Digital Connexion’s 1GW AI Data Center Campus: Powering India’s AI Future |
Visakhapatnam (Vizag), Andhra Pradesh, India |
Expected by 2030 |
Announcement (MoU Signed, Pre-Construction) |
1 GW |
|
|
Singtel Tuas Data Center | Next-Generation Digital Infrastructure Facility in Singapore |
Tuas, Singapore |
2026 |
Under Construction |
68 MW |
|
|
Digital Connexion MAA10 Chennai Data Center |
Ambattur Industrial Estate, Chennai, Tamil Nadu, India |
Planned as a multi-building campus to reach 100 MW+ of capacity. |
Operational (Launched/Commissioned Phase 1) |
120 MW (Approximate campus-level substation capacity) |
|
|
AIMS Cyberjaya Block 3 |
Cyberjaya, Selangor, Malaysia |
Ongoing expansion |
Completed & Operational |
Up to 50 MW |
|
|
EDGNEX Artificial Intelligence Data Center Campus |
Greater Jakarta Area, Indonesia |
Post-2026 |
Early Construction Phase |
Up to 144 MVA |
|
|
EEC Hyperscale Data Center Campus Digital Edge |
Eastern Economic Corridor (EEC), Chon Buri Province, Thailand |
The partnership aims to develop multiple next-generation hyperscale and AI-ready data center campuses across Thailand. |
Under Construction (Greenfield Project) |
100 MW (IT Load for the flagship campus). |
|
|
AirTrunk SYD2 |
Sydney North, New South Wales, Australia |
Expected completion of current expansion phases in 2024 |
Phase 4 Construction/Commissioning |
120+ MVA |
|
|
Keppel DC SGP 4 | High-Performance Colocation & Interconnection Facility in Singapore |
Tampines Industrial Park, Singapore |
2017 |
Operational |
5.0 MW |
|
|
CtrlS Chandan Valley Data Center Campus |
Chandan Valley Industrial Park, near Hyderabad, Telangana, India |
Phased development over several years |
Under Construction (Phase 1 Development) |
900 MW (Total GIS Capacity - expandable) |
|
|
Equinix SG4 IBX Data Center |
7 Tai Seng Drive, Singapore, Singapore 535218 |
Ongoing phases, rapidly reached 4,000 cabinet capacity. |
Operational (Completed Phase I - Continual Efficiency Upgrades) |
$\approx 4.5\text{ kVA}$ per cabinet (Specified density) |
|
|
Mumbai DC-IX Hyperscale Campus (Phase 1) |
Navi Mumbai, Maharashtra, India |
Target 2030 |
Active Construction (Phase 1, Data Center Block 6) |
140 MW |
|
|
STT Tokyo 1 & 2 Campus |
Inzai City, Chiba Prefecture, Greater Tokyo, Japan |
Target 2027 |
STT Tokyo 1 Operational (Launched Q2 2025); STT Tokyo 2 Under Construction |
70 MW (Total IT Load) |
|
|
PDG TY1 Campus | Next-Generation Digital Infrastructure & Colocation Hub |
Saitama City, Greater Tokyo Area, Japan |
Completion of Phase 2 planned post-2024 |
Core and Shell Construction Complete (Phase 1); Fit-out Ongoing |
96 MW ( |
|
|
AWS Malaysia Region Infrastructure |
Kuala Lumpur/Johor Metropolitan Area, Malaysia |
Projected over a 15-year timeframe to reach the full committed investment capacity (through 2038). |
Under Development / Construction Phase |
Not Publicly Disclosed (Estimated at hundreds of MW of total utility capacity over the investment period). |
|
|
TK1 Tokyo Data Centre | High-Performance AI-Ready Compute & Connectivity Hub |
Minato Ward, Tokyo, Japan (Adjacent to Tokyo Tower) |
Projected to be completed shortly after Phase 1, given the fixed, single-facility scope. |
Under Construction |
28 MW |
|
|
AI Data Center Campus in Jakarta by EDGNEX |
Cikarang Industrial Area, West Java (Greater Jakarta Area), Indonesia |
Expected completion in phases through 2028. |
Under Construction |
144 MW |
|
|
YTL GDC Park | Next-Generation Green Data Center & Digital Infrastructure Hub |
Kulai, Johor, Malaysia (Sedenak Tech Park area, Iskandar Region) |
Estimated within 10 years (around 2035) |
Under Construction / Phased Operational (Initial phases commenced operations) |
500 MW |
|
|
AirTrunk SYD3 Hyperscale Data Center Campus |
Western Sydney, New South Wales (Huntingwood/Mamre Road Precinct) |
Estimated by 2027 (Full 400+ MW capacity) |
Phased Construction/Expansion (Operational and scaling) |
400+ MW (IT Load) |
|
|
HITC–Evolution Data Centres Joint Venture | Next-Gen Colocation & Cloud Hub in Vietnam |
Ho Chi Minh City (HCMC) and Hanoi (Expansion of EcoDC) |
Phased development over several years |
Strategic Joint Venture Announced (Today) / Planning & Development |
Large-scale (Specific figures pending development phases) |
