Europe

Europe – Data Center Regional Overview

Europe is a mature and strategically important data center market, characterized by strong enterprise demand, advanced regulatory frameworks, and a growing emphasis on sustainability. The region serves as a critical hub for cloud infrastructure, financial services, content delivery, and cross-border digital traffic.

Key European markets benefit from robust fiber connectivity, dense subsea cable networks, and proximity to major enterprise and government customers. Increasing adoption of cloud computing, AI workloads, and digital services continues to drive demand for hyperscale and colocation data centers, while edge deployments gain traction to support latency-sensitive applications.

Sustainability plays a central role in European data center development, with operators increasingly investing in renewable energy sourcing, energy-efficient cooling technologies, and carbon-neutral operations. At the same time, strict data protection regulations and planning approvals influence site selection and development timelines.

Europe’s data center landscape is evolving beyond traditional core hubs, with secondary and emerging markets gaining importance due to power availability, land access, and cost optimization. This positions the region for steady long-term growth despite regulatory and infrastructure complexities.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Portugal’s Start Campus Launches SIN01, Advancing a 1.2GW Gigascale Vision Sines, Portugal (Atlantic Coast) 2030+ Operational (First Building, SIN01) 1.2 GW (Secured Total Grid Capacity)
AWS European Cloud Region for Data Sovereignty Germany Initial launch by late 2026; full investment deployed by 2029 Confirmed / Under Construction Significant capacity as part of the total €7.8B investment in the region
Start Campus SINES01 | Next-Generation Data Center Campus in Sines, Portugal ZILS (Sines Industrial and Logistics Zone), Sines, Portugal 2028 - 2030 Under Construction / Phase 1 Operational 1.2 GW
WBS Power / Prime Capital Hyperscale Campus | Co-Located Project Jupiter AI Hub Former military airfield, Brandenburg, Germany Phased development Pre-Construction/Planning (Targeting 2026/2027 Start) 500 MW
DUB20 Hyperscale Campus Arklow, County Wicklow, Ireland (Greater Dublin Area) Target 2028-2030 Under Construction (Initial Phase Piling & Shell) 90 MW
Apto Data Center Campus in Lacchiarella Lacchiarella (Milan Metropolitan Area), Italy N/A Announced / Early Development Phase 300 MW
Global Switch London East GS2 | High-Density Colocation & Infrastructure Expansion London Docklands (East India Dock), United Kingdom Expected completion in the late 2020s. Upgrade/Reconfiguration - Underway 74 MW
Madrid Sur Campus by Echelon Iberdrola Digital Infra Madrid Sur Area, Spain (South of Madrid) N/A (Potential for 700 MW+ across the JV's secured portfolio) Planning / Pre-Construction (Secured Power Connection) 230 MW
Microsoft DUB14 Dublin Data Center | Next-Gen Hyperscale Compute Campus in Ireland Grange Castle Business Park, Clondalkin, Dublin, Ireland Projected over 5-7 years Under Construction / Phased Buildout 240 MW
CyrusOne FRA7 Frankfurt Westside Campus Griesheim (West of Frankfurt), Germany Expected completion in phases over several years. Under Construction 126 MW
SINES 4.0 | Next-Generation Data Center Campus in Sines, Portugal Sines, Portugal (ZILS - Sines Industrial and Logistics Area) Estimated by 2030-2035 (phased) Under Construction/Ongoing Phased Development Up to 1.2 GW
Brookfield AI Data Center Campus Development Strängnäs (Stockholm Metro Area), Sweden Est. 2035 – 2040 (10-15 year construction timeline) Announced / Long-term Development Initial planned expansion from 300 MW to 750 MW
VIRTUS Wustermark Megacampus | Next-Generation Colocation & Digital Infrastructure Campus Wustermark (30 km west of Berlin), Germany Est. 2028-2030 Under Construction / Phased Development Up to 300 MW (Across 9 data center buildings)
Microsoft Middenmeer Campus | High-Performance AI & Cloud Infrastructure Expansion (AMS13/14) Middenmeer, Hollands Kroon (North Holland), Netherlands Long-term development Announced / Under Phased Construction Significant multi-MW capacity added over 50 hectares of new land
Fossefall Data Center | AI Factory for Scalable Cloud & GPU Workloads Fyresdal, Vestfold and Telemark County, Norway Phased towards 500 MW goal by 2030 across the Nordic region. Announced / Acquisition Complete (Late 2025) Commissioning Commissioning Phased conversion, initial AI capacity launch expected H Initial 5.5 MW (Existing reserved capacity)
Google Data Center Expansion, Saint-Ghislain Campus Saint-Ghislain, Hainaut Province, Belgium Continuous phased expansion over the next decade. Announced / Active Expansion (Investment committed late 2025) Significant increase from current load; scaled to support multi-phase gigawatt-scale AI requirements.
Amsterdam Hyperscale Campus Greater Amsterdam Region, Netherlands To be determined (Likely multi-year development) Announced / Pre-Construction (Lease Secured) Up to €1 Billion in construction investment; Hyperscale scale, multi-megawatt IT load.
Frankfurt Hyperscale Campus Colt DCS 4 & 5 Rhine-Main Region, Frankfurt, Germany TBC Announced / Land Secured & Power Contracts Signed 63 MW (Total IT Load)
Vantage CWL1 Cardiff | Next-Generation Colocation & Digital Infrastructure Campus Celtic Way, Newport, South Wales, UK Estimated completion of all three buildings by 2026-2027 Partially Operational / Expanding 148MW+ (Upgradeable)
Equinix Lelystad AI Data Center (AMS10) Flevokust Haven, Lelystad, Netherlands 2030 Planning / Pre-Construction 150 MW Dedicated Site Power
QuantumBasel Tempo Hub | IonQ Quantum Computing & Data Science Platform uptownBasel Campus, Arlesheim/Basel, Switzerland 2029 Active Expansion / Technology Integration Scalable Hub (Quantum systems are high-efficiency)
Goodman GEDCDP | European Data Centre Development & Investment Partnership Frankfurt (Germany), Amsterdam (Netherlands), Paris (France) 2030 Announced / Pre-construction 435 MW Total Portfolio
AMS11 Amsterdam Data Tower Campus by Digital Realty Science Park, Amsterdam, Netherlands Q3 2026 Live / Operational 27 MW IT Capacity
Sesterce "Rhône-Alps" AI Mega-Campus Lyon-Valence Logistics Hub, Auvergne-Rhône-Alpes 2032 Latest Launch (Active Execution Phase - Jan 2026) 1 GW (Initial Execution)
Hertfordshire Campus Equinix DC01UK Hertfordshire, UK 2029 Under Development / Construction Phase 250 MW IT Load
Villasequilla AI Campus | High-Performance AI Compute & Connectivity Facility Villasequilla, Spain 2029 Approved / Ready-to-Build (RTB) 600 MW IT Load
Digital Realty FRA18: 16MW AI-Ready Heritage Facility Frankfurt Estimated late 2027 Phase 1 Live (Operational) 16 MW Total
DayOne Nurmijärvi: 300MW Renewable AI Campus Nurmijärvi, Finland 2030 Phase 1 Groundbreaking / Early Construction 300 MW (Total Campus Buildout)
Mediterra Barcelona: 12MW AI-Ready Edge-Hyperscale Hub Strategic site in Catalonia, near Barcelona 2029 Launched / Site Acquired (Feb 20, 2026) Secured 12 MW
Osae-NFU 250MW AI Data Center Bordeaux France Former Industrial Site, Bordeaux Metropole 2029 Groundbreaking (Today) 250 MW IT Load
Digital Realty FRA20: 16MW AI-Ready Hyper-Scale Frankfurt Digital Park Fechenheim, Frankfurt Estimated 2028–2029 (Total Campus) Under Construction (Phase 1 Groundbreaking) 16 MW (IT Load)
Google Skien Norway: 240MW Hyperscale AI-Ready Data Center Skådalsvegen, Skien, Telemark, Norway 2030 (Planned 840 MW) Live / Commissioning 240 MW
atNorth SWE04 Sollefteå AI Campus (300 MW) Sollefteå (Långsele) 2031 Announced (Feb 24, 2026) 300 MW Total Utility Capacity
AWS Aragon Expansion: 33.7B Euro AI & Cloud Infrastructure Zaragoza, Multi-site: Zaragoza, Huesca, and Teruel (Aragon Region) 2030 Announced / Under Expansion Total regional capacity projected at 1 GW+ by full buildout
DT-NVIDIA AI Factory Munich: €1B 10,000 Blackwell GPU Hub Munich (Refurbished Industrial Site) 2028 Go-Live: March 4, 2026 10,000 NVIDIA Blackwell GPUs (Initial phase)
Google Waltham Cross: $1B AI Data Centre Hertfordshire UK , Waltham Cross, Hertfordshire 2026 Operational (Inaugurated Sept 2025) Estimated 100 MW Utility Feed
Google Dietzenbach: €5.5B AI Data Center & Heat Recovery Germany Dietzenbach (near Frankfurt), Hesse 2029 Under Construction / Groundwork (March 2026) Part of a regional 4-GW-ready German grid strategy.
