North America

North America – Data Center Regional Overview

North America remains the largest and most established data center market globally, supported by strong demand from hyperscalers, cloud service providers, enterprises, and government organizations. The region plays a central role in global cloud infrastructure, digital services, and interconnection ecosystems.

High cloud penetration, early adoption of AI and machine learning workloads, and the continued shift toward hybrid and multi-cloud environments are key growth drivers. The region also benefits from abundant power availability, advanced network infrastructure, and a well-developed colocation and hyperscale ecosystem.

Data center development in North America spans major metropolitan hubs as well as rapidly growing secondary markets that offer scalable land availability, favorable power economics, and business-friendly regulatory environments. Sustainability initiatives, including renewable energy procurement and efficiency optimization, are increasingly influencing investment decisions.

Overall, North America continues to attract large-scale investments, reinforcing its position as a cornerstone of global digital infrastructure while evolving to support next-generation compute and data-intensive applications.

Data Center Projects Locations on Map



Apply Filter:

Project Name Location Full Builtout Project Status Power Capacity Action
Stargate AI Infrastructure Platform | OpenAI, Oracle & SoftBank Compute Ecosystem Multiple U.S. states, including Texas (Abilene, Shackelford, Milam), New Mexico, Ohio (Lordstown), and Wisconsin (Midwest site) Expected by 2030 (Full 10 GW capacity) Confirmed / Under Rapid Construction 10 GW (Target by 2030)
Vantage Frontier Data Center Campus | Hyperscale AI & Cloud Infrastructure Hub Shackelford County, Texas, USA Expected completion and full operational status by 2028. Construction Underway (Announced August 2025) 1.4 GW (Total IT Load)
OCI Chicago Region | Secure AI, Database & Cloud Computing Platform Greater Chicago Area, Illinois, USA 2025. Operational Not publicly disclosed
Microsoft Fairwater AI Superfactory | Hyperscale AI & Cloud Infrastructure Hub in Wisconsin Mount Pleasant, Wisconsin, USA End of 2028 Under Construction / Initial phases operational (announced September 2025 with $4 billion expansion) hundreds of MW
DA11 Equinix IBX International Business Exchange Data Center 1990 North Stemmons Freeway, Dallas, TX 75207, USA Complete (Total colocation space $\approx 144,000 \text{ sq ft}$ with $\approx 3,850$ cabinets) Operational with phased expansion complete (Fully Built Out) $8 \times 3,000 \text{ kW}$ diesel generators
QTS Manassas Data Center Campus Manassas, Prince William County, Northern Virginia, USA Expected to be completed over the next 5+ years. Under Construction / Phased Deployment 190+ MW of critical campus capacity
Google Cloud / NextEra GW-Scale AI Data Center Campus Multiple GW-scale hubs across the United States (Locations undisclosed, 3 sites already under development) 2028-2030 Major Strategic Partnership Announced (Today) / Under Development 1,000 MW (1 GW per campus target)
Wonder Valley AI Compute Data Center Park | Hyperscale AI & Cloud Infrastructure Hub Greenview Industrial Gateway, Grande Prairie, Alberta, Canada Projected over a 5-10 year timeline Planning Stage (Major infrastructure/power studies ongoing) 5.6 GW (Critical IT Load
Quantum Loophole Frederick Campus | Next-Generation Data Center & Digital Infrastructure Platform Frederick County, Maryland, USA Phased, expected early 2030s Master Planning / Initial Construction (Tenant builds underway) Up to 2 GW
Microsoft Digital Backbone Canada | Secure Hyperscale Infrastructure for Azure Services Southern Ontario & Quebec, Canada 2028 Announced / Under Expansion Up to 1.2 GW Total Site Potential
Alberta AI-Data District Infrastructure Phase 1 Alberta, Canada 2029 Announced / Pre-Construction 240 MW (Phase 1)
River Bend AI Mega-Campus | High-Density AI Training & Cloud Facility River Bend, Louisiana, USA 2030+ Announced / Under Development 330 MW (Phase 1 Utility) | 2.3 GW (Total)
Lighthouse Data Center Campus | Next-Gen Stargate AI & Cloud Platform Port Washington, Ozaukee County, Wisconsin, USA 2028 Under Construction (Groundbreaking: Dec 17, 2025) 1.3 GW peak (dedicated high-voltage substation)
Anthropic & Fluidstack Project Frontier Multi-site: Texas (West) & New York (Lake Ontario) 2028 Pre-Execution / Groundbreaking Phase 500 MW Phase 1; 2.5 GW Total
Lighthouse Data Center Campus | Next-Gen Colocation & Digital Infrastructure Facility Port Washington, Ozaukee County, Wisconsin 2028 Under Construction (Phase 1) 1,000 MW Dedicated
Google Big Cedar | Next-Gen Hyperscale Data Center Facility Big Cedar Industrial Center, Iowa 2029 (Linked to Nuclear Restart) Phase 1 Go-Live (Jan 2026) 200 MVA Dedicated Substation
Project Kati 2 | High-Performance AI Compute & Cloud Infrastructure Platform Willacy County, Texas 2028 Under Development / Civil Construction Mobilized 166 MW Entitlement (scalable to 300 MW+)
Project Macroharder Southaven | Next-Generation AI Supercluster & Cloud Infrastructure Campus Southaven, DeSoto County, Mississippi Late 2026 Under Construction / Retrofitting ~2 GW Entitlement
AVAIO Digital Leo Next-Generation Data Hub 760-acre site in Pulaski County, Arkansas 2030-2031 Pre-Construction / Site Prep 150 MW (Phase 1) up to 1 GW