|
|
NEXTDC S7/OpenAI AI Campus |
Eastern Creek, New Sydney, Australia |
Phased development over several years |
Major Partnership Announced / Planning & Development |
Up to 550 MW |
|
|
NextGen Data Center and Cloud Services | High-Performance Hyperscale Infrastructure Solutions |
Navanakorn Industrial Estate, Pathum Thani, Thailand |
Phased over several years |
Approved by BOI; Under Development/Construction |
84 MW (IT Load) |
|
|
Osaka North 1 Data Center | Next-Generation Colocation & Digital Infrastructure Campus |
Ibaraki City, Osaka Prefecture, Japan |
Expected 2032 (for the full 36 MW campus) |
Under Development/Construction |
18 MW (IT Load - Phase 1) |
|
|
Tsukuba Data Center Campus | Goodman AI-Ready Digital Infrastructure Hub |
Tsukuba, Ibaraki Prefecture, Greater Tokyo, Japan |
Phased, potentially early 2030s |
Announced/Pre-Construction (Construction Start Imminent) |
Up to 1 GW (Planned total site capacity) |
|
|
Reliance NVIDIA AI Campus | Next-Generation GPU Compute & Data Centre Platform |
Jamnagar, Gujarat, India |
Est. 2030+ (To reach 3 GW capacity) |
Announced / Pre-development and Planning |
Planned 3,000 MW (3 GW) |
|
|
Osaka-Kyoto Data Center Campus EdgeConneX |
Greater Osaka-Kyoto Area (Kansai Region), Japan |
Phased completion over multiple years |
Announced / Planning & Land Lease Secured |
200+ MW (Total campus build-out) |
|
|
DeStarlink Genesis-1 | Orbit AI Compute & Cloud Infrastructure Hub |
Low-Earth Orbit (LEO), Global Coverage |
Expansion to 5–8 orbital nodes in 2026; Constellation by 2028–2030. |
Launched/Operational (First Satellite Node) |
TBD (Designed for maximum solar energy capture) |
|
|
Fuchu Data Center Campus DayOne Gaw Capital |
Fuchu Intelligent Park, Fuchu City, Greater Tokyo, Japan |
Phased, Post-2028 |
Groundbreaking (Phase One) |
80 MW (Total IT Capacity) |
|
|
AirTrunk JHB1 Johor Bahru |
Jalan Johor Jaya, Johor Bahru, Malaysia |
Expected 2027 |
Operational (Phase 1) / Expanding |
150 MW Total Campus Capacity |
|
|
Google Malaysia Hyperscale Campus | Scalable AI & Cloud Compute Facility |
Elmina Business Park, Selangor, Malaysia |
2028 |
Under Construction (Energy Procurement Secured) |
200 MW Grid Allotment |
|
|
DayOne SIJORI Hyperscale Hub (Singapore Anchor) |
Tai Seng / Jurong Cluster, Singapore |
2028 |
Active Expansion / Series C Funding Finalized |
120 MW (Singapore Node) |
|
|
KUL2 Data Center Campus | High-Performance AI-Ready Compute Hub in Malaysia |
Cyberjaya, Selangor, Malaysia |
2028 |
Phase 1 Operational / Under Construction (Ongoing) |
256 MW (Initial KUL2 Scope) |
|
|
Inzai Campus Building 3 (NRT14) | Secure Hyperscale Cloud & Interconnection Hub |
Inzai City, Chiba Prefecture (Greater Tokyo), Japan |
Q1 2026 |
Nearing Completion / Commissioning (Dec 2025) |
Up to 70 kW per rack (High Density) |
|
|
Digital Realty NRT14 (Inzai Campus) |
Inzai City, Chiba Prefecture (Greater Tokyo), Japan |
Late 2026 |
Live / Operational |
31 MW IT Load with 70kW/rack density |
|
|
STT Jakarta 3 |
Bekasi, Greater Jakarta, Indonesia |
Late 2026 |
Live / Operational |
36 MW (High-Density Support) |
|
|
AirTrunk OSK2 Infrastructure in East Osaka |
East Osaka, Kansai Region, Japan |
2027 |
Live / Operational (Initial Phase) |
110 MW (High-Density ready) |
|
|
Cross-Border AI Infrastructure: DayOne SIJORI Data Center Hub |
Cross-border SIJORI Corridor |
2028 |
Construction / Expansion Phase |
1,000 MW Dedicated to AI Workloads |
|
|
DayOne SIJORI AI Data Center Hub in Malaysia |
Cross-border SIJORI Corridor, batam |
2028 |
Construction / Expansion Phase |
1,000 MW Dedicated to AI Workloads |
|
|
DayOne Expands AI Infrastructure with Sijori Hub Data Center Campus in Indonesia |
Cross-border SIJORI Corridor |
2028 |
Construction / Expansion Phase |
1,000 MW Dedicated to AI Workloads |
|
|
Google Cloud Thailand Region | Enterprise Cloud & Digital Infrastructure Hub |
Greater Bangkok Area |
2028 |
Live / General Availability (Ceremony: Jan 20, 2026) |
Initial 150 MW Entitlement |
|
|
Vantage JHB1 Johannesburg | Next-Generation Hyperscale Colocation & Digital Infrastructure Facility |
Sedenak Tech Park (STeP), Kulai, Johor |
Projected Q4 2027 |
Phase 1 Operational / Phase 2 Construction (Go-Live Jan 2026) |
300 MW Total Utility Feed |
