OpenAI/Oracle/SoftBank Stargate AI Infrastructure Platform |
Multiple U.S. states, including Texas (Abilene, Shackelford, Milam), New Mexico, Ohio (Lordstown), and Wisconsin (Midwest site) |
Expected by 2030 (Full 10 GW capacity) |
Confirmed / Under Rapid Construction |
10 GW (Target by 2030) |
|
|
Vantage Frontier Data Center Campus |
Shackelford County, Texas, USA |
Expected completion and full operational status by 2028. |
Construction Underway (Announced August 2025) |
1.4 GW (Total IT Load) |
|
|
Oracle Cloud Infrastructure (OCI) Chicago Region |
Greater Chicago Area, Illinois, USA |
2025. |
Operational |
Not publicly disclosed |
|
|
Microsoft AI Superfactory (Fairwater Design) - Mount Pleasant, Wisconsin |
Mount Pleasant, Wisconsin, USA |
End of 2028 |
Under Construction / Initial phases operational (announced September 2025 with $4 billion expansion) |
hundreds of MW |
|
|
Equinix DA11 International Business Exchange™ (IBX®) Data Center |
1990 North Stemmons Freeway, Dallas, TX 75207, USA |
Complete (Total colocation space $\approx 144,000 \text{ sq ft}$ with $\approx 3,850$ cabinets) |
Operational with phased expansion complete (Fully Built Out) |
$8 \times 3,000 \text{ kW}$ diesel generators |
|
|
QTS Manassas Data Center Campus |
Manassas, Prince William County, Northern Virginia, USA |
Expected to be completed over the next 5+ years. |
Under Construction / Phased Deployment |
190+ MW of critical campus capacity |
|
|
Google Cloud / NextEra GW-Scale AI Data Center Campus |
Multiple GW-scale hubs across the United States (Locations undisclosed, 3 sites already under development) |
2028-2030 |
Major Strategic Partnership Announced (Today) / Under Development |
1,000 MW (1 GW per campus target) |
|
|
CloudHQ Querétaro Data Center Campus |
Querétaro, Mexico (Near Querétaro Airport) |
Projected completion by 2027 |
Announced / Active Development (Master Plan Confirmed) |
900 MW |
|
|
Wonder Valley AI Compute Data Center Park |
Greenview Industrial Gateway, Grande Prairie, Alberta, Canada |
Projected over a 5-10 year timeline |
Planning Stage (Major infrastructure/power studies ongoing) |
5.6 GW (Critical IT Load |
|
|
Quantum Loophole Frederick Data Center Campus |
Frederick County, Maryland, USA |
Phased, expected early 2030s |
Master Planning / Initial Construction (Tenant builds underway) |
Up to 2 GW |
|
|
Microsoft Digital Backbone Canada |
Southern Ontario & Quebec, Canada |
2028 |
Announced / Under Expansion |
Up to 1.2 GW Total Site Potential |
|
|
Alberta AI-Data District (Phase 1) |
Alberta, Canada |
2029 |
Announced / Pre-Construction |
240 MW (Phase 1) |
|
|
River Bend AI Mega-Campus |
River Bend, Louisiana, USA |
2030+ |
Announced / Under Development |
330 MW (Phase 1 Utility) | 2.3 GW (Total) |
|
|
Lighthouse Campus (part of OpenAI/Oracle Stargate) |
Port Washington, Ozaukee County, Wisconsin, USA |
2028 |
Under Construction (Groundbreaking: Dec 17, 2025) |
1.3 GW peak (dedicated high-voltage substation) |
|
|
Project Frontier (Anthropic & Fluidstack) |
Multi-site: Texas (West) & New York (Lake Ontario) |
2028 |
Pre-Execution / Groundbreaking Phase |
500 MW Phase 1; 2.5 GW Total |
|
|
Lighthouse Data Center Campus |
Port Washington, Ozaukee County, Wisconsin |
2028 |
Under Construction (Phase 1) |
1,000 MW Dedicated |
|