Project Lusitanus Mérida: €2.8B AI Data Center FRV Spain Mérida (Extremadura) 2029 Under Construction / Phase 1 Foundations (March 2026) 1,000 MW (1 GW) Target
Nostrum Evergreen Badajoz: €1.9B 500MW AI Data Center Spain Badajoz 2029 (for 500MW) Permitting / Pre-Construction (March 2026) 500 MW
Microsoft Italy Project Raven | Next-Gen 800MW AI & Data Center Platform Lombardy and Lazio, Milan 2027 Operational / Rapid Scaling Phase (March 2026) 800 MW
Newport Wales Data Centre | Microsoft £2.5B AI-Ready Hyperscale Campus (200MW) Newport, Wales 2028 Under Construction / Fit-out (March 2026) 200 MW
Google Netherlands Winschoten | High-Performance AI & Hyperscale Cloud Hub Winschoten (Municipality of Oldambt), Groningen 2026 (Active Scaling) Operational (Opened November 18, 2025) ~200 MW (Phase 1)
Lappeenranta AI Factory | Nebius 310MW Hyperscale Liquid-Cooling Infrastructure Lappeenranta 2028 Announced / Pre-Construction (March 31, 2026) 310 MW
Stargate Norway Narvik | $1B 520MW AI Gigafactory Narvik (Kvandal), Nordland 2028 Under Construction / Initial Phase (April 2026) 520 MW
Digital Realty FRA32 Frankfurt: 9MW AI-Ready Data Center Frankfurt am Main Operational (Ongoing high-density retrofits) Operational / High-Density Upgrade (April 2026) 9.0 MW
Google Azores Nuvem & Sol | 10MW AI-Ready Subsea Connectivity Data Center Tecnoparque da Lagoa, São Miguel, Azores Q1 2027 Under Construction (April 2026) 10 MW
Digital Realty PAR12 Paris AI & Connectivity Hub 16 Avenue Joseph Froelicher, 77600 Ferrières-en-Brie, France Operational Operational / High-Density Optimized (April 2026) 20.0 MW
Paris Digital Park | Next-Generation 130MW Hyperscale AI Compute Campus 12-14 Rue de la Gare, 93120 La Courneuve, France 2026 (Final capacity tranches) Operational / Phased Expansion (April 2026) 130.0 MW
Digital Realty Marseille MRS5 River-Cooled AI Hub Port of Marseille Fos, Marseille, France 2027 Under Construction (April 2026) 14.0 MW
London III West London Data Center | 56MW Hyperscale AI & Cloud Infrastructure Hub Digital Park, Crawley, UK 2028 Under Construction / Phased Expansion (April 2026) 56.0 MW
Prime Finland: €6B Järvenpää AI-Ready 550MW Campus Vähänummi Industrial Area, Järvenpää 2031 EIA Phase / Pre-Development (April 2026) 550 MW
Vantage BER1 Brandenburg | 56MW Hyperscale AI & Cloud Infrastructure Hub 25-Acre Campus within Brandenburg Park 2026 Operational / Active Phase 2 & 3 Expansion (April 2026) 56.0 MW
Google Kronstorf AI Data Center Business Park Kronstorf 2029 Under Construction (Groundbreaking) 150 MW IT Load
Digital Realty ROM1 Rome Rome West 2029 Under Construction (Phase 1) 120 MW Total IT Load
Pantheon AI Topusko Zagreb 2032 Announced / Permitting 500 MW IT Load
Nexus-1 | 100MW Distributed AI Cloud & High-Performance Compute Hub Distributed across Southern France 2028 (1,000 Units Worldwide) Groundbreaking / Launch Phase 100 MW (First 100 Units)
Equinix MD5 Madrid | Next-Gen AI Data Center Launching Q2 2026 in Southern Europe Madrid Metropolitan Area NA In Development / Targeted Q2 2026 Opening Multi-MW Scalable
Pangea 5 Supercomputer | €100M AI Compute & Sustainable Energy Infrastructure Hub Technical Center (CSTJF) pau 2027 Project Announced / Design Phase (May 6, 2026) Scalable High-Density (HPC Optimized)
TikTok Lahti | €1 Billion AI-Ready Expansion for European Data Sovereignty Lahti, Finland H2 2027 Phase 1 Planning / Tenant Agreement Signed (May 2026) 128.0 MW (Full Build)
Microsoft Centurion Spain: 300MW Aragon Hyperscale AI Region Centrovía Industrial Park, La Muela (Zaragoza) 2029 (Projected) Phase 1 Commissioning / Active Buildout 300 MW (Campus Total)
Maincubes BER2: 186MW AI-Ready Hyperscale Campus Berlin Luckenwalde, South of Berlin Late 2027 Under Construction (Phase 2 Groundbreaking May 2026) 186 MW Total Utility Power
Transatlantic Innovation Campus: 500MW AI Hub Croatia Dugopolje 2030 Under Construction (Announced May 2026) 500 MW Total Utility Power
Equinix AM11 International Business Exchange™ Lemelerbergweg 28, 1101 AH Amsterdam 2026 / early 2027 Operational / Continuous Interconnection Optimization (May 2026) 9.0 MW
Equinix AM5: 13MW High-Density Amsterdam South East Hub Amsterdam Continuous Expansion / 2026 AI Infrastructure Upgrades Live / Operational (Active AI-Ready Upgrades) 13 MW Total Utility Supply
CyrusOne MIL1: 27MW Eco-Sovereign Data Center Milan Via delle Regioni, Segrate, Lombardy Late 2028 Under Construction (Groundbreaking March 25, 2026) 35 MW Total Utility Connection
CyrusOne AMS1: 54MW Hyperscale Amsterdam-Gateway Campus Linieweg 1, 1165 AA Halfweg (Haarlemmerliede) Ongoing / 2025-2026 Live / Operational (Active AI-Density Modernization) 54 MW IT Load (27 MW Dedicated per Building)
NTT Amsterdam 1: 40MW High-Density Network Gateway Aviolanda 1, 1437 Rozenburg 2025–2026 Live / Operational (Active AI-Density Modernization) 40 MW Total White Space Capacity
Equinix PA10: 15MW Highly Connected Eco-Hub Paris 114 Rue Ambroise Croizat, 93200 Saint-Denis 2025–2026 Live / Operational (Active AI Liquid-Cooling Upgrades) 15 MW Total Utility Connection
Digital Realty BCN1: 14MW Mediterranean Interconnection Gateway Sant Adrià de Besòs Innovation Area, Barcelona, Catalonia May 18, 2026 Live / Operational (Launched May 18, 2026) 14 MW Planned IT White Space Load
Project Monet: €2.2B High-Density Hyperscale AI Campus Île-de-France Corridor Late 2027 Approved / Pre-Construction Planning (Siting Finalized May 2026) 360 MW Maximum Allocated Site Power Envelope
Yondr London Slough Building 3: 40MW Hyperscale Data Center Slough SL2 5EJ, United Kingdom May 2026 (Complete 3-Building Campus Operational) Operational / Ready for Service (Achieved May 7, 2026) 100 MW+ Ultimate Combined Campus Substation Grid Allocation
Vantage Cardiff CWL12 The Celtic Way Glasgow, UK Estimated 2031 Planned / Site Infrastructure Under Development 120 MW maximum expansion capacity
Mistral AI EcoDataCenter 150MW Sustainable Sweden AI Campus Falun, Sweden Estimated 2029 Under Construction 150 MW maximum allocated grid capacity
Málaga Digital Gateway 45MW Tier III Andalusian Data Center Andalucía Tech Park District, Spain Estimated 2030 Planning & Site Acquisition Approved 45 MW gross facility footprint capacity
EdgeConneX Italy Hyperscale Expansion Milan Technology Hub, Italy Comprehensive portfolio development and final phase completions scheduled to scale through 2031 Active Development Phase 300 MW cumulative gross utility power allocation across three core deployment sites
Ark Data Centers Barcelona Project Montjuic 45 MW Investment La Maquinista, Barcelona, Spain Sequential multi-floor modular expansion phases projected to reach full capacity by 2031 Active Engineering & Permitting Phase 45 MW gross electrical capacity delivered via independent high-voltage utility lines
Equinix xScale Paris Hyperscale Data Center Expansion (23MW) 114 Rue Ambroise Croizat, 93200 Saint-Denis February 2025 (PA13x fully operational and pre-leased) Operational 23 MW total across primary xScale modules (expandable via future phases)
Frankfurt Central IV Hyperscale Data Center 186MW Campus Frankfurt, EU Q4 2028 Under Construction 186 MW Net IT Capacity
