Digital Connexion’s 1GW AI Data Center Campus: Powering India’s AI Future |
Visakhapatnam (Vizag), Andhra Pradesh, India |
Expected by 2030 |
Announcement (MoU Signed, Pre-Construction) |
1 GW |
|
|
Singtel DC Tuas |
Tuas, Singapore |
2026 |
Under Construction |
68 MW |
|
|
Digital Connexion MAA10 |
Ambattur Industrial Estate, Chennai, Tamil Nadu, India |
Planned as a multi-building campus to reach 100 MW+ of capacity. |
Operational (Launched/Commissioned Phase 1) |
120 MW (Approximate campus-level substation capacity) |
|
|
AIMS Cyberjaya Block 3 |
Cyberjaya, Selangor, Malaysia |
Ongoing expansion |
Completed & Operational |
Up to 50 MW |
|
|
EDGNEX AI Data Center Campus |
Greater Jakarta Area, Indonesia |
Post-2026 |
Early Construction Phase |
Up to 144 MVA |
|
|
Digital Edge EEC Hyperscale Data Center Campus (JV with B. Grimm) |
Eastern Economic Corridor (EEC), Chon Buri Province, Thailand |
The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand. |
Under Construction (Greenfield Project) |
100 MW (IT Load for the flagship campus). |
|
|
AirTrunk SYD2 |
Sydney North, New South Wales, Australia |
Expected completion of current expansion phases in 2024 |
Phase 4 Construction/Commissioning |
120+ MVA |
|
|
Keppel DC Singapore 4 (KDC SGP 4) |
Tampines Industrial Park, Singapore |
2017 |
Operational |
5.0 MW |
|
|
CtrlS Chandan Valley Campus |
Chandan Valley Industrial Park, near Hyderabad, Telangana, India |
Phased development over several years |
Under Construction (Phase 1 Development) |
900 MW (Total GIS Capacity - expandable) |
|
|
Equinix SG4 IBX Data Center |
7 Tai Seng Drive, Singapore, Singapore 535218 |
Ongoing phases, rapidly reached 4,000 cabinet capacity. |
Operational (Completed Phase I - Continual Efficiency Upgrades) |
$\approx 4.5\text{ kVA}$ per cabinet (Specified density) |
|
|
Mumbai DC-IX Hyperscale Campus (Phase 1) |
Navi Mumbai, Maharashtra, India |
Target 2030 |
Active Construction (Phase 1, Data Center Block 6) |
140 MW |
|
|
STT Tokyo 1 & 2 Campus |
Inzai City, Chiba Prefecture, Greater Tokyo, Japan |
Target 2027 |
STT Tokyo 1 Operational (Launched Q2 2025); STT Tokyo 2 Under Construction |
70 MW (Total IT Load) |
|
|
Princeton Digital Group (PDG) TY1 Campus |
Saitama City, Greater Tokyo Area, Japan |
Completion of Phase 2 planned post-2024 |
Core and Shell Construction Complete (Phase 1); Fit-out Ongoing |
96 MW ( |
|
|
AWS Asia Pacific (Malaysia) Region |
Kuala Lumpur/Johor Metropolitan Area, Malaysia |
Projected over a 15-year timeframe to reach the full committed investment capacity (through 2038). |
Under Development / Construction Phase |
Not Publicly Disclosed (Estimated at hundreds of MW of total utility capacity over the investment period). |
|
|
NEXTDC TK1 Tokyo Data Centre |
Minato Ward, Tokyo, Japan (Adjacent to Tokyo Tower) |
Projected to be completed shortly after Phase 1, given the fixed, single-facility scope. |
Under Construction |
28 MW |
|
|
EDGNEX AI-Focused Data Center Campus (Jakarta) |
Cikarang Industrial Area, West Java (Greater Jakarta Area), Indonesia |
Expected completion in phases through 2028. |
Under Construction |
144 MW |
|
|
YTL Green Data Center Park (YTL GDC Park) |
Kulai, Johor, Malaysia (Sedenak Tech Park area, Iskandar Region) |
Estimated within 10 years (around 2035) |
Under Construction / Phased Operational (Initial phases commenced operations) |
500 MW |
|
|
AirTrunk SYD3 Hyperscale Data Center Campus |
Western Sydney, New South Wales (Huntingwood/Mamre Road Precinct) |
Estimated by 2027 (Full 400+ MW capacity) |
Phased Construction/Expansion (Operational and scaling) |
400+ MW (IT Load) |
|
|
HITC & Evolution Data Centres Joint Venture (Ho Chi Minh City Development) |
Ho Chi Minh City (HCMC) and Hanoi (Expansion of EcoDC) |
Phased development over several years |
Strategic Joint Venture Announced (Today) / Planning & Development |