|
Google Big Cedar Data Center |
Big Cedar Industrial Center, Iowa |
2029 (Linked to Nuclear Restart) |
Phase 1 Go-Live (Jan 2026) |
200 MVA Dedicated Substation |
|
|
Project Kati 2 (South Texas AI Campus) |
Willacy County, Texas |
2028 |
Under Development / Civil Construction Mobilized |
166 MW Entitlement (scalable to 300 MW+) |
|
|
Project Macroharder (Southaven Supercluster) |
Southaven, DeSoto County, Mississippi |
Late 2026 |
Under Construction / Retrofitting |
~2 GW Entitlement |
|
|
AVAIO Digital Leo - Little Rock Data Hub |
760-acre site in Pulaski County, Arkansas |
2030-2031 |
Pre-Construction / Site Prep |
150 MW (Phase 1) up to 1 GW |
|
|
Vantage Cardiff - CWL13 |
Celtic Way, Newport |
January 2026 |
Commissioned / Operational |
Shared Substation |
|
|
Synapse Alberta One |
alberta |
2030 |
Announced / Planning (Zoning amendment approved) |
1 GW (1,000 MW) |
|
|
Monarch 2GW AI Gigacampus |
West Virginia, USA |
2027 (Initial 2GW completion) |
Under Development / Construction Announced |
2,000 MW (Initial phase) |
|
|
Alphabet 1GW Global AI Infrastructure Expansion Project |
Multi-campus (Global rollout managed from Mountain View, CA, Council Bluffs |
2030 |
Scaling / Under Development |
Up to 1 GW per major regional hub |
|
|
Equinix DA12 Dallas Data Center - 372,517 SQ FT Facility |
Dallas |
March 2028 |
Under Construction (Groundbreaking) |
Est. 40MW+ Critical IT Load |
|
|
Google's 300-Acre Hyperscale Campus |
Chesterfield, 2700 Bermuda Hundred Road, Meadowville Technology Park |
2028 |
Under Construction (Site Grading Complete) |
200 MW Total Utility Feed |
|
|
Vantage 96MW AI Data Center San Antonio Texas |
Omicron Drive, Bexar County, San Antonio |
2028 |
Under Construction (Fit-out Phase) |
96 MW IT Load |
|
|
Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion |
LEAP Research and Innovation District, Lebanon, Indiana |
2030 |
Under Construction / Groundbreaking |
1 GW (1,000 MW) |
|
|
Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) |
Shreveport / Bossier City |
2030 |
Announced / Site Preparation |
1.2 GW Total Site Load |
|
|
Meta Lebanon AI Data Center Campus (1 GW) |
labanon city us |
2030 |
Under Construction (Groundbreaking: Feb 11, 2026) |
1 GW Critical Load |
|
|
Google Pine Island: 1.9GW Clean Energy Hyperscale Campus |
Pine Island (near Rochester, Minnesota) |
2030 |
Announced / Pre-construction |
1,900 MW (Grid-side support) |
|
|
Google Hermantown: 700MW Carbon-Free AI Data Center |
Hermantown (Duluth MSA) |
2027 |
Announced / Permitting (ESA Signed) |
700 MW (Total Site Commitment) |
|
|
Meta Hyperion Louisiana: 5GW AI Hyperscale Campus |
Richland Parish (near Holly Ridge) |
NA |
Under Construction / Scaling |
5 GW (Target Scale) |
|
|
Microsoft Ohio: $1B+ AI Data Centers in Heath & Hebron |
Heath & Hebron (Licking County) |
November 2026 |
Under Construction (Groundbroken Feb 2024) |
~250 MW (Combined initial sites) |
|
|
Stockland-EdgeConneX: 1GW+ National AI Data Center Portfolio |
National, Sydney |
NA |
Finalized Partnership / Development Pipeline |
Scalable to 1 GW+ across national sites |
|
|
CyrusOne Freestone: 760MW AI-Ready Powered Land Texas |
Freestone County (near Fairfield, TX) |
2027 |
Active Development / Construction Prep |
760 MW Total (Two 380MW Phases) |
|
|