|
|
Microsoft New Zealand NNZ | Advanced Cloud & Data Center Platform |
Multi-site (North and West Auckland) |
Expected by 2028 |
Live / Operational |
Scalable up to 100+ MW at full buildout |
|
|
Google Cloud asia-southeast3 Bangkok Region | Scalable AI & Cloud Services Platform |
Multi-site (3 Availability Zones in Bangkok Metro) |
Estimated 2028 |
Live / Operational |
150 MW Initial Entitlement |
|
|
ML1 Data Center (A-FLOW Campus) |
Biñan, Laguna |
2027 |
Live / Operational |
6 MW (Phase 1) / 36 MW Total Campus |
|
|
AirTrunk MEL2 - Melbourne North-West |
Melbourne’s North-West Suburbs |
2029 |
Under Construction (Multi-Phase) |
Dedicated On-site High-Voltage Substation |
|
|
HiCloud Shanghai UDC | High-Efficiency Underwater AI & Cloud Infrastructure Platform |
35m Below Sea Level, off the coast of Lin-gang |
2027 (Scaling to 500 MW) |
Operational (Phase 1 Complete) |
24 MW Total (Scaling to 500 MW in future phases) |
|
|
Google Chonburi (TH-1) | Secure Hyperscale AI & Cloud Data Center Facility |
WHA Eastern Industrial Estate (EEC) |
2029 (Projected) |
Phase 1 Operational / Expansion Approval |
120 MW (Initial Operational Load) |
|
|
FutureGrid Accelerator Jurong Island | Next-Generation Data Center Campus |
NTU Electrification and Power Grids Centre (EPGC) |
Scaling across STT GDC Global Sites (2026-2027) |
Launched / Operational (Testbed Phase) |
Validated at 325kW; Expandable to Multi-MW |
|
|
Digital Edge CGK Campus |
GIIC Industrial Estate, Kota Deltamas, Bekasi |
Q2 2027 |
Announced / Phase 1 Under Construction |
500 MW (Current Phase) / 1,000 MW (Full Buildout) |
|
|
Mumbai IV Data Center | Nxtra AI-Ready Cloud & Connectivity Facility in Rabale |
Rabale, Navi Mumbai, Maharashtra |
2027 |
Under Construction / Phased Expansion |
Dual feed from 220kV/110kV substations |
|
|
Lumina Chennai 1 Data Center | High-Performance AI-Ready Compute Campus |
Ambattur Industrial Estate, Chennai, Tamil Nadu |
H2 2026 |
Under Construction / Groundbreaking |
Dedicated on-site 230kV Substation |
|
|
G42-FPT Vietnam 1GW AI Hyperscale Data Center |
Strategic High-Tech Zone, Ho Chi Minh City |
2030 |
Announced / Framework Agreement Signed |
1,000 MW (Total Site Potential) |
|
|
Anaplan AWS Singapore: 500MW AI-Driven Data Infrastructure |
Strategic Industrial Zone, Singapore |
Scheduled for Q4 2027 |
Live / Operational |
120 MW Initial |
|
|
KDDI Sakai Osaka: 57,000sqm AI-Ready Data Center with GB200 |
Sakai City, Osaka Prefecture, Japan |
February 23, 2026 (AI/Quantum Ready) |
Live / Fully Operational |
120 MW |
|
|
Macquarie-Gabia Ansan: 100MW AI Data Center South Korea |
Ansan, Gyeonggi Province |
2030 |
Announced / Permitting |
40 MW (Ansan Site); 100 MW+ (Full Platform) |
|
|
AirTrunk TOK1: $1.2B 300MW+ Hyperscale AI Data Center Tokyo |
Inzai, Tokyo Metropolitan Region |
2028 |
Operational / Under Expansion |
300 MW+ (Scalable Master Plan) |
|
|
Amazon BNE3: $535M Robotics Fulfillment Center Brisbane |
Queensland, Brisbane (Greater Flagstone) |
2028 |
Announced / Construction Commenced |
Area: 150,000 sqm; Floors: 4; Capacity: 125M+ Packages/Year. |
|
|
Equinix SG6: $260M 20MW AI-Ready Data Center Singapore |
Jalan Tukang, Jurong (Near SG5 Tanjong Kling), Singapore |
2027 |
Under Construction (Awarded Mar 2026) |
20 MW |
|
|
Adani-Google Vizag: $15B 1GW AI Data Center Hub India |
Tarluwada, Visakhapatnam |
2030 |
Groundbreaking / Land Handover (March 2026) |
1,000 MW (Gigawatt Scale) |
|
|
AWS Thailand: $5B 3-AZ Cloud & AI Region Bangkok |
Bangkok, Metropolitan Area |
2037 (End of 15-year plan) |
Operational (Launched Jan 2025) / Expanding (2026) |
Hyperscale Utility Allocation |
|
|
Tata OpenAI India: 1GW HyperVault AI Data Center |
Starting with Mumbai/Navi Mumbai hub |
2028-2030 |
Initial Phase Operational / Rapid Scaling Phase |
1,000 MW (1 GW) |
|
|
Digital Connexion Vizag: $11B 1GW Reliance Brookfield AI Data Center |
Visakhapatnam Industrial Zone |
2030 |
Under Construction (Phase 1 Groundbreaking) |
1,000 MW (1 GW) |
|
|
Nxtra India AI Campus | $15B Next-Generation AI Compute & Data Center Facility |
Visakhapatnam (Andhra Pradesh) |
2029 |
Under Construction / Utility Integration (April 2026) |
1,000 MW (1 GW) |
|
|
Microsoft Japan | $10B AI-Ready Sovereign Cloud Data Center Investment |