Civicos Networking: Roubaix Cloud Node 1 Rue Kellermann, 59100 Roubaix, France Seamlessly integrated into a multi-facility cluster including sister nodes in Tenerife, Lanzarote, and Madrid Active / Operational Cloud Services Node Up to 1.6 MW total localized operational power threshold, with densities scaling from 1.2 kW up to 10 kW per rack depending on hardware layout
EXA Mareuil sur Ay Mareuil-sur-Ay (Marne) Continuous "build-to-suit" internal data hall adaptations executing based on carrier and enterprise interconnect requirements Active / Fully Operational Core Network & Colocation Node Scalable multi-megawatt allocation providing high-reliability power feeds to partial, full, and multi-cabinet cage deployments
Digital Realty Paris 13: PAR13 Hyperscale 14 Rue de l'Orme à Moineaux, 91940 Les Ulis, France Continuous internal space optimizations and dense cooling retrofits tracking completely active through June 2026 Active / Operational 15 MW gross utility transformer capacity supporting high-density configurations
SoftBank Dunkirk AI Campus: 3.1GW Sovereign Mega-Hub Port of Dunkirk (Loon-Plage), Hauts-de-France Region, France Sequential regional campus completions across Dunkirk, Bosquel, and Bouchain tracking for full delivery by 2031 Active / Pre-Construction & Fast-Track Planning Phase (Announced June 2026) 3,100 MW regional allocation delivered via dedicated on-site 400 kV extra-high-voltage substations
Yondr Frankfurt FRA02: 40MW Hyperscale Bischofsheim Node Industrial Zone Am Schindberg, 65474 Bischofsheim, Hesse, Germany Continuous modular server hall fit-outs pacing sequentially across the multi-story footprint through 2029 Active / Under Heavy Structural Construction (Tracking June 2026) 40 MW gross utility line allocation feeding high-density rows scaling past 25 kW per rack
NTT London LON3: 24MW High-Density Dagenham AI Campus Yew Tree Ave, Dagenham RM10 7FZ, United Kingdom Continuous modular data hall expansion scaling sequentially across the campus footprint through 2029 Active / Under Heavy Structural Construction (Tracking June 2026) 24 MW gross utility capacity delivered via fully redundant, dedicated on-site transformer blocks
Data4 Escaudain: €5B 700MW Hyperscale Campus in France Former Parc des Soufflantes Industrial Redevelopment Site, Escaudain, Northern France 2032 - Q4 Active / Master Planning & Environmental Site Permitting Phase (Tracking June 2026) 700 MW gross ultimate site power allocation engineered to sustain high-density AI server clusters and next-generation compute configurations
Equinix MD6 Madrid 3.5MW Colocation Campus Calle de la Pedriza, 12, 28108 Alcobendas, Madrid, Spain Q2 2027 (Final BME Matching Engine Migration) Operational 3.5 MW Marketed Power
Milan CyrusOne MIL2 54MW Hyperscale Data Center Via Raffaele Rubattino no. 90, 20134, Milan, Italy Q4 2028 Under Development / Planning 90 MVA Dual Active High-Voltage Supply Allocation
London Kao Data KL03 40MW AI-Ready Data Center Park Royal, West London, UK Q4 2029 Under Development / Planning 40 MW Dedicated Critical Power Allocation
Digital Reef Havering 600MW AI Tech Campus London 499-Acre Fen Lane & North Ockendon Site, Havering Green Belt Corridor, East London Incremental 12-building campus expansions rolling out sequentially across a 5-to-10-year horizon Under Construction 200MW Phase 1 configuration (scalable up to 600MW full site allocation)
Google Horndal: New 150MW Air-Cooled Sweden Data Center Greenfield industrial zone, Horndal, Avesta Municipality, Dalarna County, Sweden Projected 2030 Groundbreaking Achieved / Active Civil Construction (June 2, 2026) 150.0 MW Phase 1 Baseline Capacity
Bucharest ClusterPower 800MW Off-Grid AI Infrastructure Factory Strada Viitorului nr.2, 207405 Mlecănești, Romania Q2 2030 Under Construction (Phase 1 Fast-Track) 800 MW
Cambois Northumberland 720MW Massive Hyperscale Campus Northumberland , england Q4 2031 Under Construction (Enabling Works / Phase 1) 720 MW
Solleftea atNorth 300MW High-Density Nordic AI Campus SWE04 Industrial Zone, Solleftea, Sweden Q4 2029 Under Construction (Phase 1 Framing) 300 MW
Paris Verne 500MW Sovereign AI High Performance Campus 36-43 Great Sutton St, London EC1V 0AB, United Kingdom Q4 2030 Under Construction (Phase 1 Groundwork) 500 MW
Project Boreas: 800MW Nordic Hyperscale Campus Northern Sweden (Nordic Region) 2031 Groundbroken / Under Construction 800 MW dedicated capacity
Granada: €3B Alto Infrastructure SP01 AI & HPC Campus Spain Escúzar, Granada (Andalusia) 2029 Groundbreaking Initiated 70 MW total master-planned power footprint (50 MW dedicated IT load)
Philippsburg: 707MW Project Engrida Hyperscale Data Center Campus Germany Former Goodyear Tire Factory & Decommissioned Philippsburg Nuclear Power Plant (KKP Site) 2032+ Pre-Construction / Municipal Council Preliminary Approval Received 707 MW total grid capacity allocation (Supporting an estimated ~550 MW of continuous critical IT infrastructure)
Vantage Frankfurt II FRA21 56MW AI Megacampus Alexander-von-Humboldt-Straße, 65479 Raunheim, Germany Mid-2026 Fully Operational / Undergoing Active High-Density Upgrades 100 MVA Dedicated On-Site Substation via Westnetz
Microsoft Azure NRW Germany 300MW AI Megacampus Rheinisches Revier Industrial Zone, NRW, Germany H2 2027 Fully Operational / Newly Launched 300 MW Dedicated High-Voltage Transmission Substation Connection
Digital Realty Lelystad Hyperscale Data Center Campus Flevokust Haven Industrial Estate, Lelystad, Netherlands Q4 2029 Planning / Pre-construction 150 MW Total Substation Allocation
Black Sea AI Gigafactory Campus (500MW Capacity) Constanța Logistics Zone, Black Sea Coast, Romania Q4 2031 Approved / Pre-construction 500 MW total utility power allocation
Google Farciennes AI-Ready Data Center Campus Rue de la Neuville 21, 6240 Farciennes, Belgium Q4 2029 Under Construction 300 MW total utility power allocation
Hscale MXP2 Hyperscale Milan Campus Milan Industrial District, Italy Q2 2030 Under Construction / Development 120 MW total allocated utility power
G2S Bourges Data Center: Tier III Groupama Core Facility Rue Denys Dodard, 18000 Bourges, France Q2 2015 (Complete operational stabilization) Fully Operational 5 MW total allocated utility grid connection
EXA Edge DC Poitiers: High-Availability French Node Zone d’Aménagement Concerté de Saint-Eloi, 86021 Poitiers, France Q4 2021 (Acquisition and asset integration under the EXA Infrastructure brand) Fully Operational 2.0 MW total dedicated operational utility power
SoftBank Northern France AI HyperCampus: 3.1GW Mega Hub Port of Dunkirk Western Harbour Zone, Loon-Plage, Hauts-de-France, France Q4 2033 (Realization of adjacent advanced electronics and containment assembly facilities) Pre-construction / Site Engineering (Announced May 2026) 1.0 Gigawatt (GW) initial active site substation capability
Vantage Dublin DUB1 Campus: 52MW Hyperscale Data Hub Profile Park, Clondalkin, Dublin 22, Ireland H2 2028 (Final system integration and handover of the second facility block) Active Construction Phase 52 MW dedicated server-ready power deployment
Pure DC Amsterdam Westpoort Hyperscale Campus (78 MW) Donauweg 12, Westpoort, Amsterdam 2027 (All 3 towers operational) Under Construction 78 MW Total Site Capacity
STT Frankfurt 1 Hyperscale Data Centre Campus (96 MW) Business Park, Hanauer Landstraße, Frankfurt am Main Late 2028 Under Construction 96 MW Total Scalable Substation Capacity