Project Ruby Columbus: $5B AI Data Center Campus Georgia |
~987-Acre Site, Upatoi Area, Columbus, GA |
2029 |
Active Negotiations / Pre-Development |
600 MW (200MW ramp-up by 2029; 600MW by 2034) |
|
|
AWS Clinton: $750M AI Data Center Mississippi |
Industrial Park Dr, Clinton, MS |
2028 |
Under Construction (Rehabilitation Phase) |
~150 MW Target (Scaling with Grid Upgrades) |
|
|
AWS Madison County: 1GW $10B AI Data Center Campus MS |
Madison County Mega Site & Ridgeland |
2027 |
Under Construction / Phase 1 Commissioning |
1,000 MW (1 GW) Combined Portfolio |
|
|
AWS Vicksburg: $3B AI Data Center Campus Warren County MS |
Ceres Industrial Park / Vicksburg Area |
2030 |
Under Construction / Site Prep |
~300 MW (Scaling with 754MW Entergy Plant) |
|
|
xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS |
Southaven (DeSoto County) |
2027 |
Operational (Initial Phases) |
~1.2 GW Dedicated Regional Commitment |
|
|
AVAIO Taurus Brandon: $6B AI Data Center Campus 1GW MS |
Brandon (Rankin County) |
2030 (Targeting 1GW+) |
Under Construction (Site Work / Foundation) |
1,036 MW (1.03 GW) Total Baseload Path |
|
|
AVAIO Appomattox: $3B AI Data Center 1GW Virginia |
452-Acre Site, Heartland Innovation Technology Park, Appomattox |
2030+ |
Under Construction (Site Prep / Early Civil) |
300 MW (Grid) / 700 MW (BTM Gas) / 1 GW (Total) |
|
|
Meta Hyperion: $10B Richland Parish AI Data Center Louisiana |
Franklin Farm Property, Richland Parish |
2030 |
Under Construction |
2,000 MW+ (2 GW Total Cluster Goal) |
|
|
Vantage Lighthouse: $15B 1GW Stargate AI Campus WI |
1 mile inland from Lake Michigan, Port Washington |
NA |
Under Construction (Vertical Phase) |
902 MW IT Load (1.3 GW Total Site Capacity) |
|
|
NTT Chicago: $10B Global Expansion CH3 Data Center Itasca |
Arlington Heights Road, Itasca |
2027 |
Under Construction (Completion Scheduled for 2026) |
126 MW Total Planned Campus Load |
|
|
Google Mesa: 400MW |
Mesa (East Valley) |
2027–2028 |
Phase 1 Operational / Phase 2 & 3 Under Review |
400 MW Total Campus Potential |
|
|
Microsoft Cloud North: $7.5B AI Data Center Expansion Quebec |
Quebec City, Donnacona |
2027 |
Under Construction (Superstructure complete at multiple sites) |
Scaling to meet 2027 demand targets |
|
|
Meta Prometheus: 1GW AI Data Center New Albany Ohio |
New Albany, Ohio, USA |
2027 |
Under Construction (Superstructure phase) |
1,000 MW (1 GW) |
|
|
Microsoft Goodyear: 143MW Zero-Water AI Data Center Arizona |
South of MC 85 and Phoenix Goodyear Airport |
2027 |
Phase 1 & 2 Operating / Phase 3-5 Expanding (Zero-Water Pilot) |
143 MW Operational Capacity |
|
|
Tract Buckeye: $20B 1.8GW Mega-Scale AI Data Center Park |
near Palo Verde Nuclear Generating Station, Buckeye |
2040 |
Planning & Infrastructure Phase (Road/Power/Water Layout) |
1,800 MW (1.8 GW) Total Potential |
|
|
Project Baccara: 700MW Gas-Powered AI Data Center Surprise AZ |
Waddell |
2030 |
Approved / Pre-Construction |
700 MW (Self-Generated) |
|
|
Vermaland La Osa: $33B 3GW Mega-Scale Data Center Pinal County |
Vermaland, 3,374-Acre Site along Greene Canal, south of Eloy |
2035 |
Planning / Rezoning Phase (Land Use Amendment Approved Nov 2025) |
3,000 MW (3 GW) |
|
|
Hassayampa Ranch: $25B 1.5GW AI Hub Buckeye Arizona |
Buckeye, near Tonopah Salome Hwy & Jackrabbit Wash |