Tokyo |
2029 |
Active Expansion / New Phase Announced (April 3, 2026) |
Scalable Gigawatt-class roadmap across 4 years. |
|
|
True IDC Thailand | 250MW AI & Cloud Infrastructure Hub in the Eastern Economic Corridor |
Chonburi |
NA |
Under Construction / Groundbreaking (April 2026) |
250 MW |
|
|
CA1 Canberra Equinix Australian Government Hub |
Equinix CA1, 51 Dacre Street, Mitchell ACT 2911, Australia |
2026 (Current optimized state) |
Operational / AI-Ready Upgrade (April 2026) |
~3 MW (Phase 1 Aggregate) |
|
|
Equinix SY1 Sydney IBX | High-Connectivity 7MW AI-Ready Edge Facility |
Sydney (Mascot), NSW |
Completed / Optimized for 2026 AI standards |
Operational / High-Density Upgrade (April 2026) |
7.0 MW |
|
|
Equinix SY6 Sydney IBX | 4MW Government & AI-Ready Data Center Facility |
8-14 Egerton Street, Silverwater NSW 2128, Australia |
2026 (Current modular capacity) |
Operational / High-Density Expansion (April 2026) |
4.0 MW |
|
|
NTT DATA Keihanna OSK11 Data Center - 30MW AI-Ready Facility |
Soraku-district, Kyoto |
Operational as of April 2026 |
Operational / Live |
30 MW total IT load. |
|
|
Equinix SY8 Sydney | High-Density 4MW AI-Ready Peering Data Center |
74 Mentmore Avenue, Rosebery NSW 2018, Australia |
2026 (Current optimized capacity) |
Operational / High-Density Upgrade (April 2026) |
4.0 MW |
|
|
Equinix SY9x Sydney | AI-Ready 28MW Hyperscale Interconnection Campus |
sydney NSW 2142, Australia |
2026 (28MW) |
Operational / Phase 2 Expansion (April 2026) |
28.0 MW (Fully Built-Out) |
|
|
Equinix SY10x Sydney | 28MW AI Data Center Hub for Hyperscale Infrastructure |
10 Grand Avenue, Rosehill, Sydney |
2027 |
Implementation / Commissioning (April 2026) |
28.0 MW |
|
|
NEXTDC S1 Sydney | 16MW Tier III AI & Cloud Infrastructure Hub |
4 Eden Park Drive, Macquarie Park NSW 2113 |
2026 (Current Capacity Expansion) |
Operational / Strategic Expansion (April 2026) |
16.0 MW |
|
|
NEXTDC S2 Sydney: 30MW Tier IV Fault-Tolerant AI Hub |
6-8 Giffnock Avenue, Macquarie Park NSW 2113 |
2024 (Operations & Retrofitting for AI) |
Operational / High-Density Expansion (April 2026) |
30.0 MW |
|
|
NEXTDC S3 Sydney: 80MW Tier IV AI-Ready Flagship |
2 Broadcast Way, Artarmon NSW 2064 |
2026+ (Active Tenancy Fit-outs) |
Operational / Accelerated Fit-out (April 2026) |
80.0 MW |
|
|
NEXTDC S4 Western Sydney | 350MW Hyperscale AI & Cloud Infrastructure Campus |
Horsley Park (Western Sydney), NSW |
2030+ |
Under Construction / Groundbreaking (April 2026) |
350.0 MW |
|
|
NEXTDC M3 Melbourne Data Center | 150MW Hyperscale AI & Cloud Infrastructure Hub |
25 Indwe Street, West Footscray VIC 3012, australia |
2027 (Accelerated from 2029) |
Operational / Accelerated Expansion (April 2026) |
150.0 MW |
|
|
D1 Darwin Data Center | NEXTDC Northern Gateway AI & Cloud Infrastructure |
Darwin CBD |
2026 (Current Operational Scale) |
Operational / High-Demand Growth (April 2026) |
7.0 MW+ |
|
|
NEXTDC KL1 Kuala Lumpur | 65MW Hyperscale AI & Cloud Infrastructure Hub |
NEXTDC KL1, Kuala Lumpur |
2030+ |
Under Construction / Phased Handover (April 2026) |
65.0 MW |
|
|
NTT Melbourne 1 | Next-Gen 18MW Hyperscale AI & Connectivity Campus |
578 Lorimer Street, Port Melbourne VIC 3207 |
2026 (Modernization Phase) |
Operational / Capacity Optimization (April 2026) |
18.0 MW |
|
|
M4 Data Center | NEXTDC 162MW AI-Ready Technology Campus |
Former Westgate Park Printing Complex, port melbourne |
2030 |
Approved / Pre-Construction (April 2026) |
162.0 MW |
|
|
Darwin DRW02 20MW AI Expansion by DCI |
Strategic site in Darwin (serving the |
2027 |
Under Construction / Capacity Ramp (April 2026) |
20.0 MW |
|
|
Firmus Southgate Data Center | 36,800 GPU Green AI Supercomputing Facility |
Repurposed Industrial Site, Launceston |
Late 2026 |
Operational / Phase 1B Deployment (April 2026) |
Optimized for 36,800 GPU Cluster |
|
|
Adani Khavda: 2.0 GW Integrated AI-Compute & 30GW Green Hub |
Khavda Renewable Energy Park, Kutch |
2035 |
Operational Expansion / 951MW RE Active (April 2026) |
2,000.0 MW (2.0 GW) |
|
|
Equinix MB3 International Business Exchange (IBX) | Enterprise Data Center Solutions |
Mumbai (Chandivali, Powai), Maharashtra |
2028 |
Operational / Phase 1 Live (April 2026) |
~25.0 MW (Full Build-out potential) |