Digital Realty Paris Digital Park Campus (PAR8–PAR11) 2 Avenue Marcel Cachin, 93120 La Courneuve, Seine-Saint-Denis, France Q4 2025 (PAR11 Handover completing full 76 MW campus) Operational (PAR8, PAR9, PAR10 Live) / Final Phase Delivery (PAR11) 85 MW gross utility capacity / 76 MW critical IT load
Vantage FRA1 Frankfurt: 56MW German Hyperscale Data Center Campus Goethering 27, 63067 Offenbach am Main, Hesse, Germany 2026–2027 (Completion across all 3 campus buildings) Operational / Active Campus Expansion 56 MW total critical IT capacity
Digital Realty FRA11 Frankfurt: 9MW Digital Park Ostend Hub Weismüllerstraße 40, 60314 Frankfurt am Main, Germany Operational Operational 9.0 MW total critical IT capacity
Digital Realty London Docklands: 30MW Financial Interconnection Hub 1 Muirfield Crescent (Cloud House) & 227 Marsh Wall (Sovereign House), London E14, UK Operational Operational 30.0 MW total critical IT load across campus facilities
Digital Realty London LHR20 Data Center (Sovereign House) 227 Marsh Wall, London E14 9SD, United Kingdom Operational Operational 4.8 MW – 8.0 MW critical IT load
Ada Infrastructure London Docklands: 210MW AI Data Campus St. Vincent Ferrer Lane, Silvertown, London E16 2AP, United Kingdom Active multi-phase development (Phase 1 delivery 2027) Under Construction (Broke ground March 2026) 210.0 MW total critical IT load (3 x 70 MW buildings)
Pure DC Brent Cross LON01 Expansion (LON01B2) Harp View, 12 Priestley Way, Brent Cross, London NW2 7AL, United Kingdom Q2 2029 (LON01B2 completion / 90 MW campus target) Under Construction (Active live campus expansion; West Cold Shell phase awarded) 90.0 MW campus total IT load (70 MW added via LON01B2)
Pure DC Seinäjoki: 550MW Hyperscale Finland AI Campus Ämmäläntie & Törnäväntie, Pihlajaniemi, 60200 Seinäjoki, Finland Multi-phase 10-year development master plan (550+ MW total capacity) Under Construction 550.0 MW total critical IT capacity (110 MW Phase 1 capacity fully leased)
Equinix LD11x Expansion: London Slough Hyperscale xScale Hub 765/767 Henley Road, Slough Trading Estate, Slough, SL1 4JW, United Kingdom Q4 2023 – 2025 (Full 19 MW Capacity Expansion) Operational / Fully Energized Phase Expansion ~24+ MW Utility Capacity / 19 MW Critical IT Load
Iron Mountain AMS-1 Data Center Campus Expansion J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-acre campus) Q2 2027 (+10 MW Expansion Go-Live) / 2028–2030 (Full 43.1 MW Campus Target) Operational / Active Multi-Phase Campus Expansion 43.1 MW Total Utility Capacity (13.1 MW Active / +10 MW Phase 2 / +20 MW Phase 3)
Vantage Data Centers Milan: 96MW Italian Hyperscale & AI Infrastructure Hub Milan, Metropolitan City of Milan, Lombardy, Italy 2027–2029 (Full 96 MW regional multi-campus completion) Active Operation (MXP1) / Active Expansion Construction (MXP2) 96 MW Critical IT Power (64 MW MXP1 + 32 MW MXP2)
Vantage Data Centers Warsaw WAW1: 48MW CEE Hyperscale Hub Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw, Poland (12-acre campus) 2025–2026 (Building 2 Full Buildout) Operational / Active Multi-Building Phase Expansion 48 MW Critical IT Load (16 MW Building 1 + 32 MW Building 2)48 MW Critical IT Load (16 MW Building 1 + 32 MW Building 2)
Digital Realty BER2 Berlin Data Center Campus Strategic Industrial Hub, Greater Metropolitan Berlin Area, Germany 2027 – 2028 Under Development / Active Phased Buildout 32 MW Critical IT Load (Initial Campus Capacity)
Digital Realty MAD4 Madrid: 34MW Hyperscale Data Center Calle de Alfonso Gómez 4, 28037 Madrid, Spain Operational / Phased Expansion 2025–2027 Operational / Active Phased Capacity Expansion 34 MW Critical IT Power Capacity
Digital Realty MRS2 Marseille: Mediterranean Subsea & Interconnection Hub 136 Chemin du Littoral, 13015 Marseille, France (Grand Port Maritime de Marseille) Operational / Phased Expansion 2024–2026 Operational / Active Multi-Phase Capacity Expansion 12 MW Critical IT Power Capacity
Digital Realty PAR9 Data Center (Paris Digital Park / Interxion PAR9) 3 Avenue Marcel Cachin, 93120 La Courneuve, France (Paris Digital Park Campus) Operational / Continuous Phased Expansion Operational / Active Capacity Phasing 19 MW Critical IT Power Capacity
Digital Realty LON2 London: City Campus Financial Interconnection Hub 11 Hanbury Street (Block C), London E1 6QR, United Kingdom Operational Operational / Active Multi-Tenant & High-Density Density Upgrades 16 MW Utility / Substation Power Allocation
Digital Realty DUB12 Dublin: 10.3MW Hyperscale & Cloud Hub Clonshaugh Industrial Estate, Clonshaugh Crescent, Dublin 17, D17 AW86, Ireland Operational / Phased AI & Density Density Optimizations Active Operational / Active Multi-Tenant & Cloud Capacity Expansion 10.3 MW Critical IT Power Capacity / ~12 MW Gross Utility Allocation
Digital Realty BRU3 Brussels: Carrier-Neutral Capital Interconnection Hub Wezembeekstraat 2, 1930 Zaventem, Greater Brussels Metropolitan Area, Belgium Operational / Phased Density and Cooling Upgrades Active Operational / Active Multi-Tenant Modernization & Density Upgrades 1.3 MW Critical IT Power Capacity / 11kV Substation Feed
Iron Mountain AMS-2 Amsterdam: 10MW Hyperscale & AI Expansion J.W. Lucasweg 35, 2031 BE Haarlem, Netherlands (23-Acre Amsterdam Campus) 2028–2030 (Full 43.1 MW campus buildout) Active Development / Construction Phase 10 MW Critical IT Power Capacity (AMS-2) / 43.1 MW Total Campus Substation
Iron Mountain FRA-2 Frankfurt: 10.6MW Hyperscale & Connectivity Hub Am Martinszehnten Industrial Park, 60437 Frankfurt am Main, Germany Operational / Active Modernization & AI High-Density Modernization Operational / Active Multi-Tenant Capacity Expansion & Upgrades 10.6 MW Critical IT Power Capacity (FRA-2) / 37.6 MW Combined Campus Total
Iron Mountain LON-2 London Slough: 27MW Hyperscale Data Center 110 Buckingham Avenue, Slough Trading Estate, Slough SL1 4PF, United Kingdom Operational Operational / Fully Commissioned Wholesale Facility 27 MW Critical IT Power Capacity / 32+ MW Utility Substation Feed
Colt DCS London Hayes Campus Expansion: 160MW Hyperscale & AI Hub Hayes Digital Park, London Borough of Hillingdon, West London, United Kingdom 2029–2032+ (Phased delivery across London 6, 7, and 8) Approved / Pre-Construction Phase (Construction Start: 2026) 97 MW Expansion Capacity / 160 MW Total Campus Capacity
Nabiax Alcalá Madrid Campus: 100MW Hyperscale Data Center Expansion Av. Punto Com, 23, 28805 Alcalá de Henares, Madrid, Spain 2026–2029+ (Phased delivery to 100 MW) Operational / Active Multi-Phase Hyperscale Expansion 22.3 MW Operational IT Power / 100 MW Total Campus Power Potential
atNorth FIN02 Helsinki Expansion: 45MW High-Density AI & HPC Campus Sinimäentie 6, 02630 Espoo, Greater Helsinki Area, Finland Q3/Q4 2027 (Completion of 45 MW Expansion Extension) Active Construction Phase (5-Story Extension Underway) 35 MW Critical IT Power Capacity / 45 MW Gross Substation Feed
Bulk OS-IX Oslo Internet Exchange: 14MW Carrier-Neutral Data Center Hans Møller Gasmanns vei 9, 0594 Oslo, Norway Operational / Continuous AI & High-Density Modernization Operational / Active High-Density & AI Expansion Phase 14.4 MW Critical IT Power Capacity
NTT DATA FRA5 Frankfurt: 80MW Sovereign AI & Hyperscale Campus Greater Frankfurt Metro Corridor / Offenbach East Region, Hesse, Germany 2027–2029+ (Phased delivery across multi-building expansion blocks) Active Construction & Site Development Phase 80 MW Critical IT Power Capacity
