4MW Park Royal Hub |
13 Volt Avenue, Park Royal, London NW10 6PW, United Kingdom |
Operational |
Operational |
15.0 MVA Total Utility Supply Provision |
|
|
Data4 Madrid MAD2 Data Center Campus: 80MW AI-Ready Hub |
Polígono Industrial Sur, 28750 San Agustín del Guadalix, Madrid, Spain |
2026–2028+ (Phased Multi-Building Rollout) |
Under Construction / Active Multi-Building Phase Buildout |
80 MW Total Utility Capacity Allocation |
|
|
EcoDataCenter Östersund Data Center Campus: 150MW Sustainable HPC Hub |
Municipality of Östersund, Jämtland County, Sweden |
2026–2028+ (Phased Multi-Building Expansion) |
Under Construction / Phased Campus Buildout |
150 MW Total Utility Capacity Allocation |
|
|
EcoDataCenter Falun Data Center Expansion: 80MW Sustainable AI Hub |
Slaggvarpsvägen 21, 791 77 Falun, Dalarna County, Sweden |
Operational Active Expansion |
Active Multi-Building Expansion / Under Construction |
80 MW Total Secured Utility Power Capacity |
|
|
Green Mountain OSL1 Oslo Data Center Campus: 93MW Sustainable Hub |
Granittveien 100, 1914 Ytre Enebakk, Norway |
Operational Active Expansion |
Operational / Active Expansion |
93 MW Total Utility Supply Allocation |
|
|
Bulk Infrastructure Gothenburg Data Center Campus: Nordic AI Hub |
Strategic Industrial Corridor, Gothenburg, Västra Götaland County, Sweden |
Phased Multi-Building Rollout |
Planned / Under Development |
~50 MW – 80 MW Total Secured Utility Capacity Allocation |
|
|
KevlinX Brussels Data Center Campus: 32MW+ AI-Ready Hub |
Av. Antoon Van Oss 1, 1120 Brussels, Belgium |
Active Multi-Building Campus Expansion |
Operational / Phased Active Expansion |
32 MW – 68 MW Total Utility Power Allocation |
|
|
Echelon DUB20 Data Center Campus: Ireland's 100MW Sustainable Hyperscale Hub |
Avoca River Park, Vale Road, Arklow, Co. Wicklow, Ireland |
Operational Active Campus Expansion |
Operational / Active Expansion Phase |
100 MW Secured Grid Utility Power Allocation |
|
|
Yondr Group Frankfurt Data Center Campus: 40MW Hyperscale Hub |
In der Niederwiese 3, 65474 Bischofsheim, Greater Frankfurt Metropolitan Area, Germany |
July 2025 (Full 40 MW Operational) |
Fully Operational / Active Campus Deployment |
40 MW Total Secured Utility Power Capacity Allocation |
|
|
atNorth DEN01 Copenhagen AI Data Center Campus: 30MW Sustainable HPC Hub in Denmark |
Tonsbakken 12, 2740 Skovlunde / Ballerup, Greater Copenhagen, Denmark |
Operational Active Campus |
Fully Operational / Active HPC & AI Deployment |
30 MW Total Secured Utility Power Capacity Allocation |
|
|
EdgeConneX WAW03 Warsaw Data Center Campus: 12MW Hyperscale & Edge Hub in Poland |
Posag 7 Panien 1, 02-495 Warsaw, Poland |
Operational Active Campus |
Fully Operational / Active Campus Expansion |
12 MW Secured Utility Power Allocation (WAW03 Facility) |
|
|
Green Mountain OML1 Bergen Data Center Campus: Sustainable Hyperscale Hub in Norway |
Hegglandsdalen, Osterøy Municipality, Greater Bergen Area, 5282 Osterøy, Norway |
Active Multi-Building Campus Expansion |
Fully Operational / Active Phased Expansion |
~93 MW Secured Utility Power Allocation |
|
|
Merlin Properties Lisbon AI Data Center Campus: 180MW Sustainable AI Hub |
Castanheira do Ribatejo, Vila Franca de Xira, Greater Lisbon Area, Portugal |
Active Multi-Phase Development |
Under Construction / Active Phase 1 Development |
180 MW Secured Utility Power Allocation (scalable to 300 MW) |
|
|
EcoDataCenter Stockholm Hyperscale Campus: 80MW Sustainable AI Hub in Sweden |
Greater Stockholm Region, Sweden |
Active Multi-Building Campus Development |
Active Development / Phased Buildout |
80 MW Secured Utility Power Allocation |
|
|
Yondr Group LON2 Slough Data Center: 30MW Hyperscale & AI Hub |
Slough Trading Estate Area, Slough, Berkshire, SL1 4DX, United Kingdom |
Active Multi-Phase Development |
Under Development / Active Phased Construction |
30 MW Secured Utility Power Allocation |
|
|
maincubes FRA04 Frankfurt Data Center Campus: 40MW Sustainable AI Hub |
Gulf Data Hub within the KAUST Research and Technology Park 23955 Thuwal Saudi Arabia |
Active Multi-Phase Development |
Under Development / Active Phased Planning |
40 MW Critical IT Load (60 MW Secured Utility Power Allocation) |
|
|
Start Campus SINES DC Portugal: 1.2GW Sustainable AI Data Center |
Zona C1.1, ZILS (Industrial and Logistics Zone of Sines), 7520 Sines, Portugal |
Active Multi-Phase Development through 2030 (1.2 GW total campus capacity) |
Operational (SIN01) & Active Multi-Facility Expansion (SIN02–SIN06) |
1.2 GW Secured Utility Power Allocation |
|
|
Equinix Warsaw Data Center Campus WA4x |
ul. Krakowiaków 91/101, 02-255 Warsaw, Poland (WA4x Hyperscale / Campus Node) |
Active Phased Development |
Operational & Active Multi-Building Expansion |
19.2 MW Secured Utility Power Allocation |
|
|
Equinix Warsaw WA1 Data Center: Premier Connectivity & Peering Hub in Poland |
Aleje Jerozolimskie 65/79, 00-697 Warsaw, Poland (LIM Center Skyscraper) |
Active Operational Facility |
Fully Operational Hub |
3.0 MW Secured Utility Power Allocation |
|
|
Equinix Warsaw WA2 Data Center: Regional Colocation & Cloud Node in Poland |
ul. Poleczki 23, 02-822 Warsaw, Poland |
Operational Active Facility |
Fully Operational Hub |
4.0 MW Secured Utility Power Allocation |
|
|
Equinix Warsaw WA3 Data Center: Sustainable Enterprise & Cloud Hub in Poland |
Aleje Jerozolimskie 213, 02-222 Warsaw, Poland |
Active Operational Facility |
Fully Operational Hub |
4.5 MW Secured Utility Power Allocation |
|
|
ITinSell Cloud La Ciotat Data Center: Tier IV Sovereign & HDS Hub in France |
785 Voie Antiope, Zone d'Activités Athélia III, 13600 La Ciotat, France |
Operational Active Facility |
Fully Operational Sovereign Cloud & Colocation Hub |
~3.5 MW Secured Utility Power Allocation |
|
|
DATA4 Marseille Campus: 120MW Sustainable Hyperscale & AI Hub in France |
Former Normed Shipyards Site, Zone d'Activités, 13600 La Ciotat / Marseille Metro, France |
Active Multi-Phase Development through 2030+ |
Active Development / Under Construction |
120 MW Secured Utility Power Allocation |
|
|
STACK Infrastructure MIL02A Milan Data Center: 5.6MW Colocation Hub |
Via Marche 9, 27010 Siziano (PV), Lombardy, Italy |
Operational Active Building |
Fully Operational Hub |
5.6 MW Secured Critical IT Utility Allocation |
|
|
Mainova WebHouse MWH01 Frankfurt Data Center: 30MW Sustainable Campus |
Gwinnerstraße 7 & Mergenthaler Straße 12, 60388 Frankfurt am Main, Germany |
Operational / Active Expansion Phase (MWH01.2 - 2025) |
Operational (MWH01.1) / Active Expansion (MWH01.2) |
30 MW Secured Utility Power Allocation |
|
|
Kao Data Manchester Campus (KMAN-01): 40MW AI & Hyperscale Hub |
Kenwood Point, Kenwood Road, Reddish, Stockport, SK5 6PH, United Kingdom |
Active Development Campus |
Active Development / Under Construction |
40 MW Secured Critical IT Utility Allocation |
|
|
atNorth NOR01 Data Center Campus: 350MW Sustainable Mega Hub in Haugaland, Norway |
Haugaland Business Park, 5570 Aksdal, Tysvær Municipality, Rogaland, Norway |
Active Multi-Phase Mega Campus Development |
Active Development / Under Construction |
350 MW Secured Critical IT Utility Allocation (Initial 120 MW) |
|
|
Digital Realty PAR3 Data Center Paris: Carrier-Neutral Colocation Hub in Saint-Denis |
7-9 avenue des Arts et Métiers, 93200 Saint-Denis, France |
Fully Operational Active Facility |
Fully Operational Carrier-Neutral Facility |
~10 MW to 14 MW Secured Utility Power Allocation |
|
|
Digital Realty FRA8 Data Center Frankfurt: Carrier-Neutral Hub on Weismüllerstraße |
Weismüllerstraße 36, 60314 Frankfurt am Main, Germany |
Fully Operational Active Facility |
Fully Operational Carrier-Neutral Facility |
~8 MW to 12 MW Secured Utility Power Allocation |
|
|
Hyperco Helsinki Data Center: Sustainable Hyperscale & Enterprise Hub in Finland |
Myllynkivenkuja 4, 01620 Vantaa, Finland |
Fully Operational Active Facility |
Fully Operational Hyperscale Facility |
~20 MW to 50 MW Total Secured Utility Power Capacity |
|
|
Atman Warsaw-1 (WAW-1) Data Center: Carrier-Neutral Hub in Poland |
Grochowska 21a 04-186 Warsaw Poland |
Fully Operational Active 11-Building Campus |
Fully Operational Hyperscale & Enterprise Campus |
57.0 MW Total Allocated Utility Power Capacity |
|
|
Atman Warsaw-2 (WAW-2) Data Center: Carrier-Neutral Hub in Warsaw Business District |
5 Konstruktorska St, 02-673 Warsaw, Poland |
Fully Operational Active Facility |
Fully Operational Enterprise & Interconnection Facility |
16.0 MW Total Utility Power Allocation |
|
|
NDC-GARBE FRA02 Hanau Data Center Frankfurt: Sustainable Cloud & Hyperscale Hub |
Hanau Industrial Zone (Former Civil Defense Storage Site Brownfield Redevelopment), Hesse, Germany |
Fully Operational Active Facility |
Fully Operational Hyperscale Cloud Data Center |
~15.0 MVA Total Utility Power Capacity Allocation |
|
|
Apto DC Madrid Data Center Campus: 240MW Sustainable Hyperscale Hub in Fuenlabrada |
Calle Sauce 20, Fuenlabrada, 28942 Madrid (~14 km from Madrid City Centre), Spain |
Active Multi-Building Campus Development (5 Buildings Total) |
Under Development / Active Construction Phase |
240.0 MW Total Campus Utility Power Capacity Allocation |
|
|
Digital Realty Marseille MRS4 Data Center: 13MW Mediterranean Interconnection Hub |
ancienne base sous-marine, Enceinte Portuaire, Porte 4, 13015 Marseille, France |
Fully Operational Active Facility |
Fully Operational Enterprise & Cloud Hub |
13.0 MW Total Utility Critical IT Power Allocation |
|
|
Pulsant Manchester NW-1 Data Center: Regional Edge Colocation Hub UK |
1-2 Ball Green, Cobra Court, Trafford Park, Stretford, Manchester M32 0QT, United Kingdom |
Fully Operational Active Facility |
Fully Operational Regional Edge Data Center |
~1.6 MW Total Facility Primary Power Connection |
|
|
Conapto Stockholm 1 City Data Center Sweden: 1MW Central Colocation & Recovery Hub |
Sandhamnsgatan 63B, 115 28 Stockholm, Sweden |
Fully Operational Active Facility |
Fully Operational Enterprise & Colocation Facility |
1.0 MW Total Utility Critical Power Allocation |
|
|
Digital Realty CPH3 Data Center Copenhagen: 14MW Hyperscale & Interconnection Hub |
Industriparken 24, DK-2750 Ballerup, Copenhagen, Denmark |
Fully Operational Active Facility |
Fully Operational Hyperscale & Enterprise Facility |
~16.0+ MVA Total Utility Grid Supply Allocation |
|
|
Digital Realty Marseille MRS1 Data Center: 10MW Mediterranean Subsea Interconnection Hub |
40 Avenue Roger Salengro, 13003 Marseille, France |
Fully Operational Active Facility |
Fully Operational Enterprise & Cloud Interconnection Hub |
10.0 MW Total Utility Power Grid Connection Allocation |
|
|
Digital Realty Marseille MRS6 Data Center: 50MW Sovereign Cloud & AI Hub |
Avenue Ferdinand de Lesseps, 13320 Bouc-Bel-Air (Marseille Metro Area), France |
Active Multi-Hall Warehouse Conversion & Campus Development |
Under Development / Planned Greenfield Conversion |
~60.0+ MVA Total Utility Grid Connection Allocation |
|
|
Digital Realty Paris PAR8 Data Center: 19MW Hyperscale & Enterprise Hub France |
2 Avenue Marcel Cachin, 93120 La Courneuve, Paris, France |
Fully Operational Active Facility |
Fully Operational Enterprise & Cloud Facility |
Dual independent high-voltage utility grid feeds, static N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt N+1 standby emergency diesel generator arrays with on-site fuel reserve autonomy. |
|
|
Vantage CWL21 Cardiff Data Center: 28MW Sustainable Hyperscale Hub UK |
Imperial Park, Celtic Way, Marshfield, Newport / Cardiff CF3 0XW, United Kingdom |
Active Greenfield Campus Development |
