Asia-Pacific (APAC)

Asia-Pacific (APAC) – Data Center Regional Overview

The Asia-Pacific (APAC) region represents one of the fastest-growing data center markets globally, driven by rapid digital transformation, expanding cloud adoption, and the exponential rise in data consumption. Strong demand from hyperscale cloud providers, telecom operators, financial institutions, and digital-native enterprises continues to fuel large-scale capacity additions across both mature and emerging markets.

Key growth drivers in APAC include increasing internet penetration, widespread mobile usage, accelerating adoption of AI, big data, and IoT technologies, and government-led digital infrastructure initiatives. Major economies such as India, Japan, Singapore, Australia, Indonesia, and Southeast Asian nations are witnessing sustained investments in hyperscale, colocation, and edge data center facilities.

The region benefits from improving subsea cable connectivity, growing availability of renewable energy, and expanding enterprise cloud migration. However, operators must navigate challenges related to land availability, power constraints, sustainability regulations, and varying data sovereignty requirements across countries.

Overall, APAC continues to evolve as a strategic hub for global and regional data center deployments, supported by a mix of established metro markets and rapidly developing secondary cities offering long-term expansion potential.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Digital Connexion’s 1GW AI Data Center Campus: Powering India’s AI Future Visakhapatnam (Vizag), Andhra Pradesh, India Expected by 2030 Announcement (MoU Signed, Pre-Construction) 1 GW
Singtel DC Tuas Tuas, Singapore 2026 Under Construction 68 MW
Digital Connexion MAA10 Ambattur Industrial Estate, Chennai, Tamil Nadu, India Planned as a multi-building campus to reach 100 MW+ of capacity. Operational (Launched/Commissioned Phase 1) 120 MW (Approximate campus-level substation capacity)
AIMS Cyberjaya Block 3 Cyberjaya, Selangor, Malaysia Ongoing expansion Completed & Operational Up to 50 MW
EDGNEX AI Data Center Campus Greater Jakarta Area, Indonesia Post-2026 Early Construction Phase Up to 144 MVA
Digital Edge EEC Hyperscale Data Center Campus (JV with B. Grimm) Eastern Economic Corridor (EEC), Chon Buri Province, Thailand The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand. Under Construction (Greenfield Project) 100 MW (IT Load for the flagship campus).
AirTrunk SYD2 Sydney North, New South Wales, Australia Expected completion of current expansion phases in 2024 Phase 4 Construction/Commissioning 120+ MVA
Keppel DC Singapore 4 (KDC SGP 4) Tampines Industrial Park, Singapore 2017 Operational 5.0 MW
CtrlS Chandan Valley Campus Chandan Valley Industrial Park, near Hyderabad, Telangana, India Phased development over several years Under Construction (Phase 1 Development) 900 MW (Total GIS Capacity - expandable)
Equinix SG4 IBX Data Center 7 Tai Seng Drive, Singapore, Singapore 535218 Ongoing phases, rapidly reached 4,000 cabinet capacity. Operational (Completed Phase I - Continual Efficiency Upgrades) $\approx 4.5\text{ kVA}$ per cabinet (Specified density)
Mumbai DC-IX Hyperscale Campus (Phase 1) Navi Mumbai, Maharashtra, India Target 2030 Active Construction (Phase 1, Data Center Block 6) 140 MW
STT Tokyo 1 & 2 Campus Inzai City, Chiba Prefecture, Greater Tokyo, Japan Target 2027 STT Tokyo 1 Operational (Launched Q2 2025); STT Tokyo 2 Under Construction 70 MW (Total IT Load)
Princeton Digital Group (PDG) TY1 Campus Saitama City, Greater Tokyo Area, Japan Completion of Phase 2 planned post-2024 Core and Shell Construction Complete (Phase 1); Fit-out Ongoing 96 MW (
AWS Asia Pacific (Malaysia) Region Kuala Lumpur/Johor Metropolitan Area, Malaysia Projected over a 15-year timeframe to reach the full committed investment capacity (through 2038). Under Development / Construction Phase Not Publicly Disclosed (Estimated at hundreds of MW of total utility capacity over the investment period).