Vantage Data Centers WAW2 Warsaw: 48MW Hyperscale & Cloud Hub ul. Zgrupowania AK "Kampinos" 42D, 01-949 Warsaw (Bielany District), Poland 2025–2026 (Completion of Building 2 / WAW2 Expansion) Operational (Building 1) / Active Expansion (Building 2 / WAW2) 48 MW Critical IT Power Capacity
Data4 Milan Data Center Campus: 270MW AI Digital Hub Cornaredo (MIL01: Via Monzoro, 101-105) & Vittuone (MIL02: Via Giovanni Pascoli), Metropolitan City of Milan, Italy 2028–2030 (Completion of all 18 Data Center Buildings across MIL01 & MIL02) Operational (MIL01 Phase 1–DC09) / Active Construction & Expansion (MIL01 expansion & MIL02) 170 MW (MIL01 Campus) + 100 MW (MIL02 Campus) = 270 MW Total Capacity
CyrusOne FRA5 Frankfurt Hanau Campus: 54MW Hyperscale & AI Hub Industrieweg 45, 63451 Hanau, Hesse, Germany (Metropolitan Frankfurt Metro Area) 2026–2027 (Building 2 & Final AI High-Density Expansion) Operational / Active Phased Development & Expansion 54 MW Total Critical IT Load (27 MW per building) / 90 MVA Grid Capacity
Colt DCS Leeds Data Centre Campus: High-Density UK Digital Hub Leeds Metropolitan Area, West Yorkshire, United Kingdom Targeted 2027–2028 Active Development / Planned Regional Expansion ~20 MW – 40 MW Grid Supply Capacity
Echelon DUB20 Arklow Data Center Campus: 100MW Hyperscale Infrastructure Hub Ireland Avoca River Park / Vale Road, Arklow, Co. Wicklow, Ireland Targeted 2026–2027+ Under Construction / Phased Grid Integration & Site Development ~100 MW – 120 MW Utility Connection Capacity
atNorth HEL1 AI Data Center Helsinki Finland: Sustainable High-Density & AI Computing Hub Kuortaneenkatu 3, 00510 Helsinki, Finland Fully Operational / Ongoing High-Density AI Expansions Operational / Upgraded for AI & High-Density Workloads ~1.5 MW Utility Supply Connection
Etix Everywhere Regional Edge Data Center Network: Sovereign French Infrastructure Multi-site French Regional Edge Portfolio (e.g., ETIX Paris #3: Vélizy-Villacoublay, Yvelines; ETIX Nantes #1–#3: Chantenay/Saint-Herblain) Continuous Expansion & New Edge Acquisitions Operational / Active Regional Edge Expansion ~2.0 MW to 7.0 MW per regional facility module (~20 MW–50 MW network total)
KevlinX BRU01 Brussels Data Center Campus: 32MW+ AI-Ready Hub Avenue Antoon Van Oss / Av. Antoon Van Oss, 1120 Brussels, Belgium 2026–2027 (Phased Whitespace Expansion) Operational (Live as of Q1 2026) ~32 MW Critical IT Power (~68 MW Utility Power Capacity)
MERLIN Edged LIS2 Lisbon Data Center Campus: 180MW Waterless AI Hub Plataforma Logística Lisboa Norte, Freguesia de Castanheira do Ribatejo, Vila Franca de Xira, 111405, Portugal 2027–2029+ (Phased 5-Facility Expansion) Under Construction / Active Phase 1 Buildout 180 MW Critical IT Power (Expandable to 300 MW)
Digital Realty CPH1 Copenhagen Data Center: Ballerup Interconnection Hub Industriparken 20A–20C, DK-2750 Ballerup, Copenhagen, Denmark Operational Active Campus Operational ~4.2 MW Total Utility Supply Allocation
Beyond.pl WRO1 Wrocław Data Center Campus: 150MW AI-Ready Hub Strategic Industrial & Tech Corridor, Wrocław, Lower Silesia, Poland 2027–2029+ Under Development / Planned Expansion 150 MW Total Utility Capacity Allocation
Green ZRH1 Zurich West Data Center Campus: High-Density Lupfig Hub Industriestrasse 31–33, 5242 Lupfig, Aargau, Switzerland Operational Active Expansion Operational / Active Expansion (Zurich West 4) 40 MW+ Total Utility Allocation
STACK Infrastructure AMS3 Amsterdam Data Center Campus: Hyperscale AI Hub Strategic Hyperscale Corridor, Amsterdam Metropolitan Area, Netherlands Phased Multi-Stage Expansion Planned / Under Development ~50 MW – 100 MW Utility Power Allocation
Colt LHR2 London West Data Center Campus: 9.4MW Park Royal Hub 13 Volt Avenue, Park Royal, London NW10 6PW, United Kingdom Operational Operational 15.0 MVA Total Utility Supply Provision
Data4 Madrid MAD2 Data Center Campus: 80MW AI-Ready Hub Polígono Industrial Sur, 28750 San Agustín del Guadalix, Madrid, Spain 2026–2028+ (Phased Multi-Building Rollout) Under Construction / Active Multi-Building Phase Buildout 80 MW Total Utility Capacity Allocation
EcoDataCenter Östersund Data Center Campus: 150MW Sustainable HPC Hub Municipality of Östersund, Jämtland County, Sweden 2026–2028+ (Phased Multi-Building Expansion) Under Construction / Phased Campus Buildout 150 MW Total Utility Capacity Allocation
EcoDataCenter Falun Data Center Expansion: 80MW Sustainable AI Hub Slaggvarpsvägen 21, 791 77 Falun, Dalarna County, Sweden Operational Active Expansion Active Multi-Building Expansion / Under Construction 80 MW Total Secured Utility Power Capacity
Green Mountain OSL1 Oslo Data Center Campus: 93MW Sustainable Hub Granittveien 100, 1914 Ytre Enebakk, Norway Operational Active Expansion Operational / Active Expansion 93 MW Total Utility Supply Allocation
Bulk Infrastructure Gothenburg Data Center Campus: Nordic AI Hub Strategic Industrial Corridor, Gothenburg, Västra Götaland County, Sweden Phased Multi-Building Rollout Planned / Under Development ~50 MW – 80 MW Total Secured Utility Capacity Allocation
KevlinX Brussels Data Center Campus: 32MW+ AI-Ready Hub Av. Antoon Van Oss 1, 1120 Brussels, Belgium Active Multi-Building Campus Expansion Operational / Phased Active Expansion 32 MW – 68 MW Total Utility Power Allocation
Echelon DUB20 Data Center Campus: Ireland's 100MW Sustainable Hyperscale Hub Avoca River Park, Vale Road, Arklow, Co. Wicklow, Ireland Operational Active Campus Expansion Operational / Active Expansion Phase 100 MW Secured Grid Utility Power Allocation
Yondr Group Frankfurt Data Center Campus: 40MW Hyperscale Hub In der Niederwiese 3, 65474 Bischofsheim, Greater Frankfurt Metropolitan Area, Germany July 2025 (Full 40 MW Operational) Fully Operational / Active Campus Deployment 40 MW Total Secured Utility Power Capacity Allocation
atNorth DEN01 Copenhagen AI Data Center Campus: 30MW Sustainable HPC Hub in Denmark Tonsbakken 12, 2740 Skovlunde / Ballerup, Greater Copenhagen, Denmark Operational Active Campus Fully Operational / Active HPC & AI Deployment 30 MW Total Secured Utility Power Capacity Allocation
EdgeConneX WAW03 Warsaw Data Center Campus: 12MW Hyperscale & Edge Hub in Poland Posag 7 Panien 1, 02-495 Warsaw, Poland Operational Active Campus Fully Operational / Active Campus Expansion 12 MW Secured Utility Power Allocation (WAW03 Facility)
Green Mountain OML1 Bergen Data Center Campus: Sustainable Hyperscale Hub in Norway Hegglandsdalen, Osterøy Municipality, Greater Bergen Area, 5282 Osterøy, Norway Active Multi-Building Campus Expansion Fully Operational / Active Phased Expansion ~93 MW Secured Utility Power Allocation
Merlin Properties Lisbon AI Data Center Campus: 180MW Sustainable AI Hub Castanheira do Ribatejo, Vila Franca de Xira, Greater Lisbon Area, Portugal Active Multi-Phase Development Under Construction / Active Phase 1 Development 180 MW Secured Utility Power Allocation (scalable to 300 MW)
EcoDataCenter Stockholm Hyperscale Campus: 80MW Sustainable AI Hub in Sweden Greater Stockholm Region, Sweden Active Multi-Building Campus Development Active Development / Phased Buildout 80 MW Secured Utility Power Allocation