Vantage Cardiff CWL13 | Hyperscale AI & Cloud Data Center Campus Celtic Way, Newport January 2026 Commissioned / Operational Shared Substation
Synapse Alberta One | Next-Generation Data Center & Digital Infrastructure Platform alberta 2030 Announced / Planning (Zoning amendment approved) 1 GW (1,000 MW)
Monarch 2GW AI Gigacampus West Virginia, USA 2027 (Initial 2GW completion) Under Development / Construction Announced 2,000 MW (Initial phase)
Alphabet 1GW Global AI Infrastructure Expansion Project Multi-campus (Global rollout managed from Mountain View, CA, Council Bluffs 2030 Scaling / Under Development Up to 1 GW per major regional hub
Equinix DA12 Dallas Data Center - 372,517 SQ FT Facility Dallas March 2028 Under Construction (Groundbreaking) Est. 40MW+ Critical IT Load
Google's 300-Acre Hyperscale Campus Chesterfield, 2700 Bermuda Hundred Road, Meadowville Technology Park 2028 Under Construction (Site Grading Complete) 200 MW Total Utility Feed
Vantage 96MW AI Data Center San Antonio Texas Omicron Drive, Bexar County, San Antonio 2028 Under Construction (Fit-out Phase) 96 MW IT Load
Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion LEAP Research and Innovation District, Lebanon, Indiana 2030 Under Construction / Groundbreaking 1 GW (1,000 MW)
Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) Shreveport / Bossier City 2030 Announced / Site Preparation 1.2 GW Total Site Load
Meta Lebanon AI Data Center Campus (1 GW) labanon city us 2030 Under Construction (Groundbreaking: Feb 11, 2026) 1 GW Critical Load
Google Pine Island: 1.9GW Clean Energy Hyperscale Campus Pine Island (near Rochester, Minnesota) 2030 Announced / Pre-construction 1,900 MW (Grid-side support)
Google Hermantown: 700MW Carbon-Free AI Data Center Hermantown (Duluth MSA) 2027 Announced / Permitting (ESA Signed) 700 MW (Total Site Commitment)
Meta Hyperion Louisiana: 5GW AI Hyperscale Campus Richland Parish (near Holly Ridge) NA Under Construction / Scaling 5 GW (Target Scale)
Microsoft Ohio: $1B+ AI Data Centers in Heath & Hebron Heath & Hebron (Licking County) November 2026 Under Construction (Groundbroken Feb 2024) ~250 MW (Combined initial sites)
Stockland-EdgeConneX: 1GW+ National AI Data Center Portfolio National, Sydney NA Finalized Partnership / Development Pipeline Scalable to 1 GW+ across national sites
CyrusOne Freestone: 760MW AI-Ready Powered Land Texas Freestone County (near Fairfield, TX) 2027 Active Development / Construction Prep 760 MW Total (Two 380MW Phases)
Project Ruby Columbus: $5B AI Data Center Campus Georgia ~987-Acre Site, Upatoi Area, Columbus, GA 2029 Active Negotiations / Pre-Development 600 MW (200MW ramp-up by 2029; 600MW by 2034)
AWS Clinton: $750M AI Data Center Mississippi Industrial Park Dr, Clinton, MS 2028 Under Construction (Rehabilitation Phase) ~150 MW Target (Scaling with Grid Upgrades)
AWS Madison County: 1GW $10B AI Data Center Campus MS Madison County Mega Site & Ridgeland 2027 Under Construction / Phase 1 Commissioning 1,000 MW (1 GW) Combined Portfolio
AWS Vicksburg: $3B AI Data Center Campus Warren County MS Ceres Industrial Park / Vicksburg Area 2030 Under Construction / Site Prep ~300 MW (Scaling with 754MW Entergy Plant)
xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS Southaven (DeSoto County) 2027 Operational (Initial Phases) ~1.2 GW Dedicated Regional Commitment
AVAIO Taurus Brandon: $6B AI Data Center Campus 1GW MS Brandon (Rankin County) 2030 (Targeting 1GW+) Under Construction (Site Work / Foundation) 1,036 MW (1.03 GW) Total Baseload Path
AVAIO Appomattox: $3B AI Data Center 1GW Virginia 452-Acre Site, Heartland Innovation Technology Park, Appomattox 2030+ Under Construction (Site Prep / Early Civil) 300 MW (Grid) / 700 MW (BTM Gas) / 1 GW (Total)
Meta Hyperion: $10B Richland Parish AI Data Center Louisiana Franklin Farm Property, Richland Parish 2030 Under Construction 2,000 MW+ (2 GW Total Cluster Goal)
Vantage Lighthouse: $15B 1GW Stargate AI Campus WI 1 mile inland from Lake Michigan, Port Washington NA Under Construction (Vertical Phase) 902 MW IT Load (1.3 GW Total Site Capacity)
NTT Chicago: $10B Global Expansion CH3 Data Center Itasca Arlington Heights Road, Itasca 2027 Under Construction (Completion Scheduled for 2026) 126 MW Total Planned Campus Load
Google Mesa: 400MW Mesa (East Valley) 2027–2028 Phase 1 Operational / Phase 2 & 3 Under Review 400 MW Total Campus Potential
Microsoft Cloud North: $7.5B AI Data Center Expansion Quebec Quebec City, Donnacona 2027 Under Construction (Superstructure complete at multiple sites) Scaling to meet 2027 demand targets
Meta Prometheus: 1GW AI Data Center New Albany Ohio New Albany, Ohio, USA 2027 Under Construction (Superstructure phase) 1,000 MW (1 GW)
Microsoft Goodyear: 143MW Zero-Water AI Data Center Arizona South of MC 85 and Phoenix Goodyear Airport 2027 Phase 1 & 2 Operating / Phase 3-5 Expanding (Zero-Water Pilot) 143 MW Operational Capacity
Tract Buckeye Data Center Park | 1.8GW Hyperscale AI & Cloud Infrastructure Campus near Palo Verde Nuclear Generating Station, Buckeye 2040 Planning & Infrastructure Phase (Road/Power/Water Layout) 1,800 MW (1.8 GW) Total Potential
Project Baccara: 700MW Gas-Powered AI Data Center Surprise AZ Waddell 2030 Approved / Pre-Construction 700 MW (Self-Generated)
La Osa Data Center Project | $33B Mega-Scale Compute & Digital Infrastructure Campus Vermaland, 3,374-Acre Site along Greene Canal, south of Eloy 2035 Planning / Rezoning Phase (Land Use Amendment Approved Nov 2025) 3,000 MW (3 GW)