Active Development / Phased Delivery |
~35.0 MVA Primary Grid Utility Connection Allocation |
|
|
Vantage CWL44 Bridgend Data Center: 20MW Hyperscale & AI Campus South Wales UK |
Bridgend Industrial Estate / Waterton Industrial Estate, Bridgend CF31 3WT, South Wales, United Kingdom |
Active Greenfield Campus Development |
Active Development / Planned Greenfield Campus |
~25.0 MVA Primary Grid Utility Connection Allocation |
|
|
Verne Helsinki Vantaa Data Center: 10MW Sustainable AI & Cloud Hub Finland |
Verne Mittalinja 1 01260 Vantaa Finland |
Fully Operational Active Campus |
Fully Operational Enterprise, Cloud & AI Campus |
~12.0 MVA Total Utility Grid Connection Allocation |
|
|
VIRTUS Cardiff Data Center Campus: Hyperscale & AI Expansion Hub Wales UK |
Cardiff Metropolitan Corridor, South Wales, United Kingdom |
Active Regional Campus Pipeline |
Active Development / Master-Planned Regional Expansion |
Scalable Primary High-Voltage Utility Substation Supply Allocation |
|
|
Serverfarm Amsterdam AMS1 Data Center: 18MW AI-Ready Colocation Hub Netherlands |
Keienbergweg 22, 1101 GB Amsterdam / Archangelkade 1, 1013 BE Amsterdam, Netherlands |
Fully Operational Active Facility |
Fully Operational Enterprise, Cloud & AI Colocation Hub |
30.0 MVA Total Primary Utility Grid Supply Allocation |
|
|
Serverfarm London LON1 Data Center: 11.4MW AI-Ready Colocation Hub Feltham UK |
Unit 4, Westgate Estate, Staines Road, Feltham TW14 8RS, London, United Kingdom |
Fully Operational Active Facility |
Fully Operational Enterprise, Cloud & AI Colocation Hub |
~15.0 MVA Total Primary Grid Utility Connection Power Allocation |
|
|
SoftBank Group Bosquel AI Data Center: 1GW Sovereign Hyperscale Campus Hauts-de-France |
Bosquel, Communauté de Communes Somme Sud-Ouest, Hauts-de-France, France |
Target 2031 (Complete 1 GW Master-Planned AI Factory Delivery) |
Announced / Pre-Development & Site Planning |
~1.2 GVA Dedicated High-Voltage Substation Grid Capacity Allocation |
|
|
SoftBank Group Bouchain AI Data Center: 400MW Repurposed Industrial AI Factory Hauts-de-France |
Former EDF Thermal Power Plant Industrial Brownfield Site, Bouchain, Nord, Hauts-de-France, France |
Target 2031 (Complete 400 MW Industrial Conversion) |
Announced / Preferred Bidder Selected & Active Due Diligence Phase |
~500.0 MVA High-Voltage Grid Substation Capacity Allocation |
|
|
Microsoft Zaragoza Data Center Campus: €6.7B Hyperscale Cloud Hub Aragon Spain |
Rda. Externa Anillar (Z-40) 50007 Zaragoza Spain |
Long-Term Phased Campus Expansion (2026–2034) |
Permitted / Under Construction & Site Preparation |
~350 MVA Grid Capacity Allocation across Planned Substation Additions |
|
|
LEV002 Data Center (AtlasEdge Leverkusen LEV002) |
Dornierstraße 10, 51381 Leverkusen-Quettingen, North Rhine-Westphalia, Germany |
Integrated Operations across Leverkusen Campus (LEV001 + LEV002 = ~14.4 MW total capacity) |
Under Construction / Active Development |
~6.0 MVA Dedicated Utility Grid Substation Allocation |
|
|
Maincubes BER01 Berlin Data Center: Go West Campus Colocation Specs |
Mecklenburgische Straße 32 (Go West Campus), 14197 Berlin, Germany |
Active Commercial Colocation Center |
Operational |
~11.0 MVA Dedicated Utility Grid Substation Allocation |
|
|
TikTok Kouvola Data Center: €1B Project Clover Hyperscale Facility Finland |
Kouvola, Kymenlaakso, Southern Finland |
Multi-Phase Phased Delivery (Complemented by Lahti Data Center Expansion) |
Under Construction / Commissioning Phase |
~60+ MVA Dedicated Substation Grid Service Allocation |
|
|
CloudHQ Lisses CDG Data Center Campus Paris France Specs |
Rue Léonard de Vinci, 91090 Lisses, Île-de-France, France |
Multi-Phase 148.8 MW Master Campus Rollout (CDG1 & CDG2) |
Operational / Multi-Phase Expansion |
~180+ MVA Dedicated Substation Grid Service Allocation |
|
|
Icade Rungis Data Center Paris: Hyperscale Tech Park Development France |
70 Rue des Solets, Parc d'affaires Paris Orly-Rungis, 94150 Rungis, Île-de-France, France |
Multi-Phase Hyperscale Campus Rollout |
Planned / Under Development |
~45+ MVA Dedicated Utility Grid Substation Allocation |
|
|
Campus AI Paris France: €8.5B MGX Bpifrance Mistral AI Megacampus Specs |
Route Départementale 57 (D57), 77390 Fouju, Seine-et-Marne, Île-de-France, France |
Multi-Phase Gigawatt Campus Rollout across Fouju and secondary expansion sites |
Under Development / Early Site Preparation |
~1.6+ GVA Dedicated Substation Grid Service Allocation (Fouju Campus) |
|
|
Colt Berlin Data Center Campus: Enterprise Colocation Germany Specs |
Uhlandstraße 181, 10623 Berlin / Kitzingstraße 15-18, 12277 Berlin, Germany |
Active Commercial Colocation & Network Hub |
Operational / Phased Expansion |
~5.28 MVA Utility Grid Allocation |
|
|
Colt Frankfurt 3 Hyperscale Data Centre: Germany Expansion Specs |
Wilhelm-Fay-Straße, 65936 Frankfurt am Main (Sossenheim), Germany |
Active Multi-Phase Hyperscale Deployment |
Under Construction / Phased Delivery |
~40 MVA Total Utility Grid Provision / 32.4 MW Critical IT Capacity |
|
|
Arcem Joroinen Data Center Campus: Powered Land Development Finland Specs |
Vättiläntie 1227, Huutokoski Industrial Area, 79620 Joroinen, Finland |
Multi-Phase Master-Planned Campus Development |
Planned / Site Origination & Permitting Phase |
~30+ MVA Initial Substation Grid Access (Scalable to match site footprint) |
|
|
DataVita dv2 Data Centre Chapelhall: York Road Edge Hub Scotland Specs |
Unit 1, York Road, Chapelhall Industrial Estate, Chapelhall, Airdrie, ML6 8NW, Scotland, United Kingdom |
Active Commercial Operations & Corporate HQ |
Operational |
~3.5 MVA Utility Substation Allocation |
|
|
IFB Altens Data Centre Aberdeen: Scotland Managed Hosting Specs |
54 Hareness Road, Altens Industrial Estate, Aberdeen, AB12 3LE, Scotland, United Kingdom |
Active Commercial Colocation & Managed Cloud Hub |
Operational |
~1 MVA Utility Substation Connection |
|
|
IFB Union Street Data Centre Aberdeen: Central Scotland Colocation Specs |
387 Union Street, Aberdeen, AB11 6BX, Scotland, United Kingdom |
Active Commercial Colocation & Network Facility |
Operational |
~0.8 MVA Utility Grid Provision |
|
|
Brightsolid Aberdeen Data Centre: Whitemyres Ave Tier III Specs |
Whitemyres Avenue / Lang Stracht, Mastrick, Aberdeen, AB16 6HQ, Scotland, United Kingdom |
Active Commercial Operations & Colocation Hub |
Operational |
~2.5 MVA Utility Grid Allocation / 2.0 MVA Backup Generation |
|
|
Blackdog Data Center Campus Aberdeen: Multi-Gigawatt AI Hub Scotland Specs |
A92 & Aberdeen Western Peripheral Route (AWPR / A90 Junction), AB23 8AR Blackdog, Aberdeenshire, Scotland, United Kingdom |
Multi-Phase Gigawatt Master Campus Rollout |
Proposed / Planning Permission in Principle (Masterplan Entitlements) |
600 MW Initial Substation/Power Allocation (Scalable to Multi-GW) |
|
|
iomart Glasgow Data Centre DC1: Middlesex Street Colocation Specs |
88 Middlesex Street, Kinning Park, Glasgow, G41 1EE, Scotland, United Kingdom |
Operational Colocation & Managed Services Hub |
Operational |
1.0 MVA Total Grid Provisioning |
|
|
Schuberg Philis Boeing Avenue Data Center: Schiphol-Rijk Specs |
Boeing Avenue 271, 1119 PD Schiphol-Rijk, Haarlemmermeer, The Netherlands |
Active Commercial Operations & Sovereign Cloud Center |
Operational |
~4.5 MVA Utility Grid Provision |
|
|
Digital Realty AMS10 Pudongweg Data Center: Schiphol Colocation Specs |
Pudongweg 25, 1437 EM Aalsmeerderbrug (Schiphol-Rijk area), The Netherlands |
Active Commercial Colocation & Interconnection Hub |
Operational |
~31.2 MW Total Utility Power Provision |
|
|
Digital Realty AMS8 Pudongweg Data Center: Schiphol Colocation Specs |
Pudongweg 37, 1437 EM Rozenburg, North Holland, The Netherlands |
Active Commercial Operations & Cloud Campus Facility |
Operational |
~20 MVA Total Utility Substation Capacity |
|
|
nLighten Amsterdam AMS II Data Center: Schiphol-Rijk Specs |
Koolhovenlaan 120, 1119 NR Schiphol-Rijk, Haarlemmermeer, The Netherlands |
Active Commercial Edge Colocation Operations |
Operational |
~5.0 MVA Total Utility Substation Capacity Allocation |
|
|
EdgeConneX Amsterdam EDCAMS05: Schiphol-Rijk Hyperscale Specs |
Boeing Avenue 201-203, 1119 PD Schiphol-Rijk, Haarlemmermeer, The Netherlands |
Active Commercial Operations & Cloud Edge Hub |
Operational |
~25 MVA Dedicated Utility Substation Allocation |
|
|
DayOne Aragon AI Data Center Campus: Technical Specs & Infrastructure |
Ctra. de Quinto de Ebro a Gandesa (A-221), 50790 Escatrón, Zaragoza, Spain |
Operational in phased 50 MW–100 MW high-density modules |
Announced / Under Development |
~300 MW High-Voltage Grid Substation & Direct Generation Capacity |
|
|
Campus Data Navarra: Grupo VDR Data Center Specs |
Polígono de servicios de Gazólaz (Calle A & Calle C), 31190 Gazólaz, Navarra, Spain |
2029 (Buildings 2–4 with 100 MW capacity each) |
Announced / Pre-Construction & Urbanization Phase |
~350 MVA Total Substation Grid Capacity |
|
|
Tillion Aragon Data Center Campus: Technical Specs |
~80-Hectare Master Site, Carretera A-129, 50162 Villamayor de Gállego, Zaragoza, Spain |
2032–2034 (Multi-Phase Rollout to 300 MW Total Scale over 7–8 Years) |
Announced / Pre-Construction Phase (DIGA Approved) |
~350 MVA Total Utility Substation Capacity (150 MW Initial Secured Grid Concession, Expandable to 300 MW) |
|
|
Apto Lacchiarella Data Center Campus: Technical Specs |
Via SP105 / SP40 Junction Area, 20084 Lacchiarella, Metropolitan City of Milan, Italy |
2029–2030 (Multi-Phase Rollout Across All 3 Buildings) |
Announced / Pre-Construction & Permitting Phase |
~220 MVA Dedicated Substation Grid Connection |
|
|
Adriatic DC Bari Data Center: Technical Specs |
Via Francesco de Blasi, Ex-Manifattura Tabacchi Industrial Zone, 70123 Bari, Puglia, Italy |
2030 (Multi-Phase Campus Deployment) |
Announced / Permitting & Site Regeneration Phase |
~250 MVA Dedicated Utility Substation Capacity |
|
|
EDF OpCore Montereau AI Data Center France Hyperscale Campus |
Former Montereau Thermal Power Station Site, Montereau-Fault-Yonne, 77130, France |
Q4 2029 |
Under Construction / Master Development |
200 MW Gross Utility Power Capacity (Campus Limit) |
|
|
Polarise Amberg AI Data Center Bavaria Germany |
Amberg Industrial Park, 92224 Amberg, Bavaria, Germany |
Q2 2028 |
Under Construction |
100 MW Gross Utility Power Capacity |
|
|
Prime Esbjerg ESB01 Data Center Nordre Tovrupvej Denmark Prime Data Centers |
Nordre Tovrupvej, 6705 Esbjerg, Denmark |
Q4 2033 (Full 550MW Campus Buildout) |
Under Development / Planned |
650 MW Gross Utility Power Capacity |
|
|
Île-de-France AI Infrastructure Campus Ardian Verne Paris France |
Greater Paris Metropolitan Area, Île-de-France, France |
Q4 2029 (Full 120MW IT Buildout) |
Under Development / Planned |
150 MW Gross Utility Power Capacity |
|
|
Goodman AMS01 Data Centre (Amsterdam) |
Hybrideweg 101, 2141 DM Vijfhuizen, Netherlands |
Expected 2027–2028 |
Planning & Power Secured / Under Development |
76.0 MW Secured Power Capacity / 48.0 MW Total IT Load Campus Capacity |
|
|
Goodman PAR01A Data Centre 13 Rue Charles Cros Tremblay en France Paris Goodman Group |
13 Rue Charles Cros, 93290 Tremblay-en-France, France |
Q4 2028 |
Under Development / Planning Phase |
48.0 MW Gross Utility Power Allocation / 32.0 MW Total IT Load |
|
|
Goodman PAR01 Data Centre Campus |
13 Rue Charles Cros, 93290 Tremblay-en-France / Paris, France |
Q4 2029 |
Under Development / Planning Phase |
96.0 MW Gross Utility Power Allocation / 64.0 MW Total Campus Critical IT Load |
|
|
Goodman PAR02 Data Centre Campus |