Yondr Group LON2 Slough Data Center: 30MW Hyperscale & AI Hub Slough Trading Estate Area, Slough, Berkshire, SL1 4DX, United Kingdom Active Multi-Phase Development Under Development / Active Phased Construction 30 MW Secured Utility Power Allocation
maincubes FRA04 Frankfurt Data Center Campus: 40MW Sustainable AI Hub Gulf Data Hub within the KAUST Research and Technology Park 23955 Thuwal Saudi Arabia Active Multi-Phase Development Under Development / Active Phased Planning 40 MW Critical IT Load (60 MW Secured Utility Power Allocation)
Start Campus SINES DC Portugal: 1.2GW Sustainable AI Data Center Zona C1.1, ZILS (Industrial and Logistics Zone of Sines), 7520 Sines, Portugal Active Multi-Phase Development through 2030 (1.2 GW total campus capacity) Operational (SIN01) & Active Multi-Facility Expansion (SIN02–SIN06) 1.2 GW Secured Utility Power Allocation
Equinix Warsaw Data Center Campus WA4x ul. Krakowiaków 91/101, 02-255 Warsaw, Poland (WA4x Hyperscale / Campus Node) Active Phased Development Operational & Active Multi-Building Expansion 19.2 MW Secured Utility Power Allocation
Equinix Warsaw WA1 Data Center: Premier Connectivity & Peering Hub in Poland Aleje Jerozolimskie 65/79, 00-697 Warsaw, Poland (LIM Center Skyscraper) Active Operational Facility Fully Operational Hub 3.0 MW Secured Utility Power Allocation
Equinix Warsaw WA2 Data Center: Regional Colocation & Cloud Node in Poland ul. Poleczki 23, 02-822 Warsaw, Poland Operational Active Facility Fully Operational Hub 4.0 MW Secured Utility Power Allocation
Equinix Warsaw WA3 Data Center: Sustainable Enterprise & Cloud Hub in Poland Aleje Jerozolimskie 213, 02-222 Warsaw, Poland Active Operational Facility Fully Operational Hub 4.5 MW Secured Utility Power Allocation
ITinSell Cloud La Ciotat Data Center: Tier IV Sovereign & HDS Hub in France 785 Voie Antiope, Zone d'Activités Athélia III, 13600 La Ciotat, France Operational Active Facility Fully Operational Sovereign Cloud & Colocation Hub ~3.5 MW Secured Utility Power Allocation
DATA4 Marseille Campus: 120MW Sustainable Hyperscale & AI Hub in France Former Normed Shipyards Site, Zone d'Activités, 13600 La Ciotat / Marseille Metro, France Active Multi-Phase Development through 2030+ Active Development / Under Construction 120 MW Secured Utility Power Allocation
STACK Infrastructure MIL02A Milan Data Center: 5.6MW Colocation Hub Via Marche 9, 27010 Siziano (PV), Lombardy, Italy Operational Active Building Fully Operational Hub 5.6 MW Secured Critical IT Utility Allocation
Mainova WebHouse MWH01 Frankfurt Data Center: 30MW Sustainable Campus Gwinnerstraße 7 & Mergenthaler Straße 12, 60388 Frankfurt am Main, Germany Operational / Active Expansion Phase (MWH01.2 - 2025) Operational (MWH01.1) / Active Expansion (MWH01.2) 30 MW Secured Utility Power Allocation
Kao Data Manchester Campus (KMAN-01): 40MW AI & Hyperscale Hub Kenwood Point, Kenwood Road, Reddish, Stockport, SK5 6PH, United Kingdom Active Development Campus Active Development / Under Construction 40 MW Secured Critical IT Utility Allocation
atNorth NOR01 Data Center Campus: 350MW Sustainable Mega Hub in Haugaland, Norway Haugaland Business Park, 5570 Aksdal, Tysvær Municipality, Rogaland, Norway Active Multi-Phase Mega Campus Development Active Development / Under Construction 350 MW Secured Critical IT Utility Allocation (Initial 120 MW)
Digital Realty PAR3 Data Center Paris: Carrier-Neutral Colocation Hub in Saint-Denis 7-9 avenue des Arts et Métiers, 93200 Saint-Denis, France Fully Operational Active Facility Fully Operational Carrier-Neutral Facility ~10 MW to 14 MW Secured Utility Power Allocation
Digital Realty FRA8 Data Center Frankfurt: Carrier-Neutral Hub on Weismüllerstraße Weismüllerstraße 36, 60314 Frankfurt am Main, Germany Fully Operational Active Facility Fully Operational Carrier-Neutral Facility ~8 MW to 12 MW Secured Utility Power Allocation
Hyperco Helsinki Data Center: Sustainable Hyperscale & Enterprise Hub in Finland Myllynkivenkuja 4, 01620 Vantaa, Finland Fully Operational Active Facility Fully Operational Hyperscale Facility ~20 MW to 50 MW Total Secured Utility Power Capacity
Atman Warsaw-1 (WAW-1) Data Center: Carrier-Neutral Hub in Poland Grochowska 21a 04-186 Warsaw Poland Fully Operational Active 11-Building Campus Fully Operational Hyperscale & Enterprise Campus 57.0 MW Total Allocated Utility Power Capacity
Atman Warsaw-2 (WAW-2) Data Center: Carrier-Neutral Hub in Warsaw Business District 5 Konstruktorska St, 02-673 Warsaw, Poland Fully Operational Active Facility Fully Operational Enterprise & Interconnection Facility 16.0 MW Total Utility Power Allocation
NDC-GARBE FRA02 Hanau Data Center Frankfurt: Sustainable Cloud & Hyperscale Hub Hanau Industrial Zone (Former Civil Defense Storage Site Brownfield Redevelopment), Hesse, Germany Fully Operational Active Facility Fully Operational Hyperscale Cloud Data Center ~15.0 MVA Total Utility Power Capacity Allocation
Apto DC Madrid Data Center Campus: 240MW Sustainable Hyperscale Hub in Fuenlabrada Calle Sauce 20, Fuenlabrada, 28942 Madrid (~14 km from Madrid City Centre), Spain Active Multi-Building Campus Development (5 Buildings Total) Under Development / Active Construction Phase 240.0 MW Total Campus Utility Power Capacity Allocation
Digital Realty Marseille MRS4 Data Center: 13MW Mediterranean Interconnection Hub ancienne base sous-marine, Enceinte Portuaire, Porte 4, 13015 Marseille, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Hub 13.0 MW Total Utility Critical IT Power Allocation
Pulsant Manchester NW-1 Data Center: Regional Edge Colocation Hub UK 1-2 Ball Green, Cobra Court, Trafford Park, Stretford, Manchester M32 0QT, United Kingdom Fully Operational Active Facility Fully Operational Regional Edge Data Center ~1.6 MW Total Facility Primary Power Connection
Conapto Stockholm 1 City Data Center Sweden: 1MW Central Colocation & Recovery Hub Sandhamnsgatan 63B, 115 28 Stockholm, Sweden Fully Operational Active Facility Fully Operational Enterprise & Colocation Facility 1.0 MW Total Utility Critical Power Allocation
Digital Realty CPH3 Data Center Copenhagen: 14MW Hyperscale & Interconnection Hub Industriparken 24, DK-2750 Ballerup, Copenhagen, Denmark Fully Operational Active Facility Fully Operational Hyperscale & Enterprise Facility ~16.0+ MVA Total Utility Grid Supply Allocation
Digital Realty Marseille MRS1 Data Center: 10MW Mediterranean Subsea Interconnection Hub 40 Avenue Roger Salengro, 13003 Marseille, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Interconnection Hub 10.0 MW Total Utility Power Grid Connection Allocation
Digital Realty Marseille MRS6 Data Center: 50MW Sovereign Cloud & AI Hub Avenue Ferdinand de Lesseps, 13320 Bouc-Bel-Air (Marseille Metro Area), France Active Multi-Hall Warehouse Conversion & Campus Development Under Development / Planned Greenfield Conversion ~60.0+ MVA Total Utility Grid Connection Allocation
Digital Realty Paris PAR8 Data Center: 19MW Hyperscale & Enterprise Hub France 2 Avenue Marcel Cachin, 93120 La Courneuve, Paris, France Fully Operational Active Facility Fully Operational Enterprise & Cloud Facility Dual independent high-voltage utility grid feeds, static N+1 uninterruptible power supply (UPS) modules, automated switchgear, and multi-megawatt N+1 standby emergency diesel generator arrays with on-site fuel reserve autonomy.