Hassayampa Ranch Buckeye Data Center | Hyperscale AI Infrastructure Campus (1.5GW) Buckeye, near Tonopah Salome Hwy & Jackrabbit Wash 2035–2040 Approved Rezoning / Pre-Construction Planning 1,500 MW (1.5 GW)
Mesa North 450MW AI Data Center EdgeCore Mesa AZ Elliot Tech CorridoR, Mesa, Arizona 2028 Operating / Expanding (Revised Site Plan submitted March 2026) 450 MW (Full Build-out)
Project Crystal Land: $1T AI & Robotics Manufacturing Hub Arizona southern Arizona 2040 Early Planning / Regulatory Pitch Phase (As of March 2026) Multi-Gigawatt Scale
Project Stargate | 5GW OpenAI AI Supercomputer & Hyperscale Infrastructure Hub 1,800-Acre Mega-Site, adjacent to Lordstown 2032 Land Acquisition / Pre-Construction Planning 5,000 MW (5 GW)
Project Jade: 10GW Crusoe AI Data Center Wyoming 8 miles south of Cheyenne 2032 Approved / Construction Commencement (Q1 2026) 10,000 MW (10 GW)
West Virginia AI Data Center | Nscale & Microsoft 1.35GW GPU Infrastructure Hub Multi-acre secure campus in West Virginia 2031 (8 GW Target) Groundbreaking / Pre-Construction (Letter of Intent signed March 2026) 8,000 MW (8 GW) Potential
Project Aurora: $13B 15-Facility Microsoft AI Hub Wisconsin Wisconn Valley Science & Technology Park, Mount Pleasant 2032 Approved / Phase 1 Operation Start (March 2026) Estimated 1.5 GW - 2.0 GW for the 15-building expansion.
Compass Meridian: $10B 500MW Hyperscale Campus Mississippi Meridian (Lauderdale County), Mississippi 2033 Under Construction (Groundbreaking Jan 2025) 500 MW
Google Virginia: $9B 1GW Project Loch & Project Skye Arcola 2030 Under Construction (Phase 1 Framing Q1 2026) 1,000 MW (1.0 GW)
AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana New Carlisle indiana 2030 Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) 2,250 MW (2.25 GW)
Google Project Cannoli: $5B 1GW Michigan AI Data Center Van Buren Township (Wayne County), Michigan December 2028 Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026) 1,000 MW (1.0 GW)
Microsoft NC: $2B+ 800MW Data Center Restart & Person County Mega Site Hickory, & Roxboro (Person County) 2032 Catawba: Under Construction (Restarted Jan 2026); Person: Permitting 1,800 MW (1.8 GW) Combined Regional Target
Project Tarboro: $19.2B 900MW Energy-Independent AI Hub NC tarboro, north carolina 2031 Zoning Approved (Jan 2026); Sale of Land Pending (March 2026) 900 MW (IT Load) / 1,800 MW (Gross Generation)
Google Lenoir Data Center: $1B 2026 AI Expansion North Carolina Lenoir (Caldwell County), North Carolina 2028 Announced / Pre-Construction (March 2026) ~400 MW+ (Regional Estimate)
Google Project Mica: $10B 5-Building AI Campus Kansas City Kansas City (Clay County), Missouri 2029 Under Construction (Stage Change: Feb 2026) 500 MW+ (Campus Target)
QTS Big Cedar: $10B 7-Building AI Campus Cedar Rapids Iowa Cedar Rapids (Linn County), Iowa 2030 Under Construction (Phase 1 Topped Out; Phase 2 Mobilizing) 616 MW (Phase 1)
Google Texas: $40B AI Data Centers Armstrong & Haskell Counties Armstrong County & Haskell County, Texas 2030 Under Construction / Active Development (March 2026) Multi-GW (Regional Portfolio)
Oracle Zettascale Hub: 131,072 GPU AI Supercluster Texas Abilene (Taylor/Shackelford Counties), Texas 2030 Active Deployment / Expansion (March 2026) 1.0 GW (Initial) / 2.0 GW+ (Planned)
AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County Boardman / Umatilla (Morrow County), Oregon 2032 (Pending Nuclear Timeline) Under Construction (March 2026) 1.0 GW
AWS Project Olympic: $12B AI Data Centers Northwest Louisiana Shreveport & Bossier City (Caddo/Bossier Parishes), LA March 2026 (Site Prep) Pre-Construction / Site Preparation (March 2026) Scalable Multi-Site Load
Meta Kansas City: $1B AI-Optimized Data Center Missouri golden plains technology park ,kansas city 2028 (Ongoing expansion) Operational / Serving Traffic (March 2026) ~200 MW (Phase 1)
Microsoft Granger Indiana: $1B+ AI Data Center St. Joe Farms Granger (St. Joseph County), Indiana 2030 Pre-Construction / Groundbreaking Imminent (March 2026) ~300 MW (Phase 1)
Google Project Zodiac Fort Wayne: $2B+ 1.2GW AI Expansion Adams Center & Paulding Roads, Fort Wayne 2030+ (10-year construction horizon) Operational / Phase 3 Expansion Under Review (March 2026) 400 MW (Active) / 1,200 MW (Master Plan)
Google Project Peanut Richmond: $3B AI Data Center Chesterfield VA Chester, Virginia 2029 Under Construction (March 2026) ~300 MW (Phase 1)
Microsoft Ginger West & East: $1.5B+ Data Centers West Des Moines West Des Moines, Iowa 2030 Under Construction (March 2026) Campus Total: ~651 MW (Combined Ginger Load)
Google Project Big Lake: $7B AI Data Center Palo Iowa Palo / Cedar Rapids (Linn County) 2030 Operational (Phase 1) / Expansion Relocated (March 2026) 615 MW (Nuclear PPA Phase)
Meta Beaver Dam: $1B AI Data Center Dodge County Wisconsin Beaver Dam (Dodge County), Wisconsin 2029+ Under Construction (March 2026) 220 MW
Project Corn Maze Beloit: $1B+ Stealth Hyperscale Data Center Town of Beloit (Rock County), Wisconsin 2032+ Pre-Development / Zoning Review (March 2026) ~200 MW (Phase 1)
AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center Salem Township (Luzerne) & Falls Township (Bucks), PA 2030 Permitting / Site Preparation (March 2026) 1,920 MW (1.92 GW)