|
|
Sify Hyderabad Data Center | 250MW NVIDIA-Certified AI & Cloud Infrastructure Hub |
Fab City industrial zone |
2028 |
Active Expansion / Phased Commissioning (April 2026) |
250.0 MW |
|
|
Digital Realty MAL11 Cyberjaya Data Center |
Cyberjaya, malaysia |
Projected Completion: H2 2026 |
Operational / Phase 2 Expansion (May 2026) |
14.0 MW |
|
|
Equinix SY5 Sydney Data Center | High-Density 54MW AI Infrastructure Hub |
200 Bourke Road, Alexandria, AU |
May 2026 Completion (Final Phase cabinets live). |
Operational / Phase 3 AI-Density Upgrade (May 2026) |
54.0 MW |
|
|
Equinix KL2 Kuala Lumpur: 1.4MW High-Density Interconnection Hub |
Cyberjaya Tech Hub, Kuala Lumpur |
2028 (Estimated) |
Operational / Phase 1 Complete |
1.4 MW (Phase 1) / Scalable |
|
|
TikTok Thailand: 500MW Hyperscale Content & AI Infrastructure |
Bangkok |
2027 |
Approved / Site Preparation |
500 MW (Combined Campus Load) |
|
|
Microsoft Cloud Sumatra: 200MW Tier IV Hyperscale Facility |
West Java Industrial Corridor |
Q3 2026 |
Under Construction / Commissioning Phase |
200 MW Total Utility Power |
|
|
AirTrunk Hong Kong Hyperscale Data Center Expansion (35MW) |
Tsuen Wan |
HKG2 Full Deployment: Mid-2024 (delivered fully to global anchor cloud tenants) |
Operational |
35+ MW Total IT load (HKG1: 20+ MW |
|
|
Sedenak II Johor Data Center | Next-Gen 200MW AI Compute Campus |
Phase 2, Sedenak Industrial High-Tech Zone |
Q2 2029 |
Under Construction |
200 MW Net Allocation for Cloud & AI acceleration |
|
|
BDx Jakarta CGK3: 60MVA Liquid-Cooled AI Data Center |
Cilandak, South Jakarta City, Jakarta, Indonesia |
Comprehensive June 2026 utility energization bringing campus to full active 60 MVA capacity |
Active / Phase 1 Operational & Expansion Energization Complete (June 2026) |
60 MVA gross utility capacity delivered via fully redundant transformer feeds |
|
|
BDx Jakarta CGK5 Data Center Campus |
Suryacipta City of Industry, Jalan Kutanegara, Kutamekar, Karawang, West Java 41361, Indonesia |
Continuous modular data hall expansion and high-density rack staging pacing across the 12-acre campus layout through 2030 |
Active / Under Heavy High-Voltage Grid Construction (Tracking June 2026) |
385 MVA gross utility capacity delivered via dedicated, hardened on-site high-voltage transmission feeds |
|
|
BDx Jakarta CGK4: 788MVA Sovereign AI Data Center Campus |
Jatiluhur, Purwakarta Regency, West Java, Indonesia |
Massive June 2026 utility framework execution securing 788 MVA to drive rolling modular campus expansions through 2029 |
Active / Under Phased High-Density Expansion (Tracking June 2026) |
788 MVA gross utility line allocation feeding high-density rows scaling from 120 kW up to 200 kW per rack |
|
|
PDG Greater Jakarta JC3: $1B 120MW Green AI Campus |
Greenland International Industrial Center (GIIC), Deltamas, Bekasi Regency, Greater Jakarta, Indonesia |
2029 - Q2 |
Active / Under Heavy Structural Construction (Tracking June 2026) |
120 MW gross utility line allocation engineered to support high-density configurations utilizing advanced AI accelerator architectures |
|
|
Equinix Singapore SG5: $144M High-Density IBX Expansion |
Greenland International Industrial Center (GIIC), Deltamas, Bekasi Regency, Greater Jakarta, Indonesia |
2026 - Q3 |
Active / Under Heavy Interior Expansion (Tracking June 2026) |
30 MW gross utility allocation engineered to support power densities scaling past 30 kW per cabinet |
|
|
ZDATA Johor: $2B Platinum-Certified AI Hyperscale Campus |
FHMX+GW, 79250 Gelang Patah, Johor, Malaysia |
2027 - Q4 |
Active / Under Phased Construction & Early Testing (Tracking June 2026) |
200 MW gross ultimate utility capacity delivering ultra-high density power blocks configured for high-performance GPU clustering |
|
|
PDG Greater Jakarta JC4: 240MW AI Hyperscale Mega-Campus |
Jalan Digital Perdana, 82100 Kulai, Johor Darul Ta'zim, Malaysia |
2030 - Q2 |
Active / Groundbroken & Under Early Structural Piling (Tracking June 2026) |
240 MW gross utility allocation delivered via specialized high-voltage sub-stations built to balance extreme localized cluster spikes |
|
|
Digital Edge SEL3: $582M 60MW Incheon AI Hyperscale Hub |
422 Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea |
2027 - Q4 |