Large-scale (Specific figures pending development phases) |
|
|
NEXTDC S7/OpenAI AI Campus (OpenAI for Australia Initiative) |
Eastern Creek, Western Sydney, Australia |
Phased development over several years |
Major Partnership Announced / Planning & Development |
Up to 550 MW |
|
|
NextGen Data Center and Cloud Services |
Navanakorn Industrial Estate, Pathum Thani, Thailand |
Phased over several years |
Approved by BOI; Under Development/Construction |
84 MW (IT Load) |
|
|
Osaka North 1 Data Center Campus |
Ibaraki City, Osaka Prefecture, Japan |
Expected 2032 (for the full 36 MW campus) |
Under Development/Construction |
18 MW (IT Load - Phase 1) |
|
|
Goodman Tsukuba Data Center Campus |
Tsukuba, Ibaraki Prefecture, Greater Tokyo, Japan |
Phased, potentially early 2030s |
Announced/Pre-Construction (Construction Start Imminent) |
Up to 1 GW (Planned total site capacity) |
|
|
Reliance-NVIDIA AI Data Centre Campus |
Jamnagar, Gujarat, India |
Est. 2030+ (To reach 3 GW capacity) |
Announced / Pre-development and Planning |
Planned 3,000 MW (3 GW) |
|
|
EdgeConneX Osaka-Kyoto Data Center Campus |
Greater Osaka-Kyoto Area (Kansai Region), Japan |
Phased completion over multiple years |
Announced / Planning & Land Lease Secured |
200+ MW (Total campus build-out) |
|
|
DeStarlink Genesis-1 / Orbit AI |
Low-Earth Orbit (LEO), Global Coverage |
Expansion to 5–8 orbital nodes in 2026; Constellation by 2028–2030. |
Launched/Operational (First Satellite Node) |
TBD (Designed for maximum solar energy capture) |
|
|
DayOne and Gaw Capital Fuchu Campus |
Fuchu Intelligent Park, Fuchu City, Greater Tokyo, Japan |
Phased, Post-2028 |
Groundbreaking (Phase One) |
80 MW (Total IT Capacity) |
|
|
AirTrunk JHB1 Johor Bahru |
Jalan Johor Jaya, Johor Bahru, Malaysia |
Expected 2027 |
Operational (Phase 1) / Expanding |
150 MW Total Campus Capacity |
|
|
Google Malaysia Hyperscale Campus |
Elmina Business Park, Selangor, Malaysia |
2028 |
Under Construction (Energy Procurement Secured) |
200 MW Grid Allotment |
|
|
DayOne SIJORI Hyperscale Hub (Singapore Anchor) |
Tai Seng / Jurong Cluster, Singapore |
2028 |
Active Expansion / Series C Funding Finalized |
120 MW (Singapore Node) |
|
|
Vantage KUL2 Data Center Campus |
Cyberjaya, Selangor, Malaysia |
2028 |
Phase 1 Operational / Under Construction (Ongoing) |
256 MW (Initial KUL2 Scope) |
|
|
NRT14 (Inzai Campus Building 3) |
Inzai City, Chiba Prefecture (Greater Tokyo), Japan |
Q1 2026 |
Nearing Completion / Commissioning (Dec 2025) |
Up to 70 kW per rack (High Density) |
|
|
Digital Realty NRT14 (Inzai Campus) |
Inzai City, Chiba Prefecture (Greater Tokyo), Japan |
Late 2026 |
Live / Operational |
31 MW IT Load with 70kW/rack density |
|
|
STT Jakarta 3 |
Bekasi, Greater Jakarta, Indonesia |
Late 2026 |
Live / Operational |
36 MW (High-Density Support) |
|
|
AirTrunk OSK2 (East Osaka) |
East Osaka, Kansai Region, Japan |
2027 |
Live / Operational (Initial Phase) |
110 MW (High-Density ready) |
|
|
DayOne SIJORI AI-Ready Hub in Singapore |
Cross-border SIJORI Corridor |
2028 |
Construction / Expansion Phase |
1,000 MW Dedicated to AI Workloads |
|
|
DayOne SIJORI AI-Ready Hub Malaysia |
Cross-border SIJORI Corridor, batam |
2028 |
Construction / Expansion Phase |
1,000 MW Dedicated to AI Workloads |
|
|
DayOne SIJORI AI-Ready Hub in Indonesia |
Cross-border SIJORI Corridor |
2028 |
Construction / Expansion Phase |
1,000 MW Dedicated to AI Workloads |
|
|
Google Cloud Thailand Region |
Greater Bangkok Area |
2028 |
Live / General Availability (Ceremony: Jan 20, 2026) |
Initial 150 MW Entitlement |
|
|
Vantage JHB1 Hyperscale Data Center |
Sedenak Tech Park (STeP), Kulai, Johor |
Projected Q4 2027 |
Phase 1 Operational / Phase 2 Construction (Go-Live Jan 2026) |
300 MW Total Utility Feed |
|
|
Microsoft New Zealand Cloud Region (NNZ) |