AWS Project White River: $15B 2.4GW NIPSCO AI Expansion Northwest Indiana / NIPSCO Service Territory End of 2032 Planned / Strategic Mobilization (March 2026) 2,400 MW (2.4 GW)
Google Project Jackalope Wilbarger: $40B Texas AI Data Center Vernon (Wilbarger County), Texas 2030 Pre-Construction / Site Preparation (March 2026) 850 MW
Meta El Paso AI 10B Data Center, $10B AI-optimized data center El Paso, Texas 2028 Under Construction / Scale-Up Phase (March 2026) 1,000 MW
SoftBank Portsmouth Ohio | 10GW AI Data Center & Compute Infrastructure Campus Piketon (Pike County), Ohio 2030 Groundbreaking / Site Redevelopment (March 2026) 10,000 MW (10 GW)
Project Blackwood Missouri Data Center | $2.5B AI-Ready Hyperscale Campus (400MW) Kansas City (Clay County), Missouri 2029 Under Construction / Phase 1 Fit-out (March 2026) 400 MW (Target IT Load)
Independence Missouri AI Factory | Nebius $6.6B High-Density Compute Hub Independence (Jackson County), Missouri 2029+ Approved / Site Construction (March 2026) 1,200 MW (1.2 GW)
Project Starbound AI Cluster in Mississippi Madison County (Canton/Ridgeland) & Vicksburg March 2026 (Operational) Under Construction / Initial Power-Up (March 2026) 1,000 MW (Total Campus Goal)
Prometheus Hyperscale Wyoming | Bernard Looney AI & Cloud Infrastructure Project Evanston & Casper, Wyoming 2029 Operational / Rapid Expansion (April 2026) 2,500 MW (2.5 GW Total)
Penzance Bedington West Virginia AI Data Hub Bedington (Berkeley County), West Virginia 2029 Approved / Site Preparation (March 2026) 600 MW
Joliet Technology Center | 1.2GW AI-Ready Hyperscale Infrastructure Project Former Industrial Brownfield, South Joliet 2030 Approved / Pre-Construction (March 19, 2026) 1,200 MW (1.2 GW)
Amazon GW VSTC Campus | $2 Billion Loudoun County Data Center Ashburn (Loudoun County), Virginia 2030 Acquisition Closed / Site Master Planning (March 2026) ~770 MW
Terafab Austin Semiconductor Campus | $25B Advanced 2nm AI Chip Manufacturing Hub Austin (Travis County), Texas 2028-2030 (1M Wafer Starts/Month Goal) Under Construction / Soil Reclamation (April 2026) ~200 MW (Terrestrial Fab Operations)
Microsoft East US 3 Georgia Region | $1B+ AI-Ready Cloud & Data Center Platform Atlanta, (Douglasville, Palmetto, Union City, East Point) 2027 (Full AZ integration) Under Construction / Commissioning Phase (April 2026) ~324 MW (Planned for Steamboat phase)
Microsoft Project Jupiter | $165B AI Data Center & Compute Hub in New Mexico Santa Teresa, new maxico 2029 Under Construction / Phase 1 Envelope (April 2026) Scalable Gigawatt-class roadmap (Final capacity undisclosed).
Stargate Wisconsin Lighthouse Campus | 1GW Hyperscale AI Infrastructure & Compute Hub Port Washington (Ozaukee County), Wisconsin 2028 Active Construction / Pre-Operational (April 2026) 1,000 MW (1.0 GW)
Cheyenne AI Campus Wyoming 1.8GW Project Jade Stargate south of Cheyenne, 2029 (Phase 1) Under Construction / Site Preparation (April 2026) 1,800 MW (Initial) / 10,000 MW (Target)
Abilene 900MW Microsoft AI Supercluster by Crusoe West Texas NA Utility Engineering / Power Plant Deal (April 2026) 900 MW
Aligned Data Centers Project Caprock - 540MW Sustainable AI near Abernathy, TX (Permian Basin area) 2030 (Estimated completion) Under Construction / Groundbreaking 540 MW (Cumulative campus capacity)
Alpha Digital Campus: 2GW AI Hub in Texas 3,400-acre site in Reeves County, Texas 2032 Planning / Site Acquisition (April 2026) 2,000 MW (2 GW)
ORD14 Chicago 20MW Franklin Park Interconnect Hub Digital Realty Franklin Park, IL 60131 Operational Operational (April 2026) 20.0 MW (Utility)
TCDC Ector County Data Center | 1GW Hyperscale AI & High-Performance Computing Hub 438-Acre master-planned site outside Odessa, TX 2030+ Phase 2 Engineering / Financing (April 2026) 1,000 MW (1 GW)
Oracle Michigan: $16B "Power-First" 1.2GW AI Hub industrial site, Michigan, USA 2028 Financing Finalized / Deployment Underway (April 2026) 1,200 MW (1.2 GW)
Bell AI Fabric: 300 MW Sovereign AI Campus in Sherwood near Regina, Saskatchewan 2029 Under Construction (Announced April 2026) 300 MW
Microsoft Cheyenne Bison Campus: 400 MW Hyperscale Expansion Southeast Cheyenne (Bison Business Park) 2035+ Announced / Pre-Development (April 14, 2026) 400 MW (Phase 1 & 2)
Blackstone Digital Realty $7 Billion Data Center Portfolio Northern Virginia 2028 Active Construction / Phase Rollouts (April 2026) 500.0 MW (Aggregated)
SoftBank Piketon Data Center | 10GW Hyperscale AI & Cloud Infrastructure Campus Former Portsmouth Gaseous Diffusion Plant (DOE Land) 2035+ Approved / Groundbreaking (April 2026) 10.0 GW
AWS Project Basalt Walla Walla 5GW AI Cluster Multi-site campus across Wallula Gap and Walla Walla County AWS Walla Walla Phased Construction / Giga-Scale Power Integration (April 2026) 5,000.0 MW (5.0 GW)
Vantage QC21 Data Center | 86MW Hyperscale AI & Renewable Energy Infrastructure Hub 30-acre campus in Quebec City 2027 Operational / Active Expansion (April 2026) 86.0 MW (Full Campus Build-out)
Vantage New Albany OH1 Mega-Campus New Albany International Business Park Q2 2028 Under Construction (Phase 2 Expansion) 160 MW IT Load across 5 buildings
Oracle Project Jupiter 2.45GW BorderPlex Industrial Park, New Mexico 2032 Groundbreaking / Pre-Construction 2.45 GW Total Power On-Site
Cologix VAN3 Vancouver 2828 Natal Street, Vancouver April 2026 (Modernization Completed) Operational (Recent AI-Expansion Phase) 5 MW IT Load