Active / Under Heavy Structural Fabrication (Tracking June 2026) |
60 MW net critical IT capacity dedicated to SEL3, supporting advanced rack densities exceeding 10kW per cabinet |
|
|
Digital Edge SEL2: 36MW Incheon AI-Ready Hyperscale Hub |
Cheongcheon-dong, Bupyeong-gu, Incheon, Greater Seoul, South Korea |
2024 - Q4 |
Active / Operational & Fully Leased (Tracking June 2026) |
36 MW net critical IT capacity optimized for high-power density applications |
|
|
Digital Edge SEL5: 60MW Ansan AI Hyperscale Project |
Sihwa National Industrial Complex, Seonggok-dong, Danwon-gu, Ansan, Gyeonggi Province, South Korea |
2029 - Q4 |
Active / Secured Land & Early Civil Design Planning (Tracking June 2026) |
60 MW net critical IT capacity supported by a dedicated 90 MVA utility allocation built to mitigate localized cluster spikes |
|
|
STT Seoul 1: 30MW Gasan-dong AI-Ready Hyperscale Hub |
54 Gasan digital 2-ro, Geumcheon District, Seoul, South Korea |
2026 - Q4 |
Active / Core Structural Completion & Final Technical Fit-Out (Tracking June 2026) |
30 MW net critical operational IT capacity supported by highly specialized, high-amp distribution frameworks |
|
|
Ansan Global Meta: Keppel's $659M 60MW Shovel-Ready AI Hub |
726-4 Wonsi-dong, Danwon-gu, Ansan, Banwol National Industrial Complex, Gyeonggi Province, South Korea |
2031 - Q2 |
Active / Land Secured & Shovel-Ready Civil Engineering Pipeline (Tracking June 2026) |
60 MW gross ultimate utility power envelope engineered to support hyper-dense server layouts and intensive training racks |
|
|
GAK Sejong: NAVER's Gigawatt-Scale NVIDIA DSX AI Factory |
824, Haengbok-daero, Sejong-si, South Korea |
2030 - Q4 |
South Korea |
Initial 55 MW rapid deployment block scaling into a long-term, multi-phase 1.0 GW gross utility power roadmap |
|
|
Empyrion KR1: 40MW Gangnam AI-Ready Carrier-Neutral Facility |
224 Yangjae-dong, Seocho-gu, Gangnam Area, Seoul, 137-130, South Korea |
2026 - Q1 |
Active / Fully Operational & Live Production Staging (Tracking June 2026) |
40 MW gross ultimate IT capacity delivered via ultra-stable, high-amperage risers optimized for accelerated computing architectures |
|
|
SK Telecom AI Cloud: Gigawatt-Scale NVIDIA DSX AI Factory |
Greater Seoul Regional Node, South Korea |
2031 - Q2 |
Active / Early Site Civil Engineering & Technology Blueprint Integration (Tracking June 2026) |
Initial multi-megawatt rapid-deployment cluster blocks scaling into a long-term, multi-site 1.0 GW gross utility power footprint |
|
|
Digital Realty ICN10: 20MW Sangam DMC High-Density Hub |
12 World Cup buk-ro 60-gil, Mapo-gu, Sangam Digital Media City (DMC), Seoul, 03922, South Korea |
2022 - Q3 |
Active / Fully Operational & Core Connectivity Node (Tracking June 2026) |
12 MW net critical operational IT load driven through an ultimate 20 MW utility power allocation designed for continuous multi-rack clustering |
|
|
PDG SE1: $700M 48MW Incheon Hyperscale AI Campus |
414-2 Cheongcheon-dong, Bupyeong-gu, Incheon, 21311, South Korea |
2028 - Q2 |
Active / Under Core Civil Construction & Excavation (Tracking June 2026) |
48 MW net critical IT capacity backed by an ultimate 80 MW gross utility allocation to support intense transient computation spikes |
|
|
Gunsan AI Campus: SGC & OCI's $300\text{MW}$ Deep Ocean-Cooled Hub |
Gunsan National Industrial Complex 2, Oehang-ro, Gunsan-si, North Jeolla Province, South Korea |
2031 - Q4 |
Active / Approved Planning & Site Allocation Phase (Tracking June 2026) |
300 MW gross ultimate utility profile starting with an initial 40 MW modular rapid-deployment hardware block |
|
|
Hyundai Gunsan: Hydrogen-Powered Blackwell AI Factory |
Reclaimed Coastal Industrial Sector, Saemangeum Industrial Complex, Gunsan, South Korea |
2032 - Q4 |
Active / Early Phase Site Mobilization & Civil Engineering (Tracking June 2026) |
Initial multi-hundred megawatt deployment scaling sequentially into a long-term 1.0 GW gross utility power footprint |
|
|
Meta Jamnagar AI Campus: Reliance's 168MW Built-to-Suit AI Hub |
Mega Industrial Manufacturing Complex Tract, Jamnagar, Gujarat, India |
2029 - Q4 |
Active / Pre-Construction & Utility Integration Phase (Tracking June 2026) |