Multi-site (North and West Auckland) |
Expected by 2028 |
Live / Operational |
Scalable up to 100+ MW at full buildout |
|
|
Google Cloud Bangkok Region (asia-southeast3) |
Multi-site (3 Availability Zones in Bangkok Metro) |
Estimated 2028 |
Live / Operational |
150 MW Initial Entitlement |
|
|
ML1 Data Center (A-FLOW Campus) |
Biñan, Laguna |
2027 |
Live / Operational |
6 MW (Phase 1) / 36 MW Total Campus |
|
|
AirTrunk MEL2 - Melbourne North-West |
Melbourne’s North-West Suburbs |
2029 |
Under Construction (Multi-Phase) |
Dedicated On-site High-Voltage Substation |
|
|
HiCloud Shanghai Underwater Data Center (UDC) |
35m Below Sea Level, off the coast of Lin-gang |
2027 (Scaling to 500 MW) |
Operational (Phase 1 Complete) |
24 MW Total (Scaling to 500 MW in future phases) |
|
|
Google Chonburi (TH-1) Data Center |
WHA Eastern Industrial Estate (EEC) |
2029 (Projected) |
Phase 1 Operational / Expansion Approval |
120 MW (Initial Operational Load) |
|
|
FutureGrid Accelerator (Jurong Island Campus) |
NTU Electrification and Power Grids Centre (EPGC) |
Scaling across STT GDC Global Sites (2026-2027) |
Launched / Operational (Testbed Phase) |
Validated at 325kW; Expandable to Multi-MW |
|
|
Digital Edge CGK Campus |
GIIC Industrial Estate, Kota Deltamas, Bekasi |
Q2 2027 |
Announced / Phase 1 Under Construction |
500 MW (Current Phase) / 1,000 MW (Full Buildout) |
|
|
Nxtra Mumbai IV (Rabale Campus) |
Rabale, Navi Mumbai, Maharashtra |
2027 |
Under Construction / Phased Expansion |
Dual feed from 220kV/110kV substations |
|
|
Lumina Chennai 1 |
Ambattur Industrial Estate, Chennai, Tamil Nadu |
H2 2026 |
Under Construction / Groundbreaking |
Dedicated on-site 230kV Substation |
|
|
G42-FPT Vietnam 1GW AI Hyperscale Data Center |
Strategic High-Tech Zone, Ho Chi Minh City |
2030 |
Announced / Framework Agreement Signed |
1,000 MW (Total Site Potential) |
|
|
Anaplan AWS Singapore: 500MW AI-Driven Data Infrastructure |
Strategic Industrial Zone, Singapore |
Scheduled for Q4 2027 |
Live / Operational |
120 MW Initial |
|
|
KDDI Sakai Osaka: 57,000sqm AI-Ready Data Center with GB200 |
Sakai City, Osaka Prefecture, Japan |
February 23, 2026 (AI/Quantum Ready) |
Live / Fully Operational |
120 MW |
|
|
Macquarie-Gabia Ansan: 100MW AI Data Center South Korea |
Ansan, Gyeonggi Province |
2030 |
Announced / Permitting |
40 MW (Ansan Site); 100 MW+ (Full Platform) |
|
|
AirTrunk TOK1: $1.2B 300MW+ Hyperscale AI Data Center Tokyo |
Inzai, Tokyo Metropolitan Region |
2028 |
Operational / Under Expansion |
300 MW+ (Scalable Master Plan) |
|
|
Amazon BNE3: $535M Robotics Fulfillment Center Brisbane |
Queensland, Brisbane (Greater Flagstone) |
2028 |
Announced / Construction Commenced |
Area: 150,000 sqm; Floors: 4; Capacity: 125M+ Packages/Year. |
|
|
Equinix SG6: $260M 20MW AI-Ready Data Center Singapore |
Jalan Tukang, Jurong (Near SG5 Tanjong Kling), Singapore |
2027 |
Under Construction (Awarded Mar 2026) |
20 MW |
|
|
Adani-Google Vizag: $15B 1GW AI Data Center Hub India |
Tarluwada, Visakhapatnam |
2030 |
Groundbreaking / Land Handover (March 2026) |
1,000 MW (Gigawatt Scale) |
|
|
AWS Thailand: $5B 3-AZ Cloud & AI Region Bangkok |
Bangkok, Metropolitan Area |
2037 (End of 15-year plan) |
Operational (Launched Jan 2025) / Expanding (2026) |
Hyperscale Utility Allocation |
|
|
Tata OpenAI India: 1GW HyperVault AI Data Center |
Starting with Mumbai/Navi Mumbai hub |
2028-2030 |
Initial Phase Operational / Rapid Scaling Phase |
1,000 MW (1 GW) |
|
|
Digital Connexion Vizag: $11B 1GW Reliance Brookfield AI Data Center |
Visakhapatnam Industrial Zone |
2030 |
Under Construction (Phase 1 Groundbreaking) |
1,000 MW (1 GW) |
|
|
Nxtra Google India: $15B 1GW AI Data Center Campus |
Visakhapatnam (Andhra Pradesh) |
2029 |
Under Construction / Utility Integration (April 2026) |
1,000 MW (1 GW) |
|