34 Rue Louis Armand, 94190 Villeneuve-Saint-Georges, France |
Q4 2030 |
Under Development / Planning Phase |
108.0 MW Gross Utility Power Allocation / 72.0 MW Total Campus Critical IT Load |
|
|
Nscale Oslo AI Data Center Campus Norway Renewable Hydro Compute Hub |
Hønefoss, Buskerud, Norway |
Q4 2026 |
Operational & High-Density AI Expansion Phase |
25.0 MW Gross Power Allocation / 20.0 MW Critical IT Load |
|
|
atNorth ICE02 Keflavik Mega Data Center Sjónarhóll Reykjanesbær Iceland |
Sjónarhóll 6, 235 Reykjanesbær (Keflavik), Iceland |
Operational / Multi-Phase High-Density Expansion |
Operational & High-Density Expansion Phase |
80.0 MW Gross Power Allocation / 64.0 MW Critical IT Load |
|
|
Microsoft Bornasco Data Center Campus |
Via dei Pioppi & Via Olivetti (ex Via Rimembranze), 27010 Bornasco (PV), Italy |
Early 2029 |
Under Construction Phase (Groundbreaking Q1 2026) |
65.0 MW Gross Power Allocation / 50.0 MW Critical IT Power Load |
|
|
Microsoft Cologne INKA Data Center Campus Bergheim terra nova Industrial Park Germany |
Industrial Park INKA:terra nova, 50126 Bergheim, North Rhine-Westphalia, Germany |
Q4 2029 |
Under Construction Phase (Groundbreaking Q1 2026) |
115.0 MW Gross Power Allocation / 90.0 MW Critical IT Power Load |
|
|
Vantage FRA2 Frankfurt II Data Center Campus – 56 MW IT Load |
Alexander-von-Humboldt-Strasse 4, 65479 Raunheim, Germany |
2025 (56 MW total across 2 buildings) |
Phase 1 Operational / Phase 2 Expansion |
56 MW critical IT load allocation |
|
|
Northern Data European AI Mega Campus Frankfurt – 60 MW HPC |
Main-Biopark Industrial Zone, Frankfurt Metropolitan Area, Germany |
Q2 2026 (Full 60 MW IT load operational) |
Fully Operational / Phased Expansion |
75 MW grid supply allocation |
|
|
CyrusOne FRA4 Frankfurt Data Center Sossenheim – 11 MW |
Wilhelm-Fay-Straße 58, 65936 Frankfurt am Main, Germany |
Q4 2021 (Full 11 MW critical load operational across 4 floors) |
Fully Operational |
15 MW utility grid supply |
|
|
Vantage FRA13 Offenbach Frankfurt Data Center – Hyperscale Campus |
Goethering 27, 63067 Offenbach am Main, Hesse, Germany |
Q4 2024 / Q1 2025 |
Fully Operational / Active Phase |
70 MVA Gross Grid Allocation (56 MW IT Load) |
|
|
STACK Infrastructure STO01 Stockholm Sovereign Data Center – 30 MW |
Smedbyvägen 6, 194 30 Upplands Väsby, Stockholm, Sweden |
2024 / 2025 (Complete 30 MW active across STO01A and STO01B) |
Fully Operational (STO01A) / Expansion Active (STO01B) |
35+ MVA dedicated grid transformation capacity |
|
|
GLi Charlton Gateway London Data Center – 180MW Greenwich Hub |
669A Woolwich Road, Charlton, London SE7 8SL, United Kingdom |
Scheduled across 70,324 sq m master plan |
Proposed / Planning Scoping & EIA Phase |
182.0 MVA Dedicated Utility Grid Feed |
|
|
Templus Lisbon LIS01 1.5MW Carrier-Neutral Data Center |
Edifício Diogo Cão, Doca de Alcântara Norte, 1350-352 Lisbon, Portugal |
500 m² whitespace hosting 150 server racks with full cage, suite, and rack colocation options |
Operational / Regional Edge Interconnection Node |
Substation Power Infrastructure Allocation |
|
|
MEO LDV Linda-a-Velha Lisbon Interconnection Data Center |
R. Marconi SN, 2795-242 Linda-a-Velha, Lisbon, Portugal |
3,000 m² building housing multi-carrier meet-me rooms, high-density server racks, and subsea cable interconnects |
Operational / Strategic International IX Hub |
Substation Utility Grid Allocation |
|
|
AtlasEdge Lisbon Campus Carnaxide 30MW Data Center |
Estrada Outurela 117a, 2790-072 Carnaxide, Lisbon, Portugal |
Multi-building edge campus offering up to 30 MW IT capacity optimized for high-density AI/HPC racks |
Operational & Active Multi-Phase Expansion |
Substation Power Infrastructure Allocation |
|
|
NOS Imopolis II Carnaxide Lisbon 2MW Data Center |
Parque Holanda, Estrada Outurela 118, 2790-114 Carnaxide, Portugal |
Modular white space hosting customizable racks, private suites, and cloud analytics platforms |
Operational / Enterprise Cloud & Managed IT Facility |
Dedicated Utility Grid Connection Allocation |
|
|
NOS Imopolis I Carnaxide Lisbon 1.26MW Data Center |
Estrada Outurela 118, 2790-114 Carnaxide, Portugal |
1,777 m² computer room area hosting enterprise white space, private cabinets, and managed server racks |
Operational / Strategic Enterprise & Colocation Node |
Substation Power Infrastructure Allocation |
|
|
MEO Picoas Lisbon Carrier-Neutral Colocation Data Center |
Av. Fontes Pereira de Melo 38C, 1069-300 Picoas, Lisbon, Portugal |
Urban technical facility hosting high-density telecom routing switches, carrier meet-me rooms, and colocation suites |
Operational / Strategic Metro Telecom & Interconnection Node |
Substation Grid Capacity Allocation |
|
|
Oni Datacenter Lisbon Matinha 1MW Colocation Facility |
Rua 3 da Matinha A, Edifício Altejo, 1950-326 Lisbon, Portugal |
2,000 m² total whitespace hosting 500+ racks, private cages, virtual cloud nodes, and telco footprints |
Operational / Strategic Enterprise & Carrier Node |
Substation Power Infrastructure Allocation |
|
|
WebTuga LS2 Lisbon Edifício Altejo Colocation Data Center |
Rua nº3 da Matinha - Edifício Altejo, 1950-326 Lisbon, Portugal |
Technical whitespace hosting high-density rack units, private cages, virtualized cloud racks, and telco PoPs |
Operational / Strategic Regional Edge & Hosting Node |
Substation Utility Grid Capacity Allocation |
|
|
FCCN SE03 GigaPix II Lisbon Academic Internet Exchange Data Center |
Piso 1, Edifício Manuel Rocha, Avenida do Brasil 101, 1700-066 Lisbon, Portugal |
Specialized technical whitespace hosting GigaPIX core switches, RCTS optical routers, and peering racks |
Operational / Strategic National Academic & Internet Exchange Hub |
Dedicated Utility Grid Connection Allocation |
|
|
MEO Carnide Lisbon Enterprise Colocation Data Center |
R. Maria Veleda 1, 1500-024 Carnide, Lisbon, Portugal |
300 m² technical whitespace hosting customizable enterprise racks, server footprints, and cloud nodes |
Operational / Enterprise Edge & Hosting Hub |
Substation Grid Capacity Allocation |
|
|
Claranet Lisboa Prior Velho Enterprise Colocation Data Center |
Av. Severiano Falcao, 16, 1998-014 Lisbon, Portugal |
Technical white space hosting enterprise racks, hybrid cloud platforms, and managed security suites |
Operational / Strategic Enterprise Cloud & Colocation Hub |
Substation Utility Grid Capacity Allocation |
|
|
Equinix LS1 Lisbon IBX Colocation Data Center |
Av. Severiano Falcão 14, 2685-378 Prior Velho, Lisbon, Portugal |
1,487 m² technical colocation white space supporting 4.0 kW to 6.0 kW+ density per rack, private cages, and cloud suites |
Operational / Flagship International Interconnection Hub |
Substation Utility Grid Allocation |
|
|
Equinix LS2 Lisbon IBX 2MW+ Carrier-Neutral Data Center |
Avenida Severiano Falcão 12–14, 2685-378 Prior Velho, Lisbon, Portugal |
2,050 m² colocation white space optimized for AI/HPC high-density cabinets, private cages, and cloud suites |
Operational / Strategic IBX Campus Expansion Node |
Substation Utility Grid Capacity Allocation |
|
|
Edged Lisbon Campus Castanheira do Ribatejo 100MW Data Center |
Azinhaga da Fruteira 2600, 2600-638 Castanheira do Ribatejo, Portugal |
100 MW multi-building hyperscale campus with high-density AI liquid-cooled racks and solar integration |
Active Development / Phased Buildout |
Substation Power Infrastructure Allocation |
|
|
EDC One Pego Abrantes 100MW Hyperscale Data Center |
Estrada Nacional 118 (EN118), 2205-305 Pego, Abrantes, Portugal |
Multi-building campus featuring high-density AI rack configurations, battery storage (BESS), and liquid cooling |
Under Development / Strategic Greenfield Campus |
Dedicated Substation Utility Grid Capacity Allocation |
|
|
Ar Telecom Porto Largo da Estacao Data Center |
Largo da Estação, 4350 Porto, Portugal |
Operational colocation facility catering to northern regional cloud, edge, and telecommunication workloads |
Operational |
MV Grid Connection |
|
|
NFSI Porto 1 Colocation & Telecom Data Center |
R. Dr. Alfredo Magalhães, 46, 4000-061 Porto, Portugal |
Technical whitespace supporting full/partial racks, private suites, cages, and high-speed network PoPs |
Operational |
Substation Utility Grid Capacity Allocation |
|
|
NOS Data Center NS Matosinhos Porto Enterprise Colocation |
R. Henrique Pousao, n.o 432, 4461-901 Senhora da Hora - Matosinhos, Portugal |
1,800 m² technical white space hosting standard/high-density enterprise racks, private cages, and telco PoPs |
Operational / Primary Northern Enterprise Hub |
Dedicated Utility Grid Connection Allocation |
|
|
MEO Tenente Valadim Porto Enterprise Colocation Data Center |
R. de João de Deus 636, 4100-366 Porto, Portugal |
Urban technical facility hosting telecom switches, enterprise colocation racks, and carrier meet-me rooms |
Operational / Primary Northern Telecom & Interconnection Node |
Substation Grid Capacity Allocation |
|
|
REGISTER Porto Enterprise Cloud & Colocation Data Center |
Rua Dr Dinis Jacinto, 4350-059 Porto, Portugal |
Technical whitespace hosting enterprise server racks, cloud platforms, and web hosting infrastructure |
Operational / Regional Cloud & Managed IT Hub |
Substation Utility Grid Capacity Allocation |
|
|
MEO Covilhã Data Center Flagship Cloud & Colocation Hub Portugal |
Transversal Rua da Grila 4, 6200-000 Covilhã, Portugal |
4-block modular campus with 24 server halls housing over 50,000 physical server footprints |
Operational / Flagship National Infrastructure Hub |
Substation Power Infrastructure Allocation |
|
|
FCCN SE02 GigaPix Porto Internet Exchange Data Center |
FEUP, Sala 102, Edifício CICA, Rua Dr. Roberto Frias, 4200-465 Porto, Portugal |
Technical switching room hosting national internet exchange switches, research compute racks, and carrier PoPs |
Operational / Primary Northern IXP & Academic Switching Node |
University Grid Connection Allocation |
|
|
IP Telecom Lisbon Prior Velho Enterprise Colocation Data Center |
Prior Velho, 2685 Loures, Greater Lisbon, Portugal |
Technical whitespace hosting enterprise server cabinets, cloud infrastructure, and railway fiber PoPs |
Operational / Primary Capital Metropolitan Hub |
Substation Utility Grid Capacity Allocation |
|
|
Colt Lisbon Carnaxide Carrier-Neutral Data Center |
Estrada da Outurela 118, 2790-113 Carnaxide, Greater Lisbon, Portugal |
Carrier-neutral whitespace hosting enterprise server racks, managed network nodes, and carrier PoPs |
Operational / Strategic Network Interconnect Node |
Substation Utility Grid Capacity Allocation |
|
|
EXA Infrastructure Lisbon Cable Landing Station & Subsea Hub |
Greater Lisbon Digital Corridor, Portugal |
Cable landing station whitespace housing subsea SLTE/PFE equipment, optical amplifiers, and carrier PoPs |
Operational / Strategic Subsea Gateway |
Utility Grid Connection Capacity Allocation |
|
|
Vodafone Portugal Lisbon Headquarters Central Office & Data Center |
Avenida D. João II 36, Parque das Nações, 1998-017 Lisbon, Portugal |
Urban technical complex hosting 5G core switching, enterprise cloud suites, and network operations rooms |
Operational / Primary Capital Telecom Core Node |
Substation Utility Grid Capacity Allocation |
|
|
REN Ermesinde Data Center RENTELECOM Porto Carrier-Neutral Colocation |
Rua das Agras Novas 46, 4445-283 Ermesinde, Portugal |
Operational Phase |
Operational / Primary Northern Telecommunications Node |
Substation Power Infrastructure Allocation |
|
|
REN Sacavém Data Center RENTELECOM Lisbon Carrier-Neutral Colocation |
Sacavém, 2685 Loures, Greater Lisbon, Portugal |