Cologix VAN2 Vancouver 1050 West Pender Street Completed Q4 2024 Operational 2 MW Total IT Load
Cologix VAN1 Vancouver 555 West Hastings Street, Vancouver Mature Site (Continuous Upgrades) Operational (Recent Network Expansion) 1.5 MW IT Load
Cologix VAN5 Vancouver 555 West Hastings Street, Vancouver April 2026 Operational 1.6 MW IT Load
Equinix TR7: 16.6 MVA Brampton Hyperscale Hub & Toronto IBX 1895 Williams Parkway East, Brampton Continuous incremental expansion through 2026 Operational / Continuous Expansion (May 2026) 16.6 MVA (Total)
Oracle Indiana AI Campus | $12B Hyperscale 1GW Data Center & Compute Hub Indiana Enterprise Center Projected Completion: 2028 Active Construction / Phase 1 Fit-out (May 2026) 1,000.0 MW (1.0 GW)
Polaris Forge 1 Data Center | $300B Hyperscale AI Infrastructure Hub in Ellendale Polaris Forge 1 Campus, Ellendale, ND 2027 Active Construction / Phase 3 Funding Secured (May 2026) 180.0 MW+
Hut 8 Beacon Point Data Center | 352MW Hyperscale AI Infrastructure Lease ($9.8B) Coastal Texas (Nueces County) 2027 Commercialized / Phase 1 Construction (May 6, 2026) 352.0 MW (Immediate Phase)
Red Oak $2B DataBank Expansion for Oracle AI Cluster Red Oak, texas Projected by 2028–2029 as the 292-acre campus scales to its full 180MW+ AI capacity footprint Under Construction / Financing Closed (May 2026) 180.0 MW (Phase 1)
Amazon’s Project Star: Massive $11B Hyperscale AI Hub in Indiana New Carlisle, Indiana Late 2026 Under Construction / Rapid Structural Build (May 2026) 1,000.0 MW (1.0 GW)
Stratos AI Utah: 9GW Giga-Scale Artificial Intelligence Campus Box Elder County, Utah NA Approved / Pre-Construction 9,000 MW (9 GW) Full Buildout
TRON USA Pennsylvania: 200MW AI-Ready Hyperscale Campus Decommissioned Coal Facility, Pennsylvania 2029 (Projected) Strategic Agreement Signed / Pre-Construction 200 MW IT Load
CyrusOne DFW10: $1.2B Co-Located Hyperscale Campus 557 County Rd 3610, Whitney, TX 76692 2027–2028 (Phased 5-Building Rollout) Under Construction (Topping Out Milestone: March 2026) 400 MW Maximum Dedicated Delivery (190MW Initial Phase PPA)
Saline Supercomputing Megasite: $16B OpenAI Frontier Campus Saline 2029 Under Construction / Active Site Preparation (Documented May 2026) 1,200 MW Maximum Dedicated Footprint
Vantage MKE1: $8B Port Washington Hyperscale Campus Port Washington, WI 2032+ (Phased Multi-Facility Deployment Plan) Pre-Construction / Site Planning (Tax Incentives Disclosed May 2026) 1,300 MW Maximum Dedicated Footprint
Boxminer La Pine: 20MW High-Density Digital Asset Mining Campus La Pine Late 2026 (Subject to Approval) Proposed / Pending Municipal Approval (Reviewed May 19, 2026) 20 MW Baseline Critical IT Infrastructure Demand
Polaris Forge 2: $3B Harwood AI Factory Mega-Campus 900+ Acre Contiguous Master-Planned Site, Harwood, ND 58042 Early 2027 Under Construction / Active Infrastructure Installation (Status: May 2026) 280 MW Initial Utility Substation Block; Scalable to 1,000 MW
Google New Florence Campus: $15B Eco-Efficient Hyperscale Hub New Florence 2028 Approved / Active Site Planning (Announced May 20, 2026) 800 MW+ Ultimate Master-Planned Substation Power Footprint
AWS Reno: Geothermal & Solar Powered Next-Gen Infrastructure Reno, Newada Mid-2028 Approved / Siting & Energy Development Phase (Announced May 19, 2026) 700 MW Total Contracted Clean Power Portfolio Framework
Polaris Forge 3 430MW High Density AI Factory Data Center NorthaDakota Estimated 2029 Under Construction 430 MW gross capacity
EdgeCore Dulles Hyperscale Project Virginia Funding $1.5B Dulles Technology Corridor, Sterling Comprehensive execution and twin-facility occupancy scheduled by late 2028 Active Construction Underway 160 MW gross footprint capacity delivered via specialized heavy utility interconnections
kevin o'leary Digital Stratos Hyperscale Data Center Box Elder County, Utah, United States Long-term multi-phase deployment extending incrementally through 2035 Active Master Planning / Architectural Phase 7.5 Gigawatts (GW) gross campus-wide electrical capacity allocation
Enbridge Cowboy Project Wyoming Powering Meta Data Centers $1.2B Cheyenne, US Comprehensive system synchronization and full commercial operation targeted by late 2027 Approved / Contracted Framework Phase 365 MW solar generation paired with a 200 MW / 1,600 MWh battery energy storage matrix
Related Digital Saline Township Campus Saline Township, Washtenaw County, Michigan, United States Continuous phased scaling scheduled through 2029–2030 Financing Secured / Early Phase 1 Civil Engineering Up to 1.6 GW gross capacity (1,383 MW estimated net facility draw at full buildout)
Vantage Ashburn VA3 | Next-Generation 96MW Cloud & Digital Infrastructure Platform Ashburn, Virginia 20147 Scheduled for completion by Q1 2027 Operational / Phase 3 Expansion Underway 96 MW of critical IT load (Supported by a dedicated 150MVA on-site substation)
TeraWulf Muskie Data Campus 1GW Eastern Kentucky Center Northeastern Kentucky Scheduled for H2 2030 (Additional 500 MW expansion to cross the 1 GW threshold) Announced / Pre-construction Phase (Acquired May 2026) Scalable to 1,000+ MW (1 GW+) total grid allocation
AWS New Florence 1.2GW Data Center New Florence, Missouri 63363 Long-term phased expansion covering 21 planned buildings across Phase 1 (8 buildings) and Phase 2 (13 buildings) running through 2052 Under Construction (Equipment mobilized and grading active as of Spring 2026) Up to 1.2 GW capacity supported by major utility-grade on-site switching stations