NEXTDC TK1 Tokyo Data Centre Minato Ward, Tokyo, Japan (Adjacent to Tokyo Tower) Projected to be completed shortly after Phase 1, given the fixed, single-facility scope. Under Construction 28 MW
EDGNEX AI-Focused Data Center Campus (Jakarta) Cikarang Industrial Area, West Java (Greater Jakarta Area), Indonesia Expected completion in phases through 2028. Under Construction 144 MW
YTL Green Data Center Park (YTL GDC Park) Kulai, Johor, Malaysia (Sedenak Tech Park area, Iskandar Region) Estimated within 10 years (around 2035) Under Construction / Phased Operational (Initial phases commenced operations) 500 MW
AirTrunk SYD3 Hyperscale Data Center Campus Western Sydney, New South Wales (Huntingwood/Mamre Road Precinct) Estimated by 2027 (Full 400+ MW capacity) Phased Construction/Expansion (Operational and scaling) 400+ MW (IT Load)
HITC & Evolution Data Centres Joint Venture (Ho Chi Minh City Development) Ho Chi Minh City (HCMC) and Hanoi (Expansion of EcoDC) Phased development over several years Strategic Joint Venture Announced (Today) / Planning & Development Large-scale (Specific figures pending development phases)
NEXTDC S7/OpenAI AI Campus (OpenAI for Australia Initiative) Eastern Creek, Western Sydney, Australia Phased development over several years Major Partnership Announced / Planning & Development Up to 550 MW
NextGen Data Center and Cloud Services Navanakorn Industrial Estate, Pathum Thani, Thailand Phased over several years Approved by BOI; Under Development/Construction 84 MW (IT Load)
Osaka North 1 Data Center Campus Ibaraki City, Osaka Prefecture, Japan Expected 2032 (for the full 36 MW campus) Under Development/Construction 18 MW (IT Load - Phase 1)
Goodman Tsukuba Data Center Campus Tsukuba, Ibaraki Prefecture, Greater Tokyo, Japan Phased, potentially early 2030s Announced/Pre-Construction (Construction Start Imminent) Up to 1 GW (Planned total site capacity)
Reliance-NVIDIA AI Data Centre Campus Jamnagar, Gujarat, India Est. 2030+ (To reach 3 GW capacity) Announced / Pre-development and Planning Planned 3,000 MW (3 GW)
EdgeConneX Osaka-Kyoto Data Center Campus Greater Osaka-Kyoto Area (Kansai Region), Japan Phased completion over multiple years Announced / Planning & Land Lease Secured 200+ MW (Total campus build-out)
DeStarlink Genesis-1 / Orbit AI Low-Earth Orbit (LEO), Global Coverage Expansion to 5–8 orbital nodes in 2026; Constellation by 2028–2030. Launched/Operational (First Satellite Node) TBD (Designed for maximum solar energy capture)
DayOne and Gaw Capital Fuchu Campus Fuchu Intelligent Park, Fuchu City, Greater Tokyo, Japan Phased, Post-2028 Groundbreaking (Phase One) 80 MW (Total IT Capacity)
AirTrunk JHB1 Johor Bahru Jalan Johor Jaya, Johor Bahru, Malaysia Expected 2027 Operational (Phase 1) / Expanding 150 MW Total Campus Capacity
Google Malaysia Hyperscale Campus Elmina Business Park, Selangor, Malaysia 2028 Under Construction (Energy Procurement Secured) 200 MW Grid Allotment
DayOne SIJORI Hyperscale Hub (Singapore Anchor) Tai Seng / Jurong Cluster, Singapore 2028 Active Expansion / Series C Funding Finalized 120 MW (Singapore Node)
Vantage KUL2 Data Center Campus Cyberjaya, Selangor, Malaysia 2028 Phase 1 Operational / Under Construction (Ongoing) 256 MW (Initial KUL2 Scope)
NRT14 (Inzai Campus Building 3) Inzai City, Chiba Prefecture (Greater Tokyo), Japan Q1 2026 Nearing Completion / Commissioning (Dec 2025) Up to 70 kW per rack (High Density)
Digital Realty NRT14 (Inzai Campus) Inzai City, Chiba Prefecture (Greater Tokyo), Japan Late 2026 Live / Operational 31 MW IT Load with 70kW/rack density
STT Jakarta 3 Bekasi, Greater Jakarta, Indonesia Late 2026 Live / Operational 36 MW (High-Density Support)
AirTrunk OSK2 (East Osaka) East Osaka, Kansai Region, Japan 2027 Live / Operational (Initial Phase) 110 MW (High-Density ready)
DayOne SIJORI AI-Ready Hub in Singapore Cross-border SIJORI Corridor 2028 Construction / Expansion Phase 1,000 MW Dedicated to AI Workloads
DayOne SIJORI AI-Ready Hub Malaysia Cross-border SIJORI Corridor, batam 2028 Construction / Expansion Phase 1,000 MW Dedicated to AI Workloads