Vantage CWL21 Cardiff Data Center: 28MW Sustainable Hyperscale Hub UK Imperial Park, Celtic Way, Marshfield, Newport / Cardiff CF3 0XW, United Kingdom Active Greenfield Campus Development Active Development / Phased Delivery ~35.0 MVA Primary Grid Utility Connection Allocation
Vantage CWL44 Bridgend Data Center: 20MW Hyperscale & AI Campus South Wales UK Bridgend Industrial Estate / Waterton Industrial Estate, Bridgend CF31 3WT, South Wales, United Kingdom Active Greenfield Campus Development Active Development / Planned Greenfield Campus ~25.0 MVA Primary Grid Utility Connection Allocation
Verne Helsinki Vantaa Data Center: 10MW Sustainable AI & Cloud Hub Finland Verne Mittalinja 1 01260 Vantaa Finland Fully Operational Active Campus Fully Operational Enterprise, Cloud & AI Campus ~12.0 MVA Total Utility Grid Connection Allocation
VIRTUS Cardiff Data Center Campus: Hyperscale & AI Expansion Hub Wales UK Cardiff Metropolitan Corridor, South Wales, United Kingdom Active Regional Campus Pipeline Active Development / Master-Planned Regional Expansion Scalable Primary High-Voltage Utility Substation Supply Allocation
Serverfarm Amsterdam AMS1 Data Center: 18MW AI-Ready Colocation Hub Netherlands Keienbergweg 22, 1101 GB Amsterdam / Archangelkade 1, 1013 BE Amsterdam, Netherlands Fully Operational Active Facility Fully Operational Enterprise, Cloud & AI Colocation Hub 30.0 MVA Total Primary Utility Grid Supply Allocation
Serverfarm London LON1 Data Center: 11.4MW AI-Ready Colocation Hub Feltham UK Unit 4, Westgate Estate, Staines Road, Feltham TW14 8RS, London, United Kingdom Fully Operational Active Facility Fully Operational Enterprise, Cloud & AI Colocation Hub ~15.0 MVA Total Primary Grid Utility Connection Power Allocation
SoftBank Group Bosquel AI Data Center: 1GW Sovereign Hyperscale Campus Hauts-de-France Bosquel, Communauté de Communes Somme Sud-Ouest, Hauts-de-France, France Target 2031 (Complete 1 GW Master-Planned AI Factory Delivery) Announced / Pre-Development & Site Planning ~1.2 GVA Dedicated High-Voltage Substation Grid Capacity Allocation
SoftBank Group Bouchain AI Data Center: 400MW Repurposed Industrial AI Factory Hauts-de-France Former EDF Thermal Power Plant Industrial Brownfield Site, Bouchain, Nord, Hauts-de-France, France Target 2031 (Complete 400 MW Industrial Conversion) Announced / Preferred Bidder Selected & Active Due Diligence Phase ~500.0 MVA High-Voltage Grid Substation Capacity Allocation
Microsoft Zaragoza Data Center Campus: €6.7B Hyperscale Cloud Hub Aragon Spain Rda. Externa Anillar (Z-40) 50007 Zaragoza Spain Long-Term Phased Campus Expansion (2026–2034) Permitted / Under Construction & Site Preparation ~350 MVA Grid Capacity Allocation across Planned Substation Additions
LEV002 Data Center (AtlasEdge Leverkusen LEV002) Dornierstraße 10, 51381 Leverkusen-Quettingen, North Rhine-Westphalia, Germany Integrated Operations across Leverkusen Campus (LEV001 + LEV002 = ~14.4 MW total capacity) Under Construction / Active Development ~6.0 MVA Dedicated Utility Grid Substation Allocation
Maincubes BER01 Berlin Data Center: Go West Campus Colocation Specs Mecklenburgische Straße 32 (Go West Campus), 14197 Berlin, Germany Active Commercial Colocation Center Operational ~11.0 MVA Dedicated Utility Grid Substation Allocation
TikTok Kouvola Data Center: €1B Project Clover Hyperscale Facility Finland Kouvola, Kymenlaakso, Southern Finland Multi-Phase Phased Delivery (Complemented by Lahti Data Center Expansion) Under Construction / Commissioning Phase ~60+ MVA Dedicated Substation Grid Service Allocation
CloudHQ Lisses CDG Data Center Campus Paris France Specs Rue Léonard de Vinci, 91090 Lisses, Île-de-France, France Multi-Phase 148.8 MW Master Campus Rollout (CDG1 & CDG2) Operational / Multi-Phase Expansion ~180+ MVA Dedicated Substation Grid Service Allocation
Icade Rungis Data Center Paris: Hyperscale Tech Park Development France 70 Rue des Solets, Parc d'affaires Paris Orly-Rungis, 94150 Rungis, Île-de-France, France Multi-Phase Hyperscale Campus Rollout Planned / Under Development ~45+ MVA Dedicated Utility Grid Substation Allocation
Campus AI Paris France: €8.5B MGX Bpifrance Mistral AI Megacampus Specs Route Départementale 57 (D57), 77390 Fouju, Seine-et-Marne, Île-de-France, France Multi-Phase Gigawatt Campus Rollout across Fouju and secondary expansion sites Under Development / Early Site Preparation ~1.6+ GVA Dedicated Substation Grid Service Allocation (Fouju Campus)
Colt Berlin Data Center Campus: Enterprise Colocation Germany Specs Uhlandstraße 181, 10623 Berlin / Kitzingstraße 15-18, 12277 Berlin, Germany Active Commercial Colocation & Network Hub Operational / Phased Expansion ~5.28 MVA Utility Grid Allocation
Colt Frankfurt 3 Hyperscale Data Centre: Germany Expansion Specs Wilhelm-Fay-Straße, 65936 Frankfurt am Main (Sossenheim), Germany Active Multi-Phase Hyperscale Deployment Under Construction / Phased Delivery ~40 MVA Total Utility Grid Provision / 32.4 MW Critical IT Capacity
Arcem Joroinen Data Center Campus: Powered Land Development Finland Specs Vättiläntie 1227, Huutokoski Industrial Area, 79620 Joroinen, Finland Multi-Phase Master-Planned Campus Development Planned / Site Origination & Permitting Phase ~30+ MVA Initial Substation Grid Access (Scalable to match site footprint)
DataVita dv2 Data Centre Chapelhall: York Road Edge Hub Scotland Specs Unit 1, York Road, Chapelhall Industrial Estate, Chapelhall, Airdrie, ML6 8NW, Scotland, United Kingdom Active Commercial Operations & Corporate HQ Operational ~3.5 MVA Utility Substation Allocation
IFB Altens Data Centre Aberdeen: Scotland Managed Hosting Specs 54 Hareness Road, Altens Industrial Estate, Aberdeen, AB12 3LE, Scotland, United Kingdom Active Commercial Colocation & Managed Cloud Hub Operational ~1 MVA Utility Substation Connection
IFB Union Street Data Centre Aberdeen: Central Scotland Colocation Specs 387 Union Street, Aberdeen, AB11 6BX, Scotland, United Kingdom Active Commercial Colocation & Network Facility Operational ~0.8 MVA Utility Grid Provision
Brightsolid Aberdeen Data Centre: Whitemyres Ave Tier III Specs Whitemyres Avenue / Lang Stracht, Mastrick, Aberdeen, AB16 6HQ, Scotland, United Kingdom Active Commercial Operations & Colocation Hub Operational ~2.5 MVA Utility Grid Allocation / 2.0 MVA Backup Generation
Blackdog Data Center Campus Aberdeen: Multi-Gigawatt AI Hub Scotland Specs A92 & Aberdeen Western Peripheral Route (AWPR / A90 Junction), AB23 8AR Blackdog, Aberdeenshire, Scotland, United Kingdom Multi-Phase Gigawatt Master Campus Rollout Proposed / Planning Permission in Principle (Masterplan Entitlements) 600 MW Initial Substation/Power Allocation (Scalable to Multi-GW)