Louisville Data Center Campus | PowerHouse 400MW Enterprise Colocation Facility Louisville Sequential development scaling continuously across all planned phases through 2029 Under Construction / Active Site Civil Works (Moving forward as of May 2026) 400 MW gross monthly capacity allocation via a dedicated high-voltage substation switchyard
Sentinum Michigan Data Center | 300MW AI & Cloud Compute Campus Michigan, us Phased sequential long-term scaling concept potential stretching up to 300 MW over several years Under Construction / Active Equipment Deployment Phase (Procurement confirmed May 2026) Up to 300 MW ultimate master-planned capacity, initialized by a dedicated 30 MW first-phase substation footprint
Amazon AWS - Calvert County Campus Calvert Cliffs Nuclear Power Plant, Lusby, MD Long-term sequential multi-facility site scaling continuously through 2034 Active / Under Evaluation & Site Feasibility Review (Confirmed May 2026) 1,500 MW gross generation capacity delivered via direct high-voltage substation switchyards
LinkBermuda Teleport | Secure Tier 3 5MW Strategic Edge Compute Facility 1 Middle Rd, Devonshire, FL 01, Bermuda Core expansion and subsea landing systems fully active; continuous hardware modernization tracked through May 2026 Active / Operational 5 MW gross capacity supporting diverse high-density power loops up to 12 kW per rack
New Providence Offshore Node by Cable Bahamas Intersection of Old Trail & Robinson Dr., 00000 Nassau, New Providence, Bahamas Core subsea transport and fiber distribution rooms fully active; continuous hardware modernization and cloud layer updates tracked active through May 2026 Active / Operational 3 MW gross capacity delivering single-phase and three-phase configurations scaling up to 10 kW per enclosure
Indianapolis IN02 Data Center | US Signal Midwest Edge Compute Hub (2.5MW) 6325 Morenci Trail, Indianapolis, IN 46268 Core 300-cabinet whitespace active; continuous modular server hall optimizations and edge compute expansion tracked through May 2026 Active / Operational 2,500 kVA (2.5 MW) gross utility transformer line feed with flexible multi-density rack support
Equinix NY6: 15MW Secaucus High-Density Financial Hub 500 Plaza Drive, Secaucus, NJ 07094 Sequential modular server hall fit-outs scaling continuously to absorb expanding multi-tenant demand through 2028 Active / Expansion Phase (Tracking June 2026) 15 MW gross utility transformer capacity supporting high-density configurations up to 15 kW per rack
Meta Temple Campus: 1.2GW High-Density Texas AI Hub 4000 Block of NW H K Dodgen Loop, Temple, TX 76504 Sequential modular expansions and high-density rack staging pacing across the campus layout through 2032 Active / Under Heavy Civil Construction (Tracking June 2026) 1,200 MW gross utility allocation delivered via dedicated on-site high-voltage substations
Meitner Energy Center: Google's $14B 840MW 'Power-First' Texas Campus Pampa, Gray County and Roberts County, Texas Panhandle, USA 2028 - Q4 Active / Under Heavy Structural Construction & Piling (Tracking June 2026) 840 MW gross ultimate IT load distributed across 4 identical 210 MW buildings, supported by over 1,000 MW of dedicated on-site power infrastructure
Sweetwater AI Factory: Nvidia & IREN's 5GW Texas DSX Mega-Campus Sweetwater, Nolan County, Texas, United States 2032 - Q4 Active / Structural Civil Engineering & Substation Expansion (Tracking June 2026) Initial 1.4 GW operational cluster block scaling systematically into a long-term 5.0 GW total site utility envelope
AIB CLT-01: AIB Data Centers' 65MW AI Expansion in Charlotte Silverpark Dr, Charlotte, NC 28269, United States 2027 - Q2 Active / Shell Construction & Infrastructure Upgrades Phase (Tracking June 2026) 65 MW total utility power capacity engineered to sustain high-density compute rack configurations ranging from 30 kW up to 45 kW
Vantage Shackelford: 1.4GW Gigawatt-Scale Texas Campus Massive Consolidated Greenfield Tract, Shackelford County, West Texas, United States 2033 - Q4 Active / Civil Engineering, Grid Planning & Site Design Phase (Tracking June 2026) 1.4 GW gross ultimate utility allocation custom-built to easily sustain extreme high-density hardware configurations exceeding 100 kW per rack
CloudBurst Texas: 1.2GW AI-Native Flagship in San Marcos Master-Planned Industrial Tech Tract, San Marcos / New Braunfels Corridor, Central Texas, United States 2031 - Q4 (Estimated Finalization of Multi-Facility Giga-Campus Layout) Active / Core Civil Excavation & Structural Groundbreaking Phase (Tracking June 2026) 1.2 GW gross ultimate campus utility allocation engineered to easily sustain high-thermal-design-power (TDP) silicon configurations
Sacramento Prime SMF02 18MW Hyperscale Data Center 2407 Ak St, McClellan Park, CA 95652, United States Q2 2027 Under Construction 18 MW Dedicated Critical Power Allocation
Reno Vantage NV1 224MW Hyperscale AI Campus Tahoe-Reno Industrial Center, Storey County, Nevada, USA Q4 2028 Under Construction 224 MW Total Grid Power Allocation
Google Alabama: $1.5B Jackson County 300MW Expansion Former TVA Widows Creek Coal Plant Site, Jackson County, Northeast Alabama Projected Q4 2027 Approved / Active Expansion Phase (June 2026 Update) Workforce Scaling: Over 1,000 contract trade workers expected on-site during peak construction.