2035–2040 |
Approved Rezoning / Pre-Construction Planning |
1,500 MW (1.5 GW) |
|
|
EdgeCore Mesa North: 450MW AI-Ready Data Center Mesa AZ |
Elliot Tech CorridoR, Mesa, Arizona |
2028 |
Operating / Expanding (Revised Site Plan submitted March 2026) |
450 MW (Full Build-out) |
|
|
Project Crystal Land: $1T AI & Robotics Manufacturing Hub Arizona |
southern Arizona |
2040 |
Early Planning / Regulatory Pitch Phase (As of March 2026) |
Multi-Gigawatt Scale |
|
|
Project Stargate: $115B 5GW OpenAI Supercomputer Ohio |
1,800-Acre Mega-Site, adjacent to Lordstown |
2032 |
Land Acquisition / Pre-Construction Planning |
5,000 MW (5 GW) |
|
|
Project Jade: 10GW Crusoe AI Data Center Wyoming |
8 miles south of Cheyenne |
2032 |
Approved / Construction Commencement (Q1 2026) |
10,000 MW (10 GW) |
|
|
Nscale Microsoft West Virginia: 1.35GW NVIDIA Rubin AI Factory |
Multi-acre secure campus in West Virginia |
2031 (8 GW Target) |
Groundbreaking / Pre-Construction (Letter of Intent signed March 2026) |
8,000 MW (8 GW) Potential |
|
|
Project Aurora: $13B 15-Facility Microsoft AI Hub Wisconsin |
Wisconn Valley Science & Technology Park, Mount Pleasant |
2032 |
Approved / Phase 1 Operation Start (March 2026) |
Estimated 1.5 GW - 2.0 GW for the 15-building expansion. |
|
|
Compass Meridian: $10B 500MW Hyperscale Campus Mississippi |
Meridian (Lauderdale County), Mississippi |
2033 |
Under Construction (Groundbreaking Jan 2025) |
500 MW |
|
|
Google Virginia: $9B 1GW Project Loch & Project Skye |
Arcola |
2030 |
Under Construction (Phase 1 Framing Q1 2026) |
1,000 MW (1.0 GW) |
|
|
AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana |
New Carlisle indiana |
2030 |
Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) |
2,250 MW (2.25 GW) |
|
|
Google Project Cannoli: $5B 1GW Michigan AI Data Center |
Van Buren Township (Wayne County), Michigan |
December 2028 |
Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026) |
1,000 MW (1.0 GW) |
|
|
Microsoft NC: $2B+ 800MW Data Center Restart & Person County Mega Site |
Hickory, & Roxboro (Person County) |
2032 |
Catawba: Under Construction (Restarted Jan 2026); Person: Permitting |
1,800 MW (1.8 GW) Combined Regional Target |
|
|
Project Tarboro: $19.2B 900MW Energy-Independent AI Hub NC |
tarboro, north carolina |
2031 |
Zoning Approved (Jan 2026); Sale of Land Pending (March 2026) |
900 MW (IT Load) / 1,800 MW (Gross Generation) |
|
|
Google Lenoir Data Center: $1B 2026 AI Expansion North Carolina |
Lenoir (Caldwell County), North Carolina |
2028 |
Announced / Pre-Construction (March 2026) |
~400 MW+ (Regional Estimate) |
|
|
Google Project Mica: $10B 5-Building AI Campus Kansas City |
Kansas City (Clay County), Missouri |
2029 |
Under Construction (Stage Change: Feb 2026) |
500 MW+ (Campus Target) |
|
|
QTS Big Cedar: $10B 7-Building AI Campus Cedar Rapids Iowa |
Cedar Rapids (Linn County), Iowa |
2030 |
Under Construction (Phase 1 Topped Out; Phase 2 Mobilizing) |
616 MW (Phase 1) |
|
|
Google Texas: $40B AI Data Centers Armstrong & Haskell Counties |
Armstrong County & Haskell County, Texas |
2030 |
Under Construction / Active Development (March 2026) |
Multi-GW (Regional Portfolio) |
|
|
Oracle Zettascale Hub: 131,072 GPU AI Supercluster Texas |
Abilene (Taylor/Shackelford Counties), Texas |
2030 |