iomart Glasgow Data Centre DC1: Middlesex Street Colocation Specs 88 Middlesex Street, Kinning Park, Glasgow, G41 1EE, Scotland, United Kingdom Operational Colocation & Managed Services Hub Operational 1.0 MVA Total Grid Provisioning
Schuberg Philis Boeing Avenue Data Center: Schiphol-Rijk Specs Boeing Avenue 271, 1119 PD Schiphol-Rijk, Haarlemmermeer, The Netherlands Active Commercial Operations & Sovereign Cloud Center Operational ~4.5 MVA Utility Grid Provision
Digital Realty AMS10 Pudongweg Data Center: Schiphol Colocation Specs Pudongweg 25, 1437 EM Aalsmeerderbrug (Schiphol-Rijk area), The Netherlands Active Commercial Colocation & Interconnection Hub Operational ~31.2 MW Total Utility Power Provision
Digital Realty AMS8 Pudongweg Data Center: Schiphol Colocation Specs Pudongweg 37, 1437 EM Rozenburg, North Holland, The Netherlands Active Commercial Operations & Cloud Campus Facility Operational ~20 MVA Total Utility Substation Capacity
nLighten Amsterdam AMS II Data Center: Schiphol-Rijk Specs Koolhovenlaan 120, 1119 NR Schiphol-Rijk, Haarlemmermeer, The Netherlands Active Commercial Edge Colocation Operations Operational ~5.0 MVA Total Utility Substation Capacity Allocation
EdgeConneX Amsterdam EDCAMS05: Schiphol-Rijk Hyperscale Specs Boeing Avenue 201-203, 1119 PD Schiphol-Rijk, Haarlemmermeer, The Netherlands Active Commercial Operations & Cloud Edge Hub Operational ~25 MVA Dedicated Utility Substation Allocation
DayOne Aragon AI Data Center Campus: Technical Specs & Infrastructure Ctra. de Quinto de Ebro a Gandesa (A-221), 50790 Escatrón, Zaragoza, Spain Operational in phased 50 MW–100 MW high-density modules Announced / Under Development ~300 MW High-Voltage Grid Substation & Direct Generation Capacity
Campus Data Navarra: Grupo VDR Data Center Specs Polígono de servicios de Gazólaz (Calle A & Calle C), 31190 Gazólaz, Navarra, Spain 2029 (Buildings 2–4 with 100 MW capacity each) Announced / Pre-Construction & Urbanization Phase ~350 MVA Total Substation Grid Capacity
Tillion Aragon Data Center Campus: Technical Specs ~80-Hectare Master Site, Carretera A-129, 50162 Villamayor de Gállego, Zaragoza, Spain 2032–2034 (Multi-Phase Rollout to 300 MW Total Scale over 7–8 Years) Announced / Pre-Construction Phase (DIGA Approved) ~350 MVA Total Utility Substation Capacity (150 MW Initial Secured Grid Concession, Expandable to 300 MW)
Apto Lacchiarella Data Center Campus: Technical Specs Via SP105 / SP40 Junction Area, 20084 Lacchiarella, Metropolitan City of Milan, Italy 2029–2030 (Multi-Phase Rollout Across All 3 Buildings) Announced / Pre-Construction & Permitting Phase ~220 MVA Dedicated Substation Grid Connection
Adriatic DC Bari Data Center: Technical Specs Via Francesco de Blasi, Ex-Manifattura Tabacchi Industrial Zone, 70123 Bari, Puglia, Italy 2030 (Multi-Phase Campus Deployment) Announced / Permitting & Site Regeneration Phase ~250 MVA Dedicated Utility Substation Capacity
EDF OpCore Montereau AI Data Center France Hyperscale Campus Former Montereau Thermal Power Station Site, Montereau-Fault-Yonne, 77130, France Q4 2029 Under Construction / Master Development 200 MW Gross Utility Power Capacity (Campus Limit)
Polarise Amberg AI Data Center Bavaria Germany Amberg Industrial Park, 92224 Amberg, Bavaria, Germany Q2 2028 Under Construction 100 MW Gross Utility Power Capacity
Prime Esbjerg ESB01 Data Center Nordre Tovrupvej Denmark Prime Data Centers Nordre Tovrupvej, 6705 Esbjerg, Denmark Q4 2033 (Full 550MW Campus Buildout) Under Development / Planned 650 MW Gross Utility Power Capacity
Île-de-France AI Infrastructure Campus Ardian Verne Paris France Greater Paris Metropolitan Area, Île-de-France, France Q4 2029 (Full 120MW IT Buildout) Under Development / Planned 150 MW Gross Utility Power Capacity
Goodman AMS01 Data Centre (Amsterdam) Hybrideweg 101, 2141 DM Vijfhuizen, Netherlands Expected 2027–2028 Planning & Power Secured / Under Development 76.0 MW Secured Power Capacity / 48.0 MW Total IT Load Campus Capacity
Goodman PAR01A Data Centre 13 Rue Charles Cros Tremblay en France Paris Goodman Group 13 Rue Charles Cros, 93290 Tremblay-en-France, France Q4 2028 Under Development / Planning Phase 48.0 MW Gross Utility Power Allocation / 32.0 MW Total IT Load
Goodman PAR01 Data Centre Campus 13 Rue Charles Cros, 93290 Tremblay-en-France / Paris, France Q4 2029 Under Development / Planning Phase 96.0 MW Gross Utility Power Allocation / 64.0 MW Total Campus Critical IT Load
Goodman PAR02 Data Centre Campus 34 Rue Louis Armand, 94190 Villeneuve-Saint-Georges, France Q4 2030 Under Development / Planning Phase 108.0 MW Gross Utility Power Allocation / 72.0 MW Total Campus Critical IT Load
Nscale Oslo AI Data Center Campus Norway Renewable Hydro Compute Hub Hønefoss, Buskerud, Norway Q4 2026 Operational & High-Density AI Expansion Phase 25.0 MW Gross Power Allocation / 20.0 MW Critical IT Load
atNorth ICE02 Keflavik Mega Data Center Sjónarhóll Reykjanesbær Iceland Sjónarhóll 6, 235 Reykjanesbær (Keflavik), Iceland Operational / Multi-Phase High-Density Expansion Operational & High-Density Expansion Phase 80.0 MW Gross Power Allocation / 64.0 MW Critical IT Load
Microsoft Bornasco Data Center Campus Via dei Pioppi & Via Olivetti (ex Via Rimembranze), 27010 Bornasco (PV), Italy Early 2029 Under Construction Phase (Groundbreaking Q1 2026) 65.0 MW Gross Power Allocation / 50.0 MW Critical IT Power Load
Microsoft Cologne INKA Data Center Campus Bergheim terra nova Industrial Park Germany Industrial Park INKA:terra nova, 50126 Bergheim, North Rhine-Westphalia, Germany Q4 2029 Under Construction Phase (Groundbreaking Q1 2026) 115.0 MW Gross Power Allocation / 90.0 MW Critical IT Power Load
Vantage FRA2 Frankfurt II Data Center Campus – 56 MW IT Load Alexander-von-Humboldt-Strasse 4, 65479 Raunheim, Germany 2025 (56 MW total across 2 buildings) Phase 1 Operational / Phase 2 Expansion 56 MW critical IT load allocation
Northern Data European AI Mega Campus Frankfurt – 60 MW HPC Main-Biopark Industrial Zone, Frankfurt Metropolitan Area, Germany Q2 2026 (Full 60 MW IT load operational) Fully Operational / Phased Expansion 75 MW grid supply allocation
CyrusOne FRA4 Frankfurt Data Center Sossenheim – 11 MW Wilhelm-Fay-Straße 58, 65936 Frankfurt am Main, Germany Q4 2021 (Full 11 MW critical load operational across 4 floors) Fully Operational 15 MW utility grid supply
Vantage FRA13 Offenbach Frankfurt Data Center – Hyperscale Campus Goethering 27, 63067 Offenbach am Main, Hesse, Germany Q4 2024 / Q1 2025 Fully Operational / Active Phase 70 MVA Gross Grid Allocation (56 MW IT Load)
STACK Infrastructure STO01 Stockholm Sovereign Data Center – 30 MW Smedbyvägen 6, 194 30 Upplands Väsby, Stockholm, Sweden 2024 / 2025 (Complete 30 MW active across STO01A and STO01B) Fully Operational (STO01A) / Expansion Active (STO01B) 35+ MVA dedicated grid transformation capacity