Microsoft La Porte: $1B Cloud & AI Hyperscale Expansion Expanded site along Highway 35, stretching between East 250 South, East State Road 4, and Stevens Road (Pleasant Township). Projected 2029 (Complete initial 6-building footprint) Groundbreaking Celebrated / Active Civil Construction (June 17, 2026) 250.0 MW (Incremental Phase 1 Power Contract)
Turin Management: 200MW AI Data Center at Historic Remington Arms Site 14 Hoefler Avenue, Village of Ilion, Mohawk Valley Region, Upstate New York (Famed former Remington Arms industrial footprint) 2031 Preconstruction Phase / Brownfield Cleanup Program Enrollment Active (May/June 2026) 200.0 MW Combined Ultimate Load Capacity
Project Kilby: 2.67GW AI Data Center Campus West Texas (Permian Basin) 2033 Groundbroken / Under Construction 2.67 GW total generation
Delta Forge 1: $3.6B Applied Digital AI Campus Louisiana Rapides Parish , Central Louisiana 2030 Groundbroken / Under Construction 400 MW total infrastructure capacity
Pecos: 2GW Microsoft Behind-The-Meter AI Mega-Campus Texas West Texas Energy Corridor 2031–2033 Announced / Initial Groundwork Commenced 2,000 MW (2 GW total multi-phase behind-the-meter generation blueprint)
Pecos: 2GW Microsoft Behind-The-Meter AI Mega-Campus Texas West Texas Energy Corridor 2031–2033 Announced / Initial Groundwork Commenced 2,000 MW (2 GW total multi-phase behind-the-meter generation blueprint)
Massena: 635MW Alcoa East Green Hyperscale Data Center New York Former Alcoa East Industrial Site, St. Lawrence County 2031 Under Planning Review / Environmental Permitting Phase 635 MW total master-planned grid allocation (500 MW continuous IT load capacity)
West Texas: 2.67GW Project Kilby Co-Located Natural Gas & AI Data Center Co-located industrial parcel, West Texas 2031–2033 Pre-FID / Engineering & Permitting Phase (Targeting FID Q4 2026) 2.67 GW generating footprint (Dedicated to supporting a 2.0 GW continuous IT compute load)
Texas: $101B Project Kestrel 9GW Giga-Scale AI Factory Campus Multi-Thousand Acre Greenfield Site, Sweetwater, Texas 2036+ (Long-term modular scaling across multi-year asset tranches) Pre-Construction / Substation Engineering & ERCOT Large-Load Review Phase 9,000 MW (9 GW) maximum master-planned grid capacity allocation (~7,200 MW critical compute IT load)
Texas: Microsoft Project Pecos 2GW Behind-the-Meter AI Datacenter Campus Greenfield Industrial Tract, Pecos, West Texas 2033+ Early Development / Site Civil Design & On-site Generation Permitting 2,000 MW (2 GW) dedicated on-site power envelope optimized for ~1,600 MW critical IT load
Texas: MSB Global 3GW Matrix Campus Sulphur Springs AI Hub 1,677-Acre Secured Industrial Block, Sulphur Springs (1.5 Hours East of Dallas) 2028 Phase 1 Active Structural Execution & Substation Integration 3,000 MW (3 GW) total site capacity (~2,500 MW reserved for active IT equipment clusters)
Microsoft Azure Toronto East 200MW AI Sovereign Cloud Toronto East Enterprise Zone, Ontario, Canada H2 2027 Under Active Expansion / Operational Phase 1 200 MW Dedicated High-Voltage Transmission Substation
AWS Mississippi Delta 1500MW AI Cloud Complex Madison County Industrial Corridor, Mississippi, USA H2 2030 Fully Operational / Newly Launched Phase 1,500 MW Master Planned Grid Connection via Dedicated Transmission Lines
Prime Data Centers Avondale AZ1 240MW AI Campus Avondale Digital Zone, Maricopa County, Arizona, USA Mid-2028 Fully Operational / Newly Launched Phase 1 240 MW Dedicated On-Site Substation Connected to High-Voltage Transmission
Meta Sturgeon County AI Hyperscale Campus (1000MW Capacity) Sturgeon County, near Edmonton, Alberta, Canada Q4 2031 (Scaling up to 1,800 MW) Under Construction / Development 1,000 MW total utility substation allocation
AWS Nuclear-Powered Campus: 960MW Texas Hyperscale Hub Adjacent to Comanche Peak Nuclear Power Plant, Somervell County, Texas Q4 2032 (Complete multi-building compute campus implementation) Pre-construction / Site Mobilization (Announced 2026) 960 MW total dedicated co-located nuclear power envelope
Meta Holly Ridge Campus: $50B North Louisiana AI Hub Holly Ridge Industrial Park, Richland Parish, North Louisiana, USA Q4 2033 (Complete realization of the massive multi-building infrastructure cluster) Pre-construction / Site Preparation (Announced July 2026) 1,500 MW dedicated initial active site utility substation capacity
Stack Infrastructure Stafford Technology Campus (STC Campus) 500-acre tract adjoined by landfill/light industrial zones, Stafford County, Virginia, USA 2033 (Complete realization of the 19-facility multi-sub-campus blueprint) Planned / Pre-construction Phase (Announced January 2025) 1,800 MW gross ultimate grid-connected substation capacity (6 x 300MW)