Initial 168 MW net critical IT load footprint with contractual execution pathways to scale extensively in subsequent phases |
|
|
NTT BLR4: 100MW Hyperscale Data Center Campus in Bengaluru |
5JVV+8VF, Bengaluru, Shettigere, Karnataka 562110 |
2028 - Q4 (Targeted Integration of BLR4B and BLR4C Facilities) |
Active / Phase 1 Live & Operational (Tracking June 2026 Launch) |
100 MW gross facility load supporting 67.2 MW of aggregate net critical IT capacity across three multi-story data center blocks |
|
|
NTT DATA Bengaluru 3 Data Center (BLR3) |
Konadasapura, Khajisonnenahalli, Karnataka 560115 |
2026 - Q2 |
Active / Fully Operational & TIA-942 Upgrade Phase (Tracking June 2026) |
12.0 MW net critical IT load fully allocated across approximately 5,800 square meters of high-density server space |
|
|
CtrlS Kolkata: 60MW AI-Ready Data Center Hub in New Town |
JF77+M28, Action Area IIE, Reckjoani, New Town, West Bengal 700161 |
2027 - Q4 (Targeted Finalization of Multi-Phase Campus Deployment) |
Active / Phase 1 Live & Phase 2 Under Construction (Tracking June 2026) |
60 MW gross facility load engineered to support variable enterprise rack densities and dense cloud infrastructure blocks |
|
|
CtrlS CPP Investments: ₹7,000 Crore (C$1B) AI-Ready Indian Data Center Expansion |
industrial park, chennai |
Projected 2031 |
Strategic Joint Venture Formed / Capital Allocation Active (June 17, 2026) |
450.0 MW (JV Incremental Build Target) |
|
|
Adani Jabil AI Platform: GW-Scale Data Center Infrastructure |
Ahmedabad |
Projected 2029 |
Strategic Alliance Announced / Operational Framework Active (June 2026) |
GW-scale Equipment Output Lifecycle Capacity. |
|
|
Yotta NM1: 52MW Tier IV Certified Data Center in Panvel |
1st, 2nd & 3rd Level, Block-B, Survey No: 34, Edinburgh, Panvel, Bhokarpada, Maharashtra |
Operational with Active Upgrades through 2026 |
Fully Operational / High-Density AI-Compute Expansion Active (June 2026) |
52.0 MW Active IT Load Profile |
|
|
Yotta D1: 30MW Hyperscale Data Center in Greater Noida |
Plot No 7, Tusiana Village, Knowledge Park V, Greater Noida, Tusyana, Uttar Pradesh 201306 |
Operational with Active AI Cluster Scaling through 2026 |
Fully Operational / AI-Native Infrastructure Upgrades Active (June 2026) |
30.0 MW Total Active IT Load Profile |
|
|
Yotta NM2: 65MW High-Density Tier IV Data Center, Panvel |
Hiranandani Fortune City, Bhokarpada, Maharashtra |
NA |
Fully Operational / Advanced Compute Shell Upgrades Active (June 2026) |
35.2 MW Total Dedicated IT Load Profile |
|
|
Nxtra Pune Campus: 250MW Hyperscale Data Center & Kingsway Node, Maharashtra |
Hinjewadi Phase III, Phase 3, Hinjawadi Rajiv Gandhi Infotech Park, Hinjawadi, Man, Maharashtra 411057 |
Rolling out actively through 2026 |
Operational Phase 1 & 2 / Core AI Expansion Active (June 2026) |
40.0 MW Initial Commissioned IT Load (Phased scaling up to the 250.0 MW master plan) |
|
|
Gorilla Korat: 200MW AI Data Center Thailand |
Korat, Nakhon Ratchasima Province |
2032 |
Announced / Initial Site Prep |
200 MW total infrastructure capacity |
|
|
Batam Island: 360MW NVIDIA AI Factory & DayOne Hub Indonesia |
Pulau, Kabil, Kecamatan Nongsa, Kota Batam, Kepulauan Riau 29433, Indonesia |
2027 |
Announced / Strategic Partnership Finalized |
360 MW total master-planned grid allocation |
|
|
STT Chennai 7: 45MW AI-Ready Data Centre Campus Launch |
Siruseri IT Park, Chennai, Tamil Nadu, India. |
Scheduled for gradual deployment scaling through late 2028. |
Active Phase 1 Operation / Phase 2 Scaling (June 2026 update) |
45.0 MW Planned Campus Load Limit. |
|
|
PDG MU1: 48MW Hyperscale Data Center Campus, Navi Mumbai |
Midc Industrial Zone, Airoli, Navi Mumbai, Maharashtra 400708, India. |
Sequential building scale expansions driving modularly toward maximum campus load boundaries. |
Fully Operational / Phase 2 High-Density Expansion Active |
48.0 MW Combined Campus Critical IT Load Profile. |
|
|
KORE Digital 1560MW AI Green Data Center, Navi Mumbai |
Strategic hyperscale zone, Navi Mumbai, Maharashtra, India. |
NA |
Phase-I MOU Signed / In Development |
1,560.0 MW Total Planned Power Architecture. |
|
|
Sify Infinit Spaces 130MW AI-Ready Hyperscale Data Center, Chennai |
Chennai, Tamil Nadu |
2027 |
Under Construction / Expansion Phase (Financing secured June 2026) |