Technical whitespace supporting full/partial cabinets, private cages, and carrier PoPs |
Operational / Primary Capital Telecommunications Hub |
Substation Power Infrastructure Allocation |
|
|
Retelit Corsico Milan Carrier-Neutral Colocation Data Center |
Via Antonio Canova 7/9, 20094 Corsico (MI), Italy |
Technical whitespace hosting enterprise server racks, cloud infrastructure, and national carrier PoPs |
Operational / Primary Strategic Telecom & Cloud Node |
Substation Utility Grid Capacity Allocation |
|
|
Vodafone Milan Via Kuliscioff Central Office & Network Data Center |
Via Anna Kuliscioff 32/38, 20152 Milan, Italy |
Metropolitan technical exchange hosting 5G core switching, enterprise cloud suites, and network rooms |
Operational / Primary Capital Metropolitan Core Hub |
Substation Utility Grid Capacity Allocation |
|
|
Keppel Milan Data Centre Via Bisceglie Enterprise Colocation |
Via Bisceglie 71, 73 & 75, 20152 Milan, Italy |
Multi-tenant whitespace hosting enterprise server cabinets, cloud infrastructure, and telecommunication PoPs |
Operational / Flagship Italian Colocation Asset |
Substation Utility Grid Capacity Allocation |
|
|
Equinix ML2 Milan Via Savona International Business Exchange Data Center |
Via Savona 125, 20144 Milan, Italy |
Multi-tenant IBX whitespace hosting enterprise server cabinets, cloud nodes, and network PoPs |
Operational / Strategic European Interconnection Node |
Substation Utility Grid Capacity Allocation |
|
|
Retelit Settimo Milanese Via Darwin Enterprise Colocation Data Center |
Via Carlo Roberto Darwin 85, 20019 Settimo Milanese (MI), Italy |
Technical whitespace hosting enterprise server cabinets, cloud nodes, and network PoPs |
Operational / Strategic Milan Metro Node |
Substation Utility Grid Capacity Allocation |
|
|
DATA4 Milan Campus MIL01 Cornaredo 170MW Hyperscale Data Center |
Via Monzoro 101-105, 20007 Cornaredo (MI), Italy |
20-hectare campus hosting up to 12+ standalone data center modules for cloud & enterprise tenants |
Operational / Strategic Multi-Building Hyperscale Campus |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Vantage MXP2 Milan II Castelletto 32MW Hyperscale Data Center Campus |
Via Aganippo Brocchi, 20019 Castelletto (MI), Italy |
2-building campus hosting dedicated enterprise halls, cloud availability pods, and high-density AI suites |
Under Construction / Multi-Phase Buildout |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
DATA4 Milan Campus MIL02 Vittuone 100MW Hyperscale Data Center |
Via Giovanni Pascoli, 20009 Vittuone (MI), Italy |
22-hectare campus hosting up to 6+ standalone data center modules for hyperscale & AI tenants |
Under Construction / Multi-Phase Hyperscale Development |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Hscale MXP1 Arluno Milan Hyperscale Data Center |
Via Padre Massimiliano Kolbe, 20004 Arluno (MI), Italy |
Technical whitespace hosting hyperscale cloud suites, AI pods, and carrier PoPs |
Operational / Strategic Western Milan Hyperscale Hub |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
DAMAC Digital MIL01 Pregnana Milanese 15MW Hyperscale Data Center |
Viale dell'Industria 15-3, 20006 Pregnana Milanese (MI), Italy |
Purpose-built campus hosting dedicated hyperscale suites, cloud availability zones, and AI clusters |
Under Construction / Multi-Phase Buildout |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
VIRTUS MILAN1 Cornaredo 30MW Hyperscale Data Center Campus |
Via Brennero, 20007 Cornaredo (MI), Italy |
15-hectare campus hosting high-density AI suites, private enterprise halls, and cloud availability pods |
Under Construction / Strategic Italian Flagship Hub |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Fastweb Milan Via Caracciolo Central Office & Cloud Data Center |
Via Francesco Caracciolo 51, 20155 Milan, Italy |
Metropolitan technical exchange hosting 5G core switching, enterprise cloud suites, and network rooms |
Operational / Primary Capital Metropolitan Core Hub |
Substation Utility Grid Capacity Allocation |
|
|
TIM Telecom Italia Rozzano Flagship Cloud & Colocation Data Center |
Via Achille Grandi, 20089 Rozzano (MI), Italy |
Strategic national campus hosting Google Cloud Region, sovereign government data, and enterprise halls |
Via Achille Grandi, 20089 Rozzano (MI), Italy |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Equinix ML5 Milan Rozzano 18MW Hyperscale IBX Data Center |
Via Gian Battista Vico 1, 20089 Rozzano (MI), Italy |
Strategic IBX campus hosting enterprise server cabinets, hyperscale cloud suites, and network PoPs |
Operational / Flagship Italian Interconnection Hub |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Vantage MXP1 Milan Linate 64MW Hyperscale Data Center Campus |
Via per Carpiano, 32, 20077 Melegnano MI, Italy |
30-acre campus hosting up to 3 standalone data center buildings for hyperscale & AI workloads |
Operational / Flagship Italian Hyperscale Campus |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Equinix ML3 Milan Basiglio Carrier Neutral IBX Data Center |
Via Francesco Sforza 13, 20080 Basiglio (MI), Italy |
Multi-tenant IBX whitespace hosting enterprise server cabinets, cloud nodes, and network PoPs |
Operational / Strategic Interconnection Node |
Substation Utility Grid Capacity Allocation |
|
|
Retelit Bologna Castenaso Enterprise Colocation Data Center |
Via Cà dell'Orbo Nord 35, 40055 Castenaso (BO), Italy |
Regional technical facility hosting enterprise cabinets, edge cloud nodes, and carrier PoPs |
Operational / Strategic Regional Hub |
Substation Utility Grid Capacity Allocation |
|
|
Galicia Green Data Center Curtis Teixeiro 15MW Green AI Facility |
Polígono Industrial Teixeiro, 15310 Curtis–Teixeiro, A Coruña, Galicia, Spain |
Northwest Spain's landmark green digital hub hosting enterprise suites and cloud workloads |
Approved Strategic Project / Active Pre-Construction Phase |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
EDGNEX MAD01 Vicálvaro Madrid 40MW Hyperscale Data Center |
Calle Vigil, 11, Vicálvaro, 28052 Madrid, Spain |
Strategic Southern European cloud hub hosting enterprise suites, hyperscale clouds, and AI nodes |
Under Construction / Active Development Phase |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Portus IPHH4 Hamburg Wendenstraße 12.8MW Hyperscale Data Center Germany |
Wendenstraße 412, 20537 Hamburg, Germany |
Multi-building 12.8 MW interconnected campus node in Hamburg |
Under Construction / Active Development |
20.3 MVA Grid Connection Capacity |
|
|
Iridium Carretera Nacional Alcalá de Henares 50MW Hyperscale Data Center Madrid Spain |
Carretera Nacional II, Alcalá de Henares, 28805 Madrid, Spain |
Strategic Eastern Madrid availability zone & high-density AI supercomputing node |
Active Development / Construction Phase |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Form8tion Madrid One Fuenlabrada 160MW Hyperscale Data Center Campus Madrid Spain |
Calle Sauce 20, 28942 Fuenlabrada, Madrid, Spain |
5-building 160MW flagship hyperscale and AI supercomputing hub in Madrid |
Under Construction / Active Campus Phase Development |
Dedicated Substation High-Voltage Infrastructure Allocation |
|
|
Thames Valley Park Data Centre Reading RG6 1WG 72MW Hyperscale Data Center Berkshire UK |
Thames Valley Park, Reading, Berkshire RG6 1WG, UK |
72MW flagship tech-corridor hyperscale and AI computing facility in Reading |
Proposed / Public Consultation Phase |
72.0 MW Dedicated IT Load Supply |
|
|
DE Devon Data Campus Alverdiscott 100MW Zero Carbon Hyperscale Data Centre UK |
Alverdiscott, Torridge District, Devon EX39, England, UK |
Strategic South West UK zero-carbon availability zone & AI supercomputing node |
Proposed / Active Planning & Land Scoping Phase |
Substation High-Voltage Infrastructure Capacity Allocation |
|
|
Larbert Data Centre Campus Glenbervie Business Park Falkirk Scotland 300MW |
Glenbervie Business Park, Bellsdyke Road, Larbert, Scotland, UK |
55-acre 300MW flagship Scottish Central Belt green computing campus |
Proposed / Full Planning Application Accepted by Falkirk Council |
300 MW Confirmed Grid Agreement |
|
|
Arcem Husnes Data Center Gron Naeringspark Kvinnherad Norway 90MW |
Grøn Næringspark, 5460 Husnes, Kvinnherad Municipality, Vestland, Norway |
60,000+ sq. m. 90MW green computing and storage campus in Western Norway |
Proposed / Land Secured & Grid Reservation Active |
90 MW Total Plan (Phase 1 Grid Reserved for 40 MW via BKK) |
|
|
Arcem Bergen Data Center Langedalen Sondre Arna Norway 130MW |
Langedalen (Arnatippen), Søndre Arna, 5268 Haukeland, Bergen, Norway |
Flagship 130MW green AI and cloud computing campus in Søndre Arna, Bergen |
Proposed / Plan Initiative Submitted to Bergen Municipality |
Up to 130 MW Grid Power Application |
|
|
Dataglow Energy Data Center Project |
London Way, Melbourn, Royston SG8 6DJ, UK |
Flagship UK deployment of the Energy Superloop waste-heat model |
Planning Permission Pending / Development Phase |
~30%+ direct local solar power supply + 100% renewable grid import |
|
|
Pinewood Nurseries Data Centre Wexham Street Stoke Poges SL3 6NB UK |
Land at Pinewood Nurseries, Wexham Street, Stoke Poges, Buckinghamshire SL3 6NB, UK |
Flagship Slough-fringe hyperscale & AI inference compute facility |
Outline Planning Submitted (Application Ref: PL/26/06414/OA) |
Planned grid connection + on-site energy generation centre (~5,000 sq. m) |
|
|
LDC1 South Mimms Data Centre Hertfordshire Equinix DC01UK 3.9B |
Land East of South Mimms Services, St Albans Road, South Mimms, UK |
85-acre, 2M sq. ft. flagship £3.9B cloud & AI campus in South Mimms, UK |
Approved Outline Planning / Pre-Construction Site Prep |
~400 MW High-Voltage Grid Capacity Request |
|
|
Bower Street Data Centre Manchester Latos M40 2AF AI Edge |
Land south of Bower Street / Ten Acres Lane, Newton Heath, Manchester M40 2AF, UK |
28,000 sq. ft. flagship Neural Edge AI data centre in Newton Heath, East Manchester |
Proposed / Planning Application Submitted (Manchester City Council Ref: PLA-2026-001350) |
Estimated ~10 MW Power Interconnect Request |
|
|
Hayes Bridge Retail Park Heathrow Data Centre Uxbridge Road UB4 0RH |
Uxbridge Road, Hayes UB4 0RH, London Borough of Hillingdon, UK |
4-phase, 85,000+ sqm flagship Colt cloud & AI campus in Hayes, West London |
Approved Hybrid Planning (Ref: 78343/APP/2025/719) / Reserved Matters Active |
~180 MW Dedicated Substation Allocation Request |
|
|
Meta Data Center Campus Talavera de la Reina Toledo Spain 248MW |
Torrehierro Industrial Park Phase 2, Talavera de la Reina, Toledo, Spain |
191-ha, 248MW flagship European Meta hyperscale AI campus in Talavera de la Reina |
Approved (PSI Designation) / Land Reparceling & Pre-Construction |
248 MW Approved High-Voltage Transmission Interconnect |
|
|
Cardiff East Data Centre Park and Ride Wales UK Curtis Hall |
Cardiff East Park & Ride, St Albans Road, Pentwyn / Llanrumney, Cardiff, Wales, UK |
~10-ha high-density cloud & AI compute campus in Pentwyn/Llanrumney, Cardiff |
Proposed / Planning Hybrid Submitted (Welsh Government Holding Direction Active) |
~80 MW High-Voltage Grid Capacity Allocation Request |
|
|
DataVita DV4 Data Centre Chapelhall North Lanarkshire Scotland 120MW |
Land south of Lancaster Avenue / Bellside Road, Chapelhall, ML6 8XN, UK |
9.67-ha, 120MW green AI hyperscale facility in Scotland's AI Growth Zone |
Proposed / Planning Permission in Principle Submitted (Ref: North Lanarkshire Council) |
~150 MW High-Voltage Grid Allocation Request |
|
|
Kao Data Park Royal Data Center London UK Acton Lane |
Former Frogmore Industrial Estate, Acton Lane, Park Royal, West London NW10, UK |