DayOne SIJORI AI-Ready Hub in Indonesia Cross-border SIJORI Corridor 2028 Construction / Expansion Phase 1,000 MW Dedicated to AI Workloads
Google Cloud Thailand Region Greater Bangkok Area 2028 Live / General Availability (Ceremony: Jan 20, 2026) Initial 150 MW Entitlement
Vantage JHB1 Hyperscale Data Center Sedenak Tech Park (STeP), Kulai, Johor Projected Q4 2027 Phase 1 Operational / Phase 2 Construction (Go-Live Jan 2026) 300 MW Total Utility Feed
Microsoft New Zealand Cloud Region (NNZ) Multi-site (North and West Auckland) Expected by 2028 Live / Operational Scalable up to 100+ MW at full buildout
Google Cloud Bangkok Region (asia-southeast3) Multi-site (3 Availability Zones in Bangkok Metro) Estimated 2028 Live / Operational 150 MW Initial Entitlement
ML1 Data Center (A-FLOW Campus) Biñan, Laguna 2027 Live / Operational 6 MW (Phase 1) / 36 MW Total Campus
AirTrunk MEL2 - Melbourne North-West Melbourne’s North-West Suburbs 2029 Under Construction (Multi-Phase) Dedicated On-site High-Voltage Substation
HiCloud Shanghai Underwater Data Center (UDC) 35m Below Sea Level, off the coast of Lin-gang 2027 (Scaling to 500 MW) Operational (Phase 1 Complete) 24 MW Total (Scaling to 500 MW in future phases)
Google Chonburi (TH-1) Data Center WHA Eastern Industrial Estate (EEC) 2029 (Projected) Phase 1 Operational / Expansion Approval 120 MW (Initial Operational Load)
FutureGrid Accelerator (Jurong Island Campus) NTU Electrification and Power Grids Centre (EPGC) Scaling across STT GDC Global Sites (2026-2027) Launched / Operational (Testbed Phase) Validated at 325kW; Expandable to Multi-MW
Digital Edge CGK Campus GIIC Industrial Estate, Kota Deltamas, Bekasi Q2 2027 Announced / Phase 1 Under Construction 500 MW (Current Phase) / 1,000 MW (Full Buildout)
Nxtra Mumbai IV (Rabale Campus) Rabale, Navi Mumbai, Maharashtra 2027 Under Construction / Phased Expansion Dual feed from 220kV/110kV substations
Lumina Chennai 1 Ambattur Industrial Estate, Chennai, Tamil Nadu H2 2026 Under Construction / Groundbreaking Dedicated on-site 230kV Substation
G42-FPT Vietnam 1GW AI Hyperscale Data Center Strategic High-Tech Zone, Ho Chi Minh City 2030 Announced / Framework Agreement Signed 1,000 MW (Total Site Potential)
Anaplan AWS Singapore: 500MW AI-Driven Data Infrastructure Strategic Industrial Zone, Singapore Scheduled for Q4 2027 Live / Operational 120 MW Initial
KDDI Sakai Osaka: 57,000sqm AI-Ready Data Center with GB200 Sakai City, Osaka Prefecture, Japan February 23, 2026 (AI/Quantum Ready) Live / Fully Operational 120 MW
Macquarie-Gabia Ansan: 100MW AI Data Center South Korea Ansan, Gyeonggi Province 2030 Announced / Permitting 40 MW (Ansan Site); 100 MW+ (Full Platform)
AirTrunk TOK1: $1.2B 300MW+ Hyperscale AI Data Center Tokyo Inzai, Tokyo Metropolitan Region 2028 Operational / Under Expansion 300 MW+ (Scalable Master Plan)
Amazon BNE3: $535M Robotics Fulfillment Center Brisbane Queensland, Brisbane (Greater Flagstone) 2028 Announced / Construction Commenced Area: 150,000 sqm; Floors: 4; Capacity: 125M+ Packages/Year.
Equinix SG6: $260M 20MW AI-Ready Data Center Singapore Jalan Tukang, Jurong (Near SG5 Tanjong Kling), Singapore 2027 Under Construction (Awarded Mar 2026) 20 MW
Adani-Google Vizag: $15B 1GW AI Data Center Hub India Tarluwada, Visakhapatnam 2030 Groundbreaking / Land Handover (March 2026) 1,000 MW (Gigawatt Scale)
AWS Thailand: $5B 3-AZ Cloud & AI Region Bangkok Bangkok, Metropolitan Area 2037 (End of 15-year plan) Operational (Launched Jan 2025) / Expanding (2026) Hyperscale Utility Allocation
Tata OpenAI India: 1GW HyperVault AI Data Center Starting with Mumbai/Navi Mumbai hub 2028-2030 Initial Phase Operational / Rapid Scaling Phase 1,000 MW (1 GW)
Digital Connexion Vizag: $11B 1GW Reliance Brookfield AI Data Center Visakhapatnam Industrial Zone 2030 Under Construction (Phase 1 Groundbreaking) 1,000 MW (1 GW)
Nxtra Google India: $15B 1GW AI Data Center Campus Visakhapatnam (Andhra Pradesh) 2029 Under Construction / Utility Integration (April 2026) 1,000 MW (1 GW)