Up to 130.0 MW Total Campus Capacity across three towers. |
|
|
Web Werks Iron Mountain 85MW AI-Enabled Greenfield Data Center Campus, Rabale |
TTC Industrial Area, Rabale, Navi Mumbai, Maharashtra - 400701. |
2028 |
Under Construction (Substructure & Excavation Work in Progress as of mid-2026) |
Scalable block-modular distribution supporting ultra-high density setups (ranging from 15kW to 30kW+ per rack natively). |
|
|
CapitaLand Data Centre Mumbai 01 108MW Hyperscale Campus, Airoli-Dighe, Navi Mumbai |
Plot No 14/2, 15, 37, TTC Industrial Area, MIDC Digha Naka Dighe, Airoli, Thane, Maharashtra 400708 |
2027 |
Under Construction / Phase-wise Commissioning |
Highly scalable power delivery options capable of transitioning effortlessly from standard enterprise rack loads to ultra-dense high-performance computing setups. |
|
|
Microsoft Hyderabad India South Central Hyperscale Data Center Region |
Prime high-tech infrastructure corridor, Hyderabad, Telangana |
Continuous iterative expansion planned across all three core availability clusters |
Under Advanced Development / Operationalizing Phase |
Scaled to seamlessly support the massive power-draw fluctuations inherent to ultra-dense AI clusters and continuous cloud compute cycles. |
|
|
AdaniConneX Navi Mumbai 1000MW Hyperscale Data Center Campus Maharashtra |
Premier hyperscale data center corridor, Navi Mumbai, Maharashtra |
Major capacity blocks scheduled for late 2026 deployment and scaling progressively through the decade |
Under Advanced Multi-Phase Development |
Highly customizable power distribution systems built to support variable densities from standard cloud compute up to extreme multi-kW AI GPU clusters. |
|
|
Digital Edge Palava 270MW Hyperscale Data Center Campus Mumbai |
30-acre dedicated land parcel within the Green Integrated Data Centre Park, Palava |
NA |
Announced / Initial Planning & Site Preparation |
Scalable multi-stage power blocks engineered to deliver up to 270MW of total capability at full buildout. |
|
|
Sify Infinit Spaces Navi Mumbai Hyperscale Data Center Expansion Rabale |
Existing strategic campus footprint expansion in the IT/industrial corridors of Navi Mumbai (Rabale/Vashi area) |
2027 |
Active Development / Expansion Phase |
Purpose-built power distribution frameworks to handle extreme power density requirements demanded by modern AI and machine learning workloads. |
|
|
STT GDC Navi Mumbai Khairane AI Ready Data Center Expansion |
TTC Industrial Area, MIDC, Khairane Village, Navi Mumbai |
NA |
Early Construction & Site Development Phase |
Highly advanced power distribution configurations tailored to manage extreme densities per rack demanded by next-gen AI processing units. |
|
|
Princeton Digital Group MU2 Hyperscale Data Center Campus |
Industrial Area Navi Mumbai, Maharashtra, India |
2029 (Estimated) |
Under Construction |
120 MW utility supply via dedicated high-voltage substation feeds. |
|
|
Digital Realty Cyberjaya KUL11 32MW AI Campus |
Cyberjaya Digital District, Selangor, Malaysia |
Mid-2028 (Third Phase Completion) |
Fully Operational / Newly Launched |
32 MW Total Dedicated Grid Connection via Tenaga Nasional Berhad (TNB) |
|
|
Equinix Hong Kong HK6 30MW Greater Bay AI Gateway |
Proximity to Hong Kong–Shenzhen Innovation and Technology Park |
Mid-2027 |
Fully Operational / Newly Launched |
30 MW Dedicated Grid Supply via Redundant High-Voltage Feeders |
|
|
Digital Edge Jakarta H1: $4.5B AI-Centric Megacampus |
Cikarang Digital Zone, Greater Jakarta, Indonesia |
Q2 2032 |
Under Construction (Groundbroken Q2 2026) |
450 MW ultimate secured power allocation from the national grid |
|
|
Palava Green Integrated Data Centre Park: ₹30,000 Crore Mega Hub |
Dedicated Industrial & Logistics Zone, Palava Phase 2, Maharashtra, India |
Q4 2032 (Complete multi-building cloud and retail computing ecosystem) |
Pre-construction / Site Grading (MoU Signed May 2026) |
400 MW ultimate secured utility substation allocation |
|
|
STT GDC Palava Campus (Phase 1 Groundbreaking) |
Lodha Industrial Park, Palava Phase 2, Maharashtra, India |
Q4 2032 (Complete multi-building infrastructure deployment) |
Under Construction (Groundbroken March 18, 2026) |
400 MW ultimate secured utility grid allocation |
|