4.7-acre, 107,000 sq ft sustainable AI & cloud data center in West London |
Proposed / Pre-Planning & Community Consultation |
Est. 30 MW Dedicated High-Voltage Utility Supply Allocation |
|
|
Revikon Giessen Data Center Germany 65MW Katzenfeld Campus |
Gewerbegebiet Katzenfeld (Gießen-West Outer Ring Road), 35390 Gießen, Hesse, Germany |
Q4 2032 |
Proposed / Municipal Council Approved |
65.0 MW IT Load / Dedicated High-Voltage Substation Interconnect Allocation |
|
|
Greenfield Finsbury Milan Data Center Lombardy Italy 36MW AI Campus |
East of Milan, Metropolitan Area of Milan, Lombardy, Italy |
Q3 2029 |
Proposed / Pre-Development & Engineering Phase |
80.0 MW Substation Allocation |
|
|
Greenock Data Centre Spango Valley IBM Site Scotland 80000 sqm AI Campus |
Former IBM Site, Spango Valley, Inverkip Road, Greenock PA16 0AH, Scotland, UK |
Q4 2032 |
Proposed / Planning Permission in Principle (PPP) Application Submitted |
150.0 MW Total Power Draw Allocation (Supported by 99 MW BESS) |
|
|
SDC M40 Campus 300MW Data Centre Beaconsfield Buckinghamshire UK |
Former landfill and mineral extraction site between M40 and A40 (Oxford Road), near Beaconsfield and Gerrards Cross, Buckinghamshire, UK |
Q4 2032 |
Proposed / Nationally Significant Infrastructure Project (NSIP) DCO Consultation Stage |
300.0 MW Total Campus Power Capacity |
|
|
Norwich Apex Data Centre Keswick South Norfolk Ipswich Road 150MW AI Cloud Campus |
Land adjoining Ipswich Road and the B1113 (opposite Tesco Harford Superstore), Keswick, South Norfolk, UK |
Q4 2030 |
Proposed / Pre-Planning Consultation Stage |
150.0 MW Total Campus Power Allocation |
|
|
Google Kajaani AI Data Center Infrastructure Finland Kainuu Hyperscale |
Ryynäsentie, Kajaani, Kainuu Region, Northern Finland |
Q4 2031 |
Proposed / Land Acquired & Development Planning Phase |
300.0 MW Contracted Utility Grid Capacity |
|
|
Google Muhos AI Data Center Infrastructure Muhos Finland Northern Ostrobothnia Hyperscale |
Dedicated Data Center Site (2,100 ha combined acquisition area), Muhos, Northern Ostrobothnia, Finland |
Q4 2031 |
Under Development / Site Preparation & Pre-Construction Phase |
300.0 MW Contracted Grid Capacity |
|
|
Google Vaala AI Data Center Infrastructure Vaala Finland North Ostrobothnia Hyperscale |
Ouluntie (Highway 22), Nuojua–Järvikylä, 91700 Vaala, Finland |
Q4 2031 |
Under Development / Site Infrastructure & Pre-Construction Phase |
300.0 MW Contracted Grid Capacity |
|
|
Former Sipson Garden Centre Data Center Campus Sipson Road West London UB7 Heathrow |
Former Sipson Garden Centre site, Sipson Road (A408), Sipson, London Borough of Hillingdon, West London UB7 0HW, UK |
Q4 2030 |
Proposed / Pre-Planning Land Site Conversion Stage |
40.0 MW Contracted Grid Interconnect Capacity |
|
|
Schwarz Group Dummerstorf Data Center Stackit Cloud Mecklenburg Vorpommern |
Dummerstorf, Mecklenburg-Vorpommern 18196, Germany |
Q4 2031 |
Proposed / Land Acquisition & Planning Phase |
50.0 MW Contracted Utility Power Allocation |
|
|
Cato Data Centre Campus Auchtertool Fife Scotland 600MW AI Hyperscale |
Land north of Camilla Road, Camilla Farm, Gleniston, Auchtertool, Fife KY2 5XW, UK |
Q4 2032 |
Proposed / Planning Permission in Principle (PPP) Phase |
600.0 MW Contracted Utility Interconnect |
|
|
Rufus Data Centre Campus Hurlford East Ayrshire Scotland 540MW AI Hyperscale |
Land at Purroch Farm, Mauchline Road, Hurlford, East Ayrshire, KA1 5JJ, Scotland, UK |
Q4 2032 |
Proposed / Pre-Application Consultation (25/0008/PREAPP) |
540.0 MW Contracted Grid Interconnect Capacity |
|
|
Aurelius Data Centre Campus Newhouse Cleland North Lanarkshire Scotland 400MW AI |
Land at North Lanrigg, Carlisle Road, Cleland / Newhouse, North Lanarkshire, ML1 5LT, Scotland, UK |
Q4 2031 |
Proposed / Pre-Application Consultation & EIA Screening Stage (26/00595/EIASCR / 25/00989/PAN) |
400.0 MW Contracted Grid Interconnect Capacity |
|
|
Apatura Drumshangie Data Center Greengairs North Lanarkshire Scotland 500MW AI |
Drumshangie Moss & Former Opencast Coal Mine Site, Greengairs / Airdrie, North Lanarkshire, ML6 7TZ, Scotland, UK |
Q4 2032 |
Proposed / Pre-Planning Application Consultation Stage (26/00069/PAN) |
500.0 MW Contracted Grid Interconnect Capacity |
|
|
Apatura Borders Data Center Coldstream Laundry Field Scottish Borders Scotland |
Laundry Field, Land East of A697, Coldstream, Scottish Borders, TD12 4LZ, Scotland, UK |
Q4 2032 |
Proposed / Pre-Planning & EIA Screening Phase (25/00556/SCR) |
300.0 MW Contracted Grid Interconnect Capacity |
|
|
Cerebras Mikkeli Data Center Campus Mikkeli Finland |
Mikkeli Industrial Area / Technology Park, Mikkeli, South Savo, Finland |
Q4 2029 |
Under Construction / Phased Expansion |
165.0 MW Contracted Total IT Capacity (50 MW Initial Phase) |
|
|
Kao Data KLON 06 16MW Data Center Slough United Kingdom |
Slough Trading Estate, 672 Galvin Road, Slough, SL1 4AN, United Kingdom |
Q4 2023 |
Operational / Fully Leased Colocation & Enterprise Campus |
20.0 MW Total Utility Power Interconnect |
|
|
NTT GDC Slough Campus 5 MW Data Center United Kingdom |
Slough Trading Estate, 665 & 670 Ajax Avenue, Slough, SL1 4BG, United Kingdom |
Q4 2014 |
Operational / Colocation & Enterprise Cloud Hub |
6.0 MW Total Utility Interconnect |
|
|
Digital Realty LHR26 9MW Data Center Slough United Kingdom |
Slough Trading Estate, 630 Ajax Avenue, Slough, SL1 4DG, United Kingdom |
Q4 2022 |
Operational / Colocation & Cloud Ecosystem Campus |
11.0 MW Total Utility Power Allocation |
|
|
Digital Realty LHR27 4.5MW Data Center Slough United Kingdom |
Slough Trading Estate, 631 Ajax Avenue, Slough, SL1 4DG, United Kingdom |
Q4 2022 |
Operational / Enterprise & Cloud Colocation Facility |
6.0 MW Total Utility Power Allocation |
|
|
GTR London GB One Campus 40.5MW Data Center Slough |
Slough Trading Estate, 654-662 Ajax Avenue, Slough, SL1 4BG, United Kingdom |
Q4 2026 |
Active Development / Phased Delivery |
50.0 MW Dedicated Substation Allocation |
|
|
CyrusOne Slough Campus 36MW Data Center United Kingdom |
225B & 225C Bath Road, Slough, SL1 5PP, United Kingdom |
Q4 2023 |
Operational / Hyperscale & Enterprise Colocation Campus |
54.0 MW Dedicated Utility Power Allocation |
|
|
China Mobile International London 10MW Data Center Slough |
Slough Trading Estate, 536 Ipswich Road, Slough, SL1 4EP, United Kingdom |
Q4 2020 |
Operational / Colocation & International Telecom Hub |
15.0 MVA Utility Substation Allocation |
|
|
Iron Mountain LON-3 25MW Data Center Slough |
Slough Trading Estate, 111 Buckingham Avenue, Slough, SL1 4PF, United Kingdom |
Q4 2027 |
Active Development / Phased Delivery |
30.0 MW Total Utility Power Allocation |
|
|
Rackspace London 3 10MW Data Center Slough |
Slough Trading Estate, 115 Buckingham Avenue, Slough, SL1 4PF, United Kingdom |
Q4 2013 |
Operational / Colocation & Managed Cloud Hub |
12.0 MW Dedicated Utility Power Allocation |
|
|
VIRTUS Slough Campus 145MW Data Center United Kingdom |
Slough Trading Estate, Slough, SL1 4PN, United Kingdom |
Q4 2026 |
Operational / Phased Expansion Campus |
185.0 MW Total Utility Power Allocation |
|
|
CyrusOne LON1 9MW Data Center Slough United Kingdom |
Slough Trading Estate, 12 Liverpool Road, Slough, SL1 4QA, United Kingdom |
Q4 2018 |
Operational / Colocation & Enterprise Cloud Hub |
15.0 MVA Total Utility Power Allocation |
|
|
Equinix Slough Campus Data Center London United Kingdom |
Slough Trading Estate (Buckingham Ave / Liverpool Rd / Banbury Ave), Slough, SL1 4LH, United Kingdom |
Q4 2021 |
Operational / Flagship Financial & Cloud Ecosystem Hub |
80.0+ MVA Total Utility Grid Capacity |
|
|
PolarDC HER01 40MW AI Data Center Porsgrunn Norway |
Herøya Industrial Park, Fjordgata 48, 3936 Porsgrunn, Telemark, Norway |
Q4 2028 |
Announced / Retrofit & Site Engineering Phase |
50.0 MW Substation Power Allocation |
|
|
Ferrovial MAD01 40MW AI Data Center Madrid Spain |
Av. del Monte Valdelatas, 10-16, 28108 Alcobendas, Madrid, Spain |
Q4 2029 |
Active Development / Earthworks Permitted |
60.0 MW Dedicated Grid Substation Allocation |
|
|
DC Mudarra 160MW Data Center Valladolid Spain |
Adjacent to San Lorenzo Wind Farms, Near La Mudarra Substation, 47660 Torrelobatón, Valladolid, Spain |
Q4 2030 |
Announced / Environmental Impact Assessment & Administrative Phase |
200.0 MW Grid & Co-Located Renewable Allocation |
|
|
T1 Energy Mo i Rana 50MW AI Data Center Norway |
Terminalveien 22, 8624 Mo i Rana, Norway |
Q4 2029 |
Active Redevelopment / Rezoned for Data Center Operations |
50.0 MW Dedicated Allocation (396.0 MW Queue Position) |
|
|
Techbau Trino 100MW Hyperscale Data Center Vercelli Italy |
Strada Provinciale 1 (SP1), km 10, 13025 Trino (Vercelli), Piedmont, Italy |
Q4 2029 |
Under Construction / Earthworks & Permitting Phase |
120.0 MW Grid Substation Allocation |
|
|
Unidata UniCenter 20MW Tier IV Data Center Rome |
Viale Alexandre Gustave Eiffel 100 / Ponte Galeria Area, 00148 Rome, Italy |
Q4 2028 |
Active Construction / Fit-Out Phase |
20.0 MW Total Substation Capacity Allocation |
|
|
Microsoft Grevenbroich Data Center 200MW North Rhine-Westphalia Germany |
Landesstraße 361, Grevenbroich, 41515, Germany |
Q4 2032 |
Planning / Land Acquisition Phase |
200.0 MW Initial Utility Allocation (Scalable up to 1,000.0 MW) |
|
|
noris network FRA1 Data Center 30MW Schwalbach Frankfurt Germany |
Am Kronberger Hang 2c, 65824 Schwalbach am Taunus, Frankfurt, Germany |
Q4 2029 |
Under Construction |
30.0 MW Total Grid Infrastructure Allocation |
|
|
LVL Energy Data Center 50MW Dabrowa Gornicza Katowice Poland |
Zygmunta Różyckiego, Tucznawa Investment Zone, 42-523 Dąbrowa Górnicza, Poland |
Q4 2030 |
Planned / Pre-Construction Stage |
50.0 MW Minimum Initial Grid Allocation (up to 200 MW connection request) |
|
|
Baltic Data Center Campus 3200MW Lublewko Pomeranian Poland |
Droga Wojewódzka 213 (DW213), 84-210 Lublewko, Pomeranian Voivodeship, Poland |
Q4 2032 |
Planned / Pre-Construction Stage |
3,200.0 MW Total Planned Utility Allocation (800 MW per stage) |
|
|
Monforte del Cid, Alicante / Valencia Region (03679, Spain) |
Polígono Las Norias, Calle Marrón Imperial, 03679 Monforte del Cid, Alicante, Spain |
Q4 2029 |
Planned / Pre-Construction Stage |
30.0 MW Initial Connection Allocation |
|
|
IREN Zamudio Data Center 30MW Bilbao Bizkaia Spain |
Polígono Industrial de Pinto / Biscay Science & Technology Park, 48170 Zamudio, Bizkaia, Spain |
Q4 2029 |
Permitted / Pre-Construction Stage |
30.0 MW Initial Grid Allocation (10 MW Phase 1 Buildout) |
|
|
DC Estate Malpica Campus 300MW Mora Toledo Spain |
Polígono Industrial Malpica, 45400 Mora, Toledo, Castilla-La Mancha, Spain |
Q4 2030 |
Permitted / Pre-Construction Stage |
300.0 MW IT Power Capacity (360.0 MW On-Site Generation Facility) |
|
|
Equinix MD2 Madrid Data Center Alcobendas Spain |
Calle Valgrande, 6, 28108 Alcobendas, Madrid, Spain |
Q4 2017 |
Operational |
8.0 MW Total Installed Utility Capacity |
|
|
Cheops Technology Canéjan Sovereign Cloud Data Center Bordeaux France |
37 Rue Thomas Edison, 33610 Canéjan, France |
Q4 2011 |
Operational |
1.0 MW Utility Supply / 0.6 MW IT Load |
|
|
EXA Edge DC Bordeaux Edge Colocation Data Center France |
Bassin à Flots, Bâtiment G2, 27 Quai Lawton, 33000 Bordeaux, France |
Q4 2008 |
Operational |
0.40 MW Utility Supply / 0.25 MW IT Load |
|
|
Assetel Data Center Zapopan Guadalajara 1MW |
C. Quetzalcóatl 512A, Cd del Sol, 45050 Zapopan, Jal., Mexico |
Q2 2015 |
Operational |
1.2 MW Utility Input / 0.8 MW Total IT Load Capacity |
|
|
Equinix AM9 Amsterdam Hyperscale IBX Data Center Netherlands |