Active Deployment / Expansion (March 2026) |
1.0 GW (Initial) / 2.0 GW+ (Planned) |
|
|
AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County |
Boardman / Umatilla (Morrow County), Oregon |
2032 (Pending Nuclear Timeline) |
Under Construction (March 2026) |
1.0 GW |
|
|
AWS Project Olympic: $12B AI Data Centers Northwest Louisiana |
Shreveport & Bossier City (Caddo/Bossier Parishes), LA |
March 2026 (Site Prep) |
Pre-Construction / Site Preparation (March 2026) |
Scalable Multi-Site Load |
|
|
Meta Kansas City: $1B AI-Optimized Data Center Missouri |
golden plains technology park ,kansas city |
2028 (Ongoing expansion) |
Operational / Serving Traffic (March 2026) |
~200 MW (Phase 1) |
|
|
Microsoft Granger Indiana: $1B+ AI Data Center St. Joe Farms |
Granger (St. Joseph County), Indiana |
2030 |
Pre-Construction / Groundbreaking Imminent (March 2026) |
~300 MW (Phase 1) |
|
|
Google Project Zodiac Fort Wayne: $2B+ 1.2GW AI Expansion |
Adams Center & Paulding Roads, Fort Wayne |
2030+ (10-year construction horizon) |
Operational / Phase 3 Expansion Under Review (March 2026) |
400 MW (Active) / 1,200 MW (Master Plan) |
|
|
Google Project Peanut Richmond: $3B AI Data Center Chesterfield VA |
Chester, Virginia |
2029 |
Under Construction (March 2026) |
~300 MW (Phase 1) |
|
|
Microsoft Ginger West & East: $1.5B+ Data Centers West Des Moines |
West Des Moines, Iowa |
2030 |
Under Construction (March 2026) |
Campus Total: ~651 MW (Combined Ginger Load) |
|
|
Google Project Big Lake: $7B AI Data Center Palo Iowa |
Palo / Cedar Rapids (Linn County) |
2030 |
Operational (Phase 1) / Expansion Relocated (March 2026) |
615 MW (Nuclear PPA Phase) |
|
|
Meta Beaver Dam: $1B AI Data Center Dodge County Wisconsin |
Beaver Dam (Dodge County), Wisconsin |
2029+ |
Under Construction (March 2026) |
220 MW |
|
|
Project Corn Maze Beloit: $1B+ Stealth Hyperscale Data Center |
Town of Beloit (Rock County), Wisconsin |
2032+ |
Pre-Development / Zoning Review (March 2026) |
~200 MW (Phase 1) |
|
|
AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center |
Salem Township (Luzerne) & Falls Township (Bucks), PA |
2030 |
Permitting / Site Preparation (March 2026) |
1,920 MW (1.92 GW) |
|
|
AWS Project White River: $15B 2.4GW NIPSCO AI Expansion |
Northwest Indiana / NIPSCO Service Territory |
End of 2032 |
Planned / Strategic Mobilization (March 2026) |
2,400 MW (2.4 GW) |
|
|
Google Project Jackalope Wilbarger: $40B Texas AI Data Center |
Vernon (Wilbarger County), Texas |
2030 |
Pre-Construction / Site Preparation (March 2026) |
850 MW |
|
|
Meta El Paso AI 10B Data Center, $10B AI-optimized data center |
El Paso, Texas |
2028 |
Under Construction / Scale-Up Phase (March 2026) |
1,000 MW |
|
|
SoftBank Ohio AI Plant: $500B 10GW Portsmouth Data Center |
Piketon (Pike County), Ohio |
2030 |
Groundbreaking / Site Redevelopment (March 2026) |
10,000 MW (10 GW) |
|
|
Google Project Blackwood Missouri: $2.5B 400MW AI Data Center |
Kansas City (Clay County), Missouri |
2029 |
Under Construction / Phase 1 Fit-out (March 2026) |
400 MW (Target IT Load) |
|
|
Nebius Independence Missouri: $6.6B 1.2GW AI Factory |
Independence (Jackson County), Missouri |
2029+ |
Approved / Site Construction (March 2026) |
1,200 MW (1.2 GW) |
|
|
AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster |
Madison County (Canton/Ridgeland) & Vicksburg |
March 2026 (Operational) |
Under Construction / Initial Power-Up (March 2026) |
1,000 MW (Total Campus Goal) |
|
|
Prometheus Hyperscale Wyoming: $30B 2.5GW Bernard Looney AI Hub |
Evanston & Casper, Wyoming |
2029 |
Operational / Rapid Expansion (April 2026) |
2,500 MW (2.5 GW Total) |
|
|
Penzance Bedington West Virginia: $4B 600MW AI Hub |
Bedington (Berkeley County), West Virginia |
2029 |
Approved / Site Preparation (March 2026) |
600 MW |
|
|
Joliet Technology Center: $20B 1.2GW Illinois AI Hub |
Former Industrial Brownfield, South Joliet |
2030 |
Approved / Pre-Construction (March 19, 2026) |
1,200 MW (1.2 GW) |
|
|
Amazon Loudoun County Data Center: $2B GW VSTC Campus |
Ashburn (Loudoun County), Virginia |
2030 |
Acquisition Closed / Site Master Planning (March 2026) |
~770 MW |
|
|
Terafab Austin: $25B 2nm AI Chip Factory |
Austin (Travis County), Texas |
2028-2030 (1M Wafer Starts/Month Goal) |
Under Construction / Soil Reclamation (April 2026) |
~200 MW (Terrestrial Fab Operations) |
|
|
Microsoft Georgia Data Center: $1B+ East US 3 AI Region |
Atlanta, (Douglasville, Palmetto, Union City, East Point) |
2027 (Full AZ integration) |
Under Construction / Commissioning Phase (April 2026) |
~324 MW (Planned for Steamboat phase) |
|
|
Microsoft Project Jupiter New Mexico: $165B Stargate AI Hub |
Santa Teresa, new maxico |
2029 |
Under Construction / Phase 1 Envelope (April 2026) |
Scalable Gigawatt-class roadmap (Final capacity undisclosed). |
|
|
Stargate Wisconsin Lighthouse: 1GW OpenAI-Oracle AI Hub |
Port Washington (Ozaukee County), Wisconsin |
2028 |
Active Construction / Pre-Operational (April 2026) |
1,000 MW (1.0 GW) |
|
|
Cheyenne Wyoming AI Campus: 1.8GW Project Jade Stargate |
south of Cheyenne, |
2029 (Phase 1) |
Under Construction / Site Preparation (April 2026) |
1,800 MW (Initial) / 10,000 MW (Target) |
|
|
Crusoe Abilene: 900MW Microsoft AI Supercluster |
West Texas |
NA |
Utility Engineering / Power Plant Deal (April 2026) |
900 MW |
|
|
Aligned Data Centers Project Caprock - 540MW Sustainable AI |
near Abernathy, TX (Permian Basin area) |
2030 (Estimated completion) |
Under Construction / Groundbreaking |
540 MW (Cumulative campus capacity) |
|
|
Alpha Digital Campus: 2GW Giga-Scale AI Hub in Texas |
3,400-acre site in Reeves County, Texas |
2032 |
Planning / Site Acquisition (April 2026) |
2,000 MW (2 GW) |
|
|
Digital Realty ORD14 Chicago: 20MW Franklin Park Interconnect Hub |
Franklin Park, IL 60131 |
Operational |
Operational (April 2026) |
20.0 MW (Utility) |
|
|
TCDC Ector County: 1GW Giga-Scale AI & HPC Campus |
438-Acre master-planned site outside Odessa, TX |
2030+ |
Phase 2 Engineering / Financing (April 2026) |
1,000 MW (1 GW) |
|
|
Oracle Michigan: $16B "Power-First" 1.2GW AI Hub |
industrial site, Michigan, USA |
2028 |
Financing Finalized / Deployment Underway (April 2026) |
1,200 MW (1.2 GW) |
|
|
Bell AI Fabric: 300 MW Sovereign AI Campus in Sherwood |
near Regina, Saskatchewan |
2029 |
Under Construction (Announced April 2026) |
300 MW |
|
|
Microsoft Cheyenne Bison Campus: 400 MW Hyperscale Expansion |
Southeast Cheyenne (Bison Business Park) |
2035+ |
Announced / Pre-Development (April 14, 2026) |
400 MW (Phase 1 & 2) |
|