Luttenbergweg 1, 1101 ED Amsterdam, Netherlands |
Q4 2032 |
Planned / Permitted |
~80.0 MW Total Campus Grid Allocation |
|
|
Krolmap Villanueva de Gállego Data Center Campus Zaragoza Spain |
Villanueva de Gállego Industrial District / A-1102 Corridor, 50830 Villanueva de Gállego, Zaragoza, Spain |
Q4 2032 |
Planned / Permitted |
~150.0 MW Total Utility Power Allocation |
|
|
3data V141 Data Center Moscow Varshavskoye |
Varshavskoye sh. 141c33, Moscow, 117405, Russia |
Q4 2026 |
Under Construction |
1.5 MW IT Power (2.5 MW Total Utility Capacity) |
|
|
AKADO Data Center Moscow Varshavskoye |
Varshavskoye Hwy, 133, Moscow, 117519, Russia |
Q4 2012 |
Operational |
3.0 MW IT Power (5.0 MW Total Utility Capacity) |
|
|
Atomdata 36MW Capacity Colocation Data Center Facility In Moscow |
Dorozhnaya Ulitsa, 9с1, Moscow, 117545, Russia |
Q4 2024 |
Operational |
25.0 MW IT Power (36.0 MW Total Utility Capacity) |
|
|
NUBES 3MW Capacity Colocation Data Center Facility In Moscow |
1-Ya Stekol'naya Ulitsa, 7, Moscow, 115404, Russia |
Q4 2022 |
Operational |
2.2 MW IT Power (3.0 MW Total Utility Capacity) |
|
|
TrustInfo 10MW Capacity Colocation Data Center Facility In Moscow |
Varshavskoye Hwy, 125c16, Moscow, 117587, Russia |
Q4 2008 |
Operational |
6.5 MW IT Power (10.0 MW Total Utility Power Capacity) |
|
|
Stack Telecom 12MW Capacity Colocation Data Center Facility In Moscow |
Varshavskoe highway 125 building 1, Moscow, 117587, Russia |
Q4 2012 |
Operational |
8.0 MW IT Power (12.0 MW Total Utility Power Capacity) |
|
|
3data 2MW Capacity Colocation Data Center Facility In Moscow |
ul. Butlerova, 17B, Moscow, 117342, Russia |
Q4 2015 |
Operational |
1.2 MW IT Power (2.0 MW Total Utility Capacity) |
|
|
Rostelecom 6.5MW Capacity Colocation Data Center Facility In Moscow |
Ulitsa Butlerova, 7, Moscow, 117485, Russia |
Q4 2013 |
Operational |
5.0 MW IT Power (6.5 MW Total Utility Power Capacity) |
|
|
Contell 1.5MW Capacity Colocation Data Center Facility In Moscow |
Nauchniy proezd 20, 2, Moscow, 117246, Russia |
Q4 2014 |
Operational |
1.0 MW IT Power (1.5 MW Total Utility Capacity) |
|
|
NeoServer 1.5MW Capacity Colocation Data Center Facility In Moscow |
Odesskaya Ulitsa, 2, Moscow, 117638, Russia |
Q4 2016 |
Operational |
1.0 MW IT Power (1.5 MW Total Utility Capacity) |
|
|
Tech.ru 2MW Capacity Colocation Data Center Facility In Moscow |
Nagatinskaya Ulitsa, 16к1с2, Moscow, 115487, Russia |
Q4 2015 |
Operational |
1.2 MW IT Power (2.0 MW Total Utility Power Capacity) |
|
|
MCN Telecom 1.5MW Capacity Colocation Data Center Facility In Moscow |
2nd Nagatinsky Drive, 2с8, Moscow, 115487, Russia |
Q4 2015 |
Operational |
1.0 MW IT Power (1.5 MW Total Utility Power Capacity) |
|
|
DataHouse 9.8MW Capacity Colocation Data Center Facility In Moscow |
Elektrolitnyy Proyezd, 3c47, Moscow, 115230, Russia |
Q4 2011 |
Operational |
6.5 MW IT Power (9.8 MW Total Utility Power Capacity) |
|
|
RackStore 2.5MW Capacity Colocation Data Center Facility In Moscow |
84/32 Profsoyuznaya Str, Moscow, 117997, Russia |
Q4 2010 |
Operational |
1.8 MW IT Power (2.5 MW Total Utility Power Capacity) |
|
|
CitySystems 1.5MW Capacity Colocation Data Center Facility In Moscow |
Leninskiy Prospekt, 53, Moscow, 119333, Russia |
Q4 2013 |
Operational |
1.0 MW IT Power (1.5 MW Total Utility Power Capacity) |
|
|
Friesen Elektra 400MW Capacity Colocation Data Center Facility In Sande |
Wasserstoffpark Friesland, 26452 Sande, Lower Saxony, Germany |
Q4 2030 |
Under Construction |
320.0 MW IT Load (400.0 MW Total Utility Power Capacity) |
|
|
Winda Energy 120MW Capacity Colocation Facility In Keminmaa |
Jäämerentie, Rajakangas, 94450 Keminmaa, Lapland, Finland |
Q4 2030 |
Permitting / Regulatory Review |
100.0 MW IT Power (120.0 MW Total Utility Power Capacity) |
|
|
FCDC Corp 50MW Capacity Colocation Facility In Rovaniemi |
Hietavaara Industrial Area, 96100 Rovaniemi, Lapland, Finland |
Q4 2030 |
Permitting / Regulatory Review |
40.0 MW IT Power (50.0 MW Total Utility Power Capacity) |
|
|
Rivington Energy 40MW Capacity Colocation Facility In Bristol |
Severn Road, Avonmouth, Bristol, BS11 0YL, United Kingdom |
Q4 2028 |
Permitting / Regulatory Review |
32.0 MW IT Power (40.0 MW Total Utility Power Capacity) |
|
|
Equinix AM7 18 MW Amsterdam Data Center Netherlands |
Kuiperbergweg 19, 1101 AE Amsterdam, Netherlands |
Q2 2019 |
Operational |
18.0 MW |
|
|
Equinix LD5 30 MW Slough Data Center United Kingdom |
8 Buckingham Avenue, Slough Trading Estate, SL1 4AX Slough, United Kingdom |
Q4 2018 |
Operational |
30.0 MW |
|
|
Digital Realty PAR7 32 MW La Courneuve Data Center Paris France |
1-3 rue Rateau, 93120 La Courneuve, France |
Q3 2022 |
Operational |
32.0 MW |
|
|
Google Eemshaven 300 MW Hyperscale Data Center Groningen |
Oostpolder 4, 9979 XT Eemshaven, Groningen, Netherlands |
Q4 2026 |
Operational / Under Expansion |
300.0 MW |
|
|
Google Hamina 350 MW Hyperscale Data Center Campus Finland |
Ensontie 1, 49420 Hamina, Finland |
Q4 2028 |
Operational / Under Major Expansion |
350.0 MW |
|
|
Google Dublin 180 MW Hyperscale Data Center Campus Ireland |
Grange Castle Business Park South, 22 Baldonnel Road, Clondalkin, Dublin 22, Ireland |
Q4 2028 |
Grange Castle Business Park South, 22 Baldonnel Road, Clondalkin, Dublin 22, Ireland |
180.0 MW |
|
|
Meta Clonee 300 MW Hyperscale Data Centre Campus Ireland |
Portan, Clonee, Co. Meath, D15 P2RV, Ireland |
Q4 2026 |
Operational / Under Expansion |
300.0 MW |
|
|
Meta Odense 200 MW Hyperscale Data Center Denmark |
Odense in Funen, Denmark |
Q4 2025 |
Operational / Under Expansion |
200.0 MW |
|
|
Meta Lulea 300 MW Hyperscale Data Center Sweden |
Datavägen 15, 977 54 Luleå, Norrbotten, Sweden |
Q4 2024 |
Operational / Under Expansion |
300.0 MW |
|
|
Applied Digital 1 GW AI Factory Data Center Campus Finland |
Kajaani / Northern Finland Industrial Zone, Finland |
Q4 2030 |
Announced / Under Development |
1000.0 MW (1.0 GW) |
|
|
Equinix FR5 25 MW Frankfurt Data Center Germany |
Kleyerstrasse 90, 60326 Frankfurt, Germany |
Q4 2018 |
Operational |
25.0 MW |
|
|
VIRTUS LONDON19 40 MW Slough Data Center United Kingdom |
Slough Trading Estate, Slough, SL1 4DX, United Kingdom |
Q4 2027 |
Under Construction |
40.0 MW |
|
|
Pure DC SJK01 550 MW AI Data Center Campus Seinäjoki Finland |
Seinäjoki Data Park, Seinäjoki, Southern Ostrobothnia, Finland |
2032+ |
Under Construction / Phased Buildout |
700.0+ MVA Grid Connection (550.0 MW IT Capacity) |
|
|
DayOne Lahti Data Center 128 MW Hyperscale Campus Finland |
Väinämöisentie 2, 15170 Lahti, Finland |
2028 |
Under Construction |
150 MW Grid Provisioning (128 MW Total IT Capacity) |
|
|
Nscale Loughton Data Center 90 MW AI Campus Essex UK |
Langston Road, Loughton, Essex IG10 3TQ / IG10 3SD, United Kingdom |
2028 |
Announced / Under Development (Planning Approved) |
50 MW Initial Provisioning (Scalable up to 90 MW Total Electrical Allocation) |
|
|
Panattoni Barcelona DC01 42MW Data Center Campus |
Parc de l’Alba, BP-1413, 08290 Cerdanyola del Vallès, Barcelona, Spain |
Q4 2028 |
Under Construction / Permitted |
42 MW (Phase 1) / 88 MW (Full Campus Capacity) |
|
|
Compute Nordic Mikkeli AI Data Center 165MW Finland |
Suonsaarentie 2, Visulahti Industrial Zone, 50180 Mikkeli, Finland |
Q4 2028 |
Under Construction |
212.0 MW Gross Utility Power Allocation |
|
|
Nation Data Center Vélizy 6MW Paris Facility |
8 Avenue Morane Saulnier, 78140 Vélizy-Villacoublay, France |
Q4 2022 |
Operational |
6.0 MW Gross Utility Power Allocation |
|
|
Verne Mäntsälä Data Center 70MW Campus Finland |
Gneissitie, Kapuli Business Park, 04620 Mäntsälä, Finland |
Q4 2028 |
Under Construction |
70.0 MW Gross Utility Power Allocation |
|
|
Vaultica MIL03 Data Center 24MW Milan |
Via Marisa Bellisario, 20019 Settimo Milanese MI, Italy |
Q4 2027 |
Under Construction / In Development |
24.0 MW Gross Utility Power Allocation |
|
|
Green Mountain FRA1 Mainz Data Center 54MW Frankfurt Region |
Kraftwerkallee 1, 55120 Mainz, Germany |
Q4 2027 |
Under Construction |
80.0 MW Gross Utility Power Allocation |
|
|
DATA4 Frankfurt Campus FRA01 Data Center 180MW Hanau |
Depotstraße, Grossauheim, 63457 Hanau, Hesse, Germany |
Q4 2030 |
Under Construction / Groundbroken |
180.0 MW Gross Utility Power Allocation |
|
|
Quetta DC Tres Cantos 16MW Madrid Campus |
Ronda de Valdecarrizo 8, 28760 Tres Cantos, Community of Madrid, Spain |
Q4 2026 |
Under Construction / In Development |
16.0 MW Gross Utility Power Allocation |
|
|
Colt Paris Villebon Campus Data Center 24MW Île-de-France |
20 Avenue du Québec, Courtabœuf Industrial Park, 91140 Villebon-sur-Yvette, Île-de-France, France |
Q4 2026 |
Operational / Expanding |
30.0 MW Gross Utility Power Allocation |
|
|
Echelon LIN10 Campus Data Center 250MW Milan |
Via della Costa 2, 24047 Treviglio, Province of Bergamo, Lombardy, Italy |
Q4 2029 |
Under Construction / In Development |
250.0 MW Gross Utility Power Allocation |
|
|
ADAM Data Center BCN3 Parc de l’Alba 8MW Barcelona |
Parc de l’Alba Sincrotró, 08290 Cerdanyola del Vallès, Barcelona, Spain |
Q4 2027 |
Under Construction / Groundbroken |
8.0 MW Gross Utility Power Allocation |
|
|
XTX Markets Kajaani Building 3 Data Center 22.5MW Finland |
XTX Finland Oy, Sokajärventie 24, 87100 Kajaani, Finland |
2027 |
Under Construction / Fit-Out Phase |
25.0 MW Gross Utility Power Allocation |
|
|
Ebbsfleet AI Data Centre Campus 300MW Kent |
C8CG+4XH Gravesend, United Kingdom |
2033 |
Announced / In Planning (NSIP DCO Process) |
300.0 MW Gross Utility Power Allocation |
|
|
CX Technology Campus Chapelcross Data Centre 1GW Scotland |
Former Chapelcross Nuclear Power Station site, B722, near Annan, Dumfries and Galloway DG12 6RF, Scotland, United Kingdom |
2035 |
Announced / In Planning (Planning Permission in Principle Application Submitted) |
1,000.0 MW (1.0 GW) Gross Utility Power Allocation |
|
|
Denham Data Centre Campus 100MW Buckinghamshire |
Denham Court Drive, Denham, Buckinghamshire UB9 5PG, United Kingdom |
Q4 2030 |
Announced / In Planning |
100.0 MW Gross Utility Power Allocation |
|
|
Project Blackwater Campus Data Center Chelmsford Essex |
Beaulieu Park, Loverose Way, Chelmsford, Essex CM3 3HR, United Kingdom |
Q4 2030 |
Announced / In Planning |
90.0 MW Gross Utility Power Allocation |
|
|
Elevate Quarter Data Centre Campus 55MW Stevenage |
Gunnels Wood Road, Stevenage, Hertfordshire SG1 2FX, United Kingdom |
2029 |
Under Construction / Development Phase |
55.0 MW Gross Utility Power Allocation |
|
|
Wycombe Film Studios Data Centre Campus High Wycombe |
Wycombe Air Park, Clay Lane, Booker, High Wycombe, Buckinghamshire SL7 3DP, United Kingdom |
2031 |
Approved / Planning Permission Minded-to-Grant (Outline) |
75.0 MW Gross Utility Power Allocation |
|
|
CyrusOne LON6 Data Centre Campus 210MW Iver Heath UK |
Seven Hills Road, Iver Heath, Buckinghamshire SL0 0PA, United Kingdom (Historic site adjacent to Shannon Training |
2032 |
Approved / Planning Granted |
210.0 MW Gross Utility Power Allocation |
|
|
NTT GDC Berlin 3 Data Center Campus Brieselang Brandenburg |
Brieselang, Brandenburg 14656, Germany (Exact site coordinates proprietary / confidential industrial zone approx. 30 km west of central Berlin) |
2031 |
Under Development / Master Planning Phase |
Multi-Megawatt Gross Utility Power Allocation |
|
|
EdgeConneX Skelleftea Campus Data Center 1GW Sweden |
Torsgatan 122, Bergsbyn, Skellefteå 931 36, Sweden (Exact building coordinates within Lyten Industrial Hub proprietary) |
2034 |
Announced / Site Acquisition & Pre-Development Phase |
1,000.0 MW (1.0 GW) Gross Utility Power Allocation |
|
|
EcoDataCenter Smedjebacken Campus Data Center 150MW Dalarna |
Nya Humbobergsvägen, Smedjebacken, Dalarna County 777 34, Sweden |
2031 |
Announced / Permitting & Pre-Development Phase |
150.0 MW Gross Utility Power Allocation |
|
|
Digital Realty Ankara Data Center Campus 22MW Türkiye |
Ankara, Türkiye (Exact secure street address and parcel coordinates are proprietary / confidential) |
2030 |
Announced / Initial Development & Planning Phase |
22.0 MW Gross Utility Power Allocation |
|
|
Nscale Harjavalta Campus Data Center 100MW Finland |
Hiittenkiukaantie and Valtaväylä (Highway 2), Sievari Industrial Area, Harjavalta 29200, Finland |
2029 |
Approved / Site Acquisition & Pre-Construction Phase |
100.0 MW Gross Utility Power Allocation |
|
|
VOLT Rotterdam AI Gigafactory Data Center 800MW Netherlands |
Markweg, Europoort Rotterdam, Port of Rotterdam, 3198 LK Rotterdam, South Holland, Netherlands |
2033 |
Announced / Pre-Development & Master Planning Phase |
800.0 MW Gross Utility Power Allocation |
|
|
DATA4 Athens Campus ATH01 Data Center 90MW Peania Greece |
Agiou Louka 33, Peania 190 02, Attica, Greece (7.5-hectare campus footprint in Peania industrial zone) |
2030 |
Under Construction (Groundbroken November 2024) |
90.0 MW Gross Utility Power Allocation90.0 MW Gross Utility Power Allocation |
|
|
GTR London GB Two Campus Data Centre Southall London |
International Trading Estate, Southall, London UB2 5LB, United Kingdom |
2031 |
Approved / Pre-Construction & Site Preparation Phase |
Multi-Megawatt Utility Power Allocation |
|
|
Ark Data Centres Elstree Campus Data Center 200MW Watford UK |
A41 Watford Bypass, former Mercure Hotel Site (Hilfield Park), Watford, Hertfordshire WD25 8JH, United Kingdom |
2033 |
Announced / Planning & Pre-Development Phase |
200.0 MW Gross Utility Power Allocation |
|
|
Sesterce Bosquel AI Data Center 1GW Hauts-de-France |
Rue d’Amiens, 80160 Bosquel, Somme, Hauts-de-France, France |
2033 |
Announced / Site Master Planning & Environmental Permitting Phase |
1,000.0 MW (1.0 GW) Gross Utility Power Allocation |
|
|
DCP Munich 1 Data Center 18MW Unterschleissheim Bavaria |
Carl-Linde-Straße, 85716 Unterschleißheim, Bavaria, Germany (10,000 m² total gross building area) |
2030 |
Pre-Development & Master Planning Phase |
30.0 MVA Gross Utility Power Allocation |
|
|
Risti Data Center Campus 400MW Lääne-Nigula Estonia |
Kolge tee, 90904 Risti, Lääne-Nigula, Lääne County, Estonia |
2032 |
Pre-Development & Site Master Planning Phase (Detailed Plan Application Filed March 2026; Joint Venture Expanded September 2026) |
400.0 MW Gross Utility & Renewable Power Allocation (180.0 MW Phase 1 Capacity) |
|
|
GDD Schladen-Werla Data Center Campus 120MW Lower Saxony Germany |
Marktteichweg 2, 38315 Schladen-Werla, Lower Saxony, Germany |
2031 |
Pre-Development & Urban Land Use Planning Phase (Resolution on Development Plan Initiated) |
120.0 MW Gross Utility Power Allocation |
|
|
Switch Datacenters WAW1 Data Center 20MW Warsaw Poland |
Kręta 39–37, 05-850 Mory, near Warsaw, Masovian Voivodeship, Poland (Strategic connectivity corridor west of Warsaw) |
2030 |
Pre-Development & Site Master Planning Phase |
20.0 MW Gross Utility Power Allocation |
|
|
IREN Cáceres Data Center Campus 70MW Extremadura Spain |
Polígono Industrial Las Capellanías, 10005 Cáceres, Extremadura, Spain (Part of the CCGreen Eco-Industrial Master Plan) |
2030 |
Pre-Development & Site Permitting Phase (Acquired via Ingenostrum transaction in June 2026) |
100.0 MW Gross Utility Power Allocation |
|
|
DNA Oulu Torikatu Data Center 2MW Northern Finland |
Torikatu 18, 90100 Oulu, Northern Ostrobothnia, Finland (Downtown Oulu telecom & edge corridor) |
Operational |
Operational Facility / Regional Telecom & Edge Colocation Hub |
2.0 MW Gross Utility Power Allocation |
|
|
Trevian Leväsuo Data Center Oulu Northern Finland |
Elektroniikkatie 10, 90590 Oulu, Northern Ostrobothnia, Finland |
2029 |
Pre-Development & Master Planning Phase (Brownfield Redevelopment) |
20.0 MW Gross Utility Power Allocation |
|
|
Glesys Oulu Data Center Elektroniikkatie Northern Finland |
Elektroniikkatie 13–15, 90590 Oulu, Northern Ostrobothnia, Finland |
Operational |
Operational Facility (Acquired via Oulun DataCenter Oy integration) |
0.7 MW Gross Utility Power Allocation |
|
|
Glesys Oulu Rusko Data Center Campus 300MW Finland |
Kaapelitie 4, 90620 Oulu, Northern Ostrobothnia, Finland |
2032 |
Pre-Development & Site Master Planning Phase (Partnership Announced June 2026) |
300.0 MW Gross Utility Power Allocation |
|
|
Arcem Oulu Johdintie Data Center Campus Northern Finland |
Johdintie, Ruskonselkä Industrial District, 90620 Oulu, Northern |
2031 |
Pre-Development & Site Reservation Phase (Feasibility Study Phase) |
150.0 MW Gross Utility Power Allocation |
|
|
Meta Ii Data Center Campus Kivijärvensuo Finland |
Kivijärvensuo, 91150 Kärppäsuo, Municipality of Ii, Northern Ostrobothnia, Finland ( |
2033 |
Land Banked / Pre-Development & Site Master Planning Phase |
450.0 MW Gross Utility Power Allocation |
|
|
BiltTek Veitsiluoto Data Center Kemi Finland |
Poikkitie 6, 94800 Kemi, Lapland, Finland |
2031 |
Pre-Development & Industrial Conversion Phase |
100.0 MW Gross Utility Power Allocation |
|
|
BiltTek Tervaharju Edge & Grid-Adaptive Data Center |
Kiveliönkatu, Tervaharju District, 94700 Kemi, Lapland, Finland |
2027 |
Permitted / Pre-Development Phase (Permit Granted August 2025) |
10.0 MW Gross Utility Power Allocation |
|
|
AiOnX Örträsk Sustainable AI Compute Facility |
Länsväg AC 845, 935 93 Norsjö, Örträsk District, Västerbotten County, Sweden |
2029 Target |
Operational & Active Expansion Phase (Pivoted to High-Density AI Compute) |
100.0 MW Gross Utility Power Allocation (7.5 MW Operational Phase) |
|
|
EcoDataCenter Piteå Arctic Data Center Campus |
Träskåsvägen 229, 943 36 Piteå (Hortlax), Norrbotten County, Sweden |
Operational (4.5 MW Active Envelope) |
Operational & Active Expansion Phase |
4.5 MW Gross Utility Power Allocation |
|
|
PureDC Madrid Meco Flagship Hyperscale Campus |
Calle Zeus 19–17, 28880 Meco, Community of Madrid, Spain |
2029–2030 |
Under Construction Phase (Phase 1 Groundbreaking November 2025) |
70.0 MW Gross Utility Power Allocation (30.0 MW Phase 1 / 40.0 MW Phase 2) |
|
|
AVAIO Digital Algete Data Hub Campus |
Algete Industrial Zone, 28119 Algete, Community of Madrid, Spain |
2030 |
Active Development / Permitting & Pre-Construction Phase |
64.0 MW Gross Utility Power Allocation (51.2 MW Critical IT Load) |
|
|
Art Data Centre Ennis Hyperscale AI Campus |
R352 Road (Toberteascane / Toureen), off the N18/M18 Corridor, Ennis, County Clare, Ireland |
2032–2033 |
Permitted / Pre-Construction Phase (Supreme Court Clearance October 2026) |
200.0 MW Gross Utility Power Allocation (Six 33.3 MW Data Center Halls) |
|
|
Cisco Krakow R&D & AI Innovation Data Center |
Kraków Technology Park / Special Economic Zone Region, Kraków, Lesser Poland Voivodeship 30-707, Poland |
2026 |
Active Development / Construction Phase (Groundbroken July 2026) |
5.0 MW Gross Utility Power Allocation (4.0 MW Critical IT Load) |
|
|
T.Loop Hanko Data Energy Center (DEC) |
Hanko Eastern Industrial Area, 10960 Hanko, Uusimaa Region, Finland |
2028–2029 |
Active Development / Expansion Phase (Announced May 2026) |
20.0 MW Gross Utility Power Allocation (16.0 MW Critical IT Load) |
|
|
Equinix IL3 9 MW Data Center Istanbul Türkiye |
Dudullu Organized Industrial Zone (Dudullu OSB), Ümraniye, Istanbul 34775, Türkiye |
Q3 2026 |
Under Construction |
9 MW facility power capacity |
|
|
Equinix LD14 30 MW Data Center Slough London |
11 Banbury Avenue (9-13 Banbury Avenue), Slough Trading Estate, Slough, Berkshire SL1 4LH, United Kingdom |
Q1 2027 |
Under Construction |
30 MW facility power capacity |
|
|
Equinix PA12x xScale Data Center Paris France |
18-82 Rue de Montigny, 95100 Argenteuil, Paris, France |
Q2 2026 |
Under Construction |
Not publicly disclosed |
|
|
Equinix PA14 Data Center Aubervilliers Paris |
Rue du Corindon, 93300 Aubervilliers, Paris, France |
Q2 2028 |
Under Construction |
Not publicly disclosed |
|
|
Equinix DB7x Dublin Data Center |
Blanchardstown Corporate Park / Ballycoolin Zone, Blanchardstown, Dublin 15, Ireland |
2027–2028 |
Under Construction |
12.5 MW Gross Utility Power Allocation (10.0 MW Critical IT Load) |
|
|
Equinix PA13x Paris xScale Data Center |
9 Avenue du Maréchal Juin, 92190 Meudon, Hauts-de-Seine, Île-de-France, France |
February 2025 |
Fully Operational |
35.0 MW Gross Power Allocation (28.8 MW Critical IT Capacity) |
|
|
Equinix IL4 Istanbul International Business Exchange |
Dudullu OSB, 3. Cadde, No. 4, Yukarı Dudullu, 34776 Ümraniye, İstanbul, Türkiye |
Operational |
Fully Operational |
7.5 MW |
|
|
AWS DUB Clonshaugh Data Center Campus |
Clonshaugh Business & Technology Park, Priorswood, Dublin 17, Ireland |
Operational Multi-Building Expansion Campus |
Fully Operational |
~165.0 MW Combined Gross Utility Allocation (~132.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Hibernian Data Center Campus |
Hibernian Industrial Estate, 30A Greenhills Road, D24 TW42 Kilnamanagh, Dublin, Ireland |
Operational Multi-Building Expansion Campus |
Fully Operational / Active Multi-Building Campus Expansion |
120.0 MW Combined Gross Utility Power Allocation (96.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Mulhuddart Data Center Campus |
Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland |
Operational Multi-Building Expansion Campus |
Active Development and Multi-Building Operational Campus Phase |
175.0 MW Combined Gross Utility Allocation (140.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Tallaght Data Center Campus |
Airton Road / Belgard Road (Former Jacob's Biscuits Industrial Site), Tallaght, Dublin 24, D24 DA27, Ireland |
Operational Multi-Building Expansion Campus |
Fully Operational |
55.0 MW Combined Gross Utility Power Allocation (45.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Airton 1 Data Center |
Airton Road, Tallaght, Dublin 24, D24 F200, Ireland |
Operational |
Fully Operational / Active Node |
27.5 MW Gross Utility Power Allocation |
|
|
AWS DUB Airton 2 Data Center |
Airton Road / Belgard Road (Building 2 West), Tallaght, Dublin 24, D24 DA27, Ireland |
Operational |
Fully Operational / Active Node |
28.5 MW Gross Utility Power Allocation (23.0 MW Critical IT Capacity) |
|
|
AWS DUB Blanchardstown 1 Data Center |
Blanchardstown Corporate Park / Industrial Park, Snugborough Road, Blanchardstown, Dublin 15, Ireland |
Operational |
Fully Operational / Active Core Node |
30.0 MW Gross Utility Power Allocation |
|
|
AWS DUB Blanchardstown 2 Data Center |
Blanchardstown Corporate Park / Industrial Park, Snugborough Road, Blanchardstown, Dublin 15, Ireland |
Operational |
Fully Operational |
30.0 MW Gross Utility Power Allocation (24.0 MW Critical IT Capacity) |
|
|
AWS DUB Hibernian 5 Data Center |
Hibernian Industrial Estate, 30A Greenhills Road, D24 TW42 Kilnamanagh, Dublin, Ireland |
Operational |
Fully Operational |
25.0 MW Gross Utility Power Allocation (20.0 MW Critical IT Capacity) |
|
|
AWS DUB Kildare Innovation Campus Data Center |
Kildare Innovation Campus, Barnhall, Leixlip, County Kildare, W23 X5R2, Ireland |
2028 Target |
Active Development |
150.0 MW Combined Gross Utility Allocation (120.0 MW Total Critical IT Capacity) |
|
|
AWS DUB Mulhuddart 1 Data Center |
Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland |
Operational |
Fully Operational / Active Node |
35.0 MW Gross Utility Power Allocation (28.0 MW Critical IT Capacity) |
|
|
AWS DUB Mulhuddart 2 Data Center |
Cruiserath Road, Mulhuddart, Dublin 15, D15 A6RX, Ireland |
Operational |
Fully Operational / Active Node |
35.0 MW Gross Utility Power Allocation (28.0 MW Critical IT Capacity) |
|
|
CDC San Mateo Data Center Campus |
Polígono Industrial Río Gállego, San Mateo de Gállego, Zaragoza 50840, Spain |
2035 |
Active Development / Permitted Master-Planned Campus Phase |
570.0 MW Combined Gross Utility Allocation (456.0 MW Total Critical IT Capacity) |
|
|
BXIA Data Center Campus Bordeaux |
Parc des Expositions de Bordeaux, Cours Jules Ladoumègue, 33300 Bordeaux, France |
2033 |
Active Development |
380.0 MW Combined Gross Utility Allocation (250.0 MW Total Critical IT Capacity) |
|
|
Frankfurt DATA FFO AI Campus |
Müllroser Chaussee, 15234 Frankfurt (Oder), Brandenburg, Germany |
2033 |
Active Development / Permitted Master-Planned Campus Phase |
400.0 MW Combined Gross Utility Allocation (320.0 MW Total Critical IT Capacity) |
|
|
Telis Lower Saxony Data Center Campus |
Hämelerwalder Straße (L413), North of Mehrum, 31249 Hohenhameln, Lower Saxony, Germany |
2034 |
Planned |
500.0 MW Combined Gross Utility Allocation (400.0 MW Total Critical IT Capacity) |
|
|
Eclairion La Maxe Data Center |
Chemin Thury, 57140 La Maxe, Moselle, France |
2030 |
Active Development / Permitted Master-Planned Campus Phase |
250.0 MW Combined Gross Utility Allocation (200.0 MW Total Critical IT Capacity) |
|
|
DATA4 Cambrai Data Center Campus |
Parc E-Logistique Épinoy-Cambrai (Base Aérienne 103), 62860 Épinoy, France |
2035 |
Active Development / Permitted Master-Planned Campus Phase |
1000.0 MW Combined Gross Utility Allocation (800.0 MW Total Critical IT Capacity) |
|
|
Digital Realty Paris PAR14 Data Center |
14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France |
2021 |
Fully Operational |
3.2 MW Combined Gross Utility Allocation (2.4 MW Total Critical IT Capacity) |
|
|
Digital Realty Paris PAR15 Data Center |
Rue Sébastien et Jacques Lorenzi, 93440 Dugny, France |
2030 |
Under Construction / Active Groundbreak Phase |
82.5 MW Gross Utility Allocation (66.0 MW Total Critical IT Capacity for PAR15) |
|
|
Digital Realty Paris PAR16 Data Center |
Rue Sébastien et Jacques Lorenzi, 93440 Dugny, France |
2030 |
Active Development |
68.8 MW Combined Gross Utility Allocation (55.0 MW Total Critical IT Capacity for PAR16) |
|
|
Era4 Shelford Data Center Canterbury |
Shelford Farm Estate, Shalloak Rd CT2 0PRCanterbury |
2027 |
Permitted |
7.2 MW Combined Gross Utility Allocation |
|
|
Humber Tech Park Data Center Campus |
A160 and Habrough Road, South Killingholme, North Lincolnshire DN40 3BA, United Kingdom |
2030 |
Permitted |
384.0 MW Total Critical IT Capacity (Gross Utility Allocation NA) |
|
|
Southside Data Centre Campus Scottish Borders |
Land near Clawbare Cottage, Longformacus, near Duns, Scottish Borders, Scotland TD11 3PG, United Kingdom |
NA |
Pre-Application / Environmental Impact Assessment (EIA) & Public Consultation Phase |
225.0 MW Combined Gross Power Capacity (Critical IT Load NA) |
|
|
Dugny Digital Realty Digital Hub Data Center Campus |
Place Sébastien et Jacques Lorenzi, 93440 Dugny, Seine-Saint-Denis, France |
NA |
Under Construction |
Critical IT Load NA (Gross Utility Allocation NA) |
|
|
Sembcorp Teesside Data Center Campus |
Wilton International, Greystones Roundabout, Lazenby, Teesside TS6 8JF, United Kingdom |
NA |
Permitted |
280.0 MW Total Critical IT Capacity (Gross Utility Allocation NA) |
|
|
VIRTUS Saunderton Data Centre Campus Buckinghamshire |
Haw Lane, Saunderton, Buckinghamshire HP14 4JD, United Kingdom |
2027 |
Under Construction |
78.0 MW Total Critical IT Capacity |
|
|
Conesby Data Centre Campus Scunthorpe |
Normanby Road, Foxhills Industrial Estate, Scunthorpe, North Lincolnshire DN15 9BE, United Kingdom |
NA |
Permitted |
180.0 MW Total Critical IT Capacity (Gross Utility Allocation NA) |
|
|
Graven Hill Data Center Campus Bicester |
Anniversary Avenue, Ambrosden, Bicester, Oxfordshire OX26 6HF, United Kingdom |
NA |
Permitted |
290.0 MW Total Critical IT Capacity (435.0 MW Gross Utility Capacity Allocation) |
|
|
Digital Realty DUS1 Data Center Zagreb |
In der Steele 25–45, 40599 Düsseldorf, North Rhine-Westphalia, Germany |
2009 |
Fully Operational |
2.3 MW Critical IT Capacity Allocation |
|
|
Digital Realty DUS2 Data Center Düsseldorf |
In der Steele 39–45, 40599 Düsseldorf, North Rhine-Westphalia, Germany |
2013 |
Fully Operational |
3.5 MW Critical IT Capacity Allocation |
|
|
Digital Realty ATH3 Data Center Athens Koropi |
Ifestou 74 (Varis Koropiou Avenue), Koropi 194 00, Attica, Athens, Greece |
2023 |
Fully Operational |
6.8 MW Critical IT Capacity (10.0 MW Gross Power Allocation) |
|
|
Digital Realty DUB10 Data Center Dublin Blanchardstown |
Unit 9, Blanchardstown Corporate Park, Dublin 15, Ireland |
2018 |
Fully Operational |
10.0 MW Critical IT Load (15.0 MW Gross Power Allocation) |
|
|
Digital Realty DUB11 Data Center Dublin Clonshaugh |
Unit 1, Clonshaugh Business & Technology Park, Dublin 17, Ireland |
2020 |
Fully Operational |
12.0 MW Critical IT Load (18.0 MW Gross Power Allocation) |
|
|
Echelon Kilmeaden Campus Data Center Waterford |
R680 Road, Kilmeaden, County Waterford, Ireland |
2030 |
In Planning |
300.0 MW Critical IT Load (500.0 MW Gross Power Allocation Master Plan) |
|
|
APL Varkaus Data Center Campus Finland |
Pöppökalliontie, 78400 Varkaus, North Savo, Finland |
2029 |
In Planning |
60.0 MW Critical IT Load (100.0 MW Gross Power Capacity Allocation) |
|
|
Sesterce Jämsä Data Center Campus Finland |
Former Kaipola Paper Mill Site, Tehtaankatu 1, Jämsä 42220, Central Finland |
2029 |
In Planning |
400.0 MW Critical IT Load (600.0 MW Gross Power Allocation Master Plan) |
|
|
Equinix Wexham Road Campus Data Center Slough |
Wexham Road, Slough, Berkshire SL2 5DS, United Kingdom |
2030 |
In Planning / Master Development Phase |
50.0 MW Critical IT Load (75.0 MW Gross Power Allocation Master Plan) |
|
|
Microsoft Langley Data Center Slough Berkshire |
Langley Business Centre, 6A Station Road, Langley, Berkshire SL3 8DS, United Kingdom |
2031 |
In Planning |
40.0 MW Critical IT Load (60.0 MW Gross Power Allocation Master Plan) |
|
|
ADA London Docklands LCY01 Data Center |
St Vincent Ferrer Lane, Silvertown, London E16 2AP, United Kingdom |
2030 |
In Planning |
210.0 MW Critical IT Load (250.0 MW Gross Power Allocation Master Plan) |
|
|
FlexBase Technology Center AI Data Center Laufenburg |
Former Swissgrid Site, Werkstrasse 12, 5080 Laufenburg, Canton of Aargau, Switzerland |
2028 |
Under Construction |
100.0 MW Critical IT Capacity (150.0 MW Gross Power Allocation; Integrated with 1.2 GW Redox Flow Battery System) |
|
|
Firstcolo Data Center Rosbach FRA7 Germany |
Hertha-Sponer-Straße, 61191 Rosbach vor der Höhe, Hesse, Germany |
2029 |
Under Construction |
18.0 MW Critical IT Load (24.0 MW Gross Power Allocation Master Plan) |
|
|
MasterDC Kanice AI Data Center Czech Republic |
Kanice 176, 664 01 Kanice, South Moravian Region, Czech Republic |
2029 |
Under Construction |
4.0 MW Critical IT Load (25.0 MW Gross Power Allocation Master Plan) |
|
|
Turksat Golbasi Data Center Ankara |
40th km, Ankara–Konya Road, Gölbaşı, Ankara 06830, Türkiye |
2029 |
Under Construction |
21.0 MW Critical IT Load (33.0 MVA Gross Utility Power Capacity) |
|
|
CRA Prague Gateway Data Center |
Jíloviště 178, 252 02 Jíloviště, Czech Republic |
2030 |
Under Construction |
17.3 MW Critical IT Load (26.0 MW Gross Power Allocation; 44.0 MW Grid Reserve) |
|
|
NXDATA-3 Bucharest Data Center Romania |
38 Bucharest Ring Road (Șoseaua de Centură București Nr. 38), Tunari, Ilfov 077180, Romania |
2027 |
Under Construction |
4.0 MW Critical IT Load (5.0 MW Gross Power Allocation) |
|
|
Digital Realty ZUR1 Zurich Data Center |
Sägereistrasse 29 & 35, 8152 Glattbrugg, Switzerland |
Operational |
Operational |
12.0 MW Critical IT Load (18.0 MW+ Gross Campus Utility Power Allocation) |
|
|
Digital Realty ZUR2 Zurich Data Center |
Bäulerwisenstrasse 4, 8152 Glattbrugg, Switzerland |
Operational |
Operational |
12.0 MW Critical IT Capacity (Up to 150 kW per Rack Density Support) |
|
|
Digital Realty ZUR3 Zurich Data Center |
Bäulerwisenstrasse 6, Building 2, CH-8152 Glattbrugg, Switzerland |
2022 |
Operational |
24.0 MW Critical IT Capacity (25.0 MW+ Gross Building Utility Power Allocation) |
|
|
Digital Realty ZUR4 Zurich Data Center |
Bäulerstrasse 6, CH-8152 Glattbrugg, Switzerlandz |
2028 |
Under Construction |
15.0 MW Critical IT Capacity (20.0 MW+ Gross Building Utility Power Allocation) |
|
|
NorthC Frankfurt 1 Data Center Germany |
Mainzer Landstraße 695, 65934 Frankfurt am Main, Germany |
Operational |
Operational |
4.0 MW – 6.0 MW Critical IT Capacity (10.0 MW+ Gross Utility Power Allocation) |
|
|
NxN Datacenter Madrid Hortaleza Spain |
Calle de las Abelias 1, Hortaleza, Madrid 28042, Spain |
2026 |
Operational |
7.5 MW Critical IT Capacity in 2N Redundant Configuration (15.0 MW Total Gross Power Allocation) |
|
|
YEXIO Dorfen Data Center Germany |
Zieglhaus 3, Gewerbegebiet Dorfen Süd-West, 84405 Dorfen, Germany |
2028+ |
Under Construction |
4.0 MW Planned Full Buildout IT Capacity (2.0 MW Initial Phase 1 IT Load) |
|
|
QTS Cambois Data Center Campus Northumberland |
Former Blyth Power Station Site, Cambois, Blyth, Northumberland NE24 1BG, United Kingdom |
2035 |
Under Construction |
720.0 MW Critical IT Load / 1,100.0 MW Gross Power |
|
|
QTS Eemshaven Data Center Netherlands |
Huibertgatweg 2, 9979 XZ Eemshaven, Groningen, Netherlands |
2026 – 2027 |
Operational |
36.0 MW+ Critical IT Load (Doubling via EEMSDC2) |
|
|
QTS Forssa Data Center Campus Finland |
Ratasmäki Industrial Area, 30100 Forssa, Finland |
NA |
Planned |
Up to 450.0 MW Planned IT Load |
|
|
Playmobil Digital Data Center Campus Dietenhofen Germany |
Former Playmobil Production Site, Neustädter Straße 26, 90599 Dietenhofen, Middle Franconia, Bavaria, Germany |
NA |
Planned / Brownfield Industrial Redevelopment |
100.0 MW Initial Connection Capacity (Expandable) |
|
|
Northern Energy Riihimäki Data Center Finland |
Riihimäenportti VI, Intersection of Hämeenlinnantie & Lahdentie, Riihimäki, Kanta-Häme, Finland |
2033 |
Proposed / Preliminary Land Agreement & Zoning Preparation |
NA |
|
|
Minreal Kankaanpää AI Data Center Finland |
Ruukinkatu Industrial Area, Kankaanpää, Satakunta, Finland |
NA |
Planned |
40.0 - 45.0 MW |
|
|
Meridian One Data Center Campus West Sussex UK |
Jobs Lane, Hickstead, West Sussex RH17 5NZ, United Kingdom |
2036 (10-Year Indicative Horizon) |
Planned |
100.0 MW |
|
|
Fortum Pispantalli Data Center Campus Valkeakoski Finland |
Pispantalli, Valkeakoski, Pirkanmaa, Finland |
NA |
Planned |
800.0 MW |
|
|
Durham Technology Park Data Center Campus Seaham UK |
Murton Lane, between South Hetton, Murton and Easington Lane, Seaham, County Durham SR7 9TN, United Kingdom |
NA |
Planned |
500.0 MW |
|
|
Agios Dimitrios PPC-AWS Data Center Campus Kozani Greece |
Agios Dimitrios Power Plant, Ellispontos, Kozani 501 00, Western Macedonia, Greece |
2031 |
Planned |
300.0 MW |
|
|
Northern Europe Energy Salaspils Data Center Latvia |
Riga, Latvia, EU |
Info is not publicly available |
Planned |
Over 200.0 MW |
|
|
Heim 01 Data Center Finland Capital North |
Helsinki FInland |
2030 |
Planned |
50.0 MW Immediate Capacity |
|
|
Heim 02 Data Center Finland Capital North Specs |
Finland Capital Area, Finland (250,000 square meter plot) |
2030 |
Planned (Building Permit Process) |
60.0 MW Immediate Capacity (+40.0 MW in 2028; +400.0 MW TBC in 2030) |
|