Bluebird Underground Springfield 6MW Data Center 1904 N LeCompte Rd, Springfield, Missouri, 65802, USA Ongoing active colocation licensing and modular customer load additions Operational / Active Expansion Phase 6.0 MW total on-site power capacity
Wildwood Ranch Data Center Southwest corner of S Central City Rd & W 20th St, Joplin, Missouri, 64804, USA Continuous phased timeline Permitted / Pre-Construction Phase (Rezoning Approved) 200 MW continuous site allocation
Yondr Toronto Hyperscale Data Center Campus (27 MW) Don Valley North, Toronto, Ontario Late 2026 Under Construction 27 MW Total Site Capacity
Digital Realty De Soto AI Data Center Campus Astra Enterprise Park, near W. 103rd Street and Lexington Avenue, De Soto, Kansas, USA Late 2031 (Phased commissioning across all nine delivery blocks) Active Development / Site Planning Phase 600 MW initial allocated substation capacity (designed to support scaling)
Cogent Columbus: 0.1MW 5th Street Colocation Facility 240 N 5th Street, Suite 210, Columbus, Ohio 43215, USA H2 2012 (Site currently operational at baseline design limits) Operational 0.1 MW dedicated tenant critical power
DataBank Columbus 251 Neilston Street Data Center 251 Neilston St, Columbus, Ohio 43215, USA H2 2015 (Consolidated floor layout optimized to full baseline capacity limits) Operational 2.0 MW dedicated critical utility power supply
Hackman Capital - 226 North Fifth Street Carrier Hotel 226 North Fifth Street, Columbus, Ohio 43215, USA H2 2014 (Integration of subsequent multi-suite telecom expansions and fiber entries) Operational 1.5 MW aggregate critical building service load
Expedient Upper Arlington: 1.6MW Columbus Data Hub 5000 Arlington Centre Blvd, Building 1, Upper Arlington, Ohio 43220, USA H1 2015 (Ongoing infrastructure and cloud POD density upgrades) Operational 1.6 MW critical IT power capacity (supported by 3.5 MW total generator plant)
Meta Rosemount: 300MW Minnesota AI Data Center UMore Park, near Highway 52 and County Road 42, Rosemount, Dakota County, Minnesota, USA 2028 (Phased completion of all planned data halls) Under Construction (Groundbroken Q1 2024) 300 MW gross utility substation capacity
QTS & Lancium Hall County: $10B Texas Hyperscale Hub 465-acre Lancium Clean Campus site, Hall County, Texas, USA 2031 (Phased deployment across all 11 planned data center halls) Under Development / Site Civil Works 1,000 MW total utility and on-site generation capacity
CoreWeave Denton: 250MW Texas High-Density AI Hub 1500 Spencer Road, Denton, Texas 76205, USA 2027 (Final high-density GPU hall commissioning) Operational / Phase Expansion Active 250 MW gross utility substation capacity
AWS Susquehanna: 1920MW Pennsylvania Nuclear AI Campus 1,200-acre site adjacent to Susquehanna Steam Electric Station, Salem Township, Luzerne County, Pennsylvania, USA 2032 (Final capacity ramp under long-term Talen power agreement) Active / Operational Phase & Expanding 1,920 MW gross contracted nuclear power allocation
QTS Northumberland: 720MW UK Hyperscale AI Campus 133-acre (540,000 sqm) former Britishvolt site, Cambois, Northumberland NE24, UK 2035 (Phased completion across all 10 planned buildings) Under Construction (Enabling Works & Site Remediation Active) 720 MW total allocated utility grid capacity
AWS St. Joseph County Indiana Data Center Campus Indiana Enterprise Center footprint, New Carlisle, St. Joseph County, Indiana 46552, USA 2032 (Phased commissioning across full 2.4 GW campus footprint) Active Construction & Operational Expansion 2,400 MW (2.4 GW) gross utility substation design capacity
Meta Kuna AI Data Center Campus: 325MW Idaho Renewable Hub Locust Grove Road & East Kuna Road, Kuna, Ada County, ID 83634, USA 2028 Under Construction (Interior Fit-Out & MEP Phase) 325 MW gross utility design capacity
xAI Colossus AI Data Center Megahub Former Electrolux Complex & Southaven Expansion Footprint, Greater Memphis Metro, USA 2026–2027 (Completion of 2 GW multi-building campus) Operational (Colossus 1 Live) / Active Expansion (Colossus 2 & MACROHARDRR Phase) 2,000 MW (2.0 GW) gross utility & on-site generation design capacity
Meta Rosemount Data Center Campus: 308MW Minnesota AI Hub 151 N Boone St, El Paso, TX 79905, USA Operational (5,710 sq ft whitespace active) Operational 1.0 MW facility capacity
DataBank 2100 M St DC: 2MW Network Edge Colocation Hub 2100 M St NW, Washington, DC 20037, USA Operational (16,600 sq ft active whitespace) Operational 2.0 MW gross facility capacity
Cogent Data Center - Washington, DC 2 1050 Connecticut Ave NW, Washington, DC 20036, USA Operational (16,763 sq ft active whitespace) Operational 2.0 MW facility capacity
Switch Citadel Tahoe Reno: 650MW Nevada Exascale AI Campus 1 Superloop Circle, Tahoe Reno Industrial Center, Sparks, NV 89437, USA 2028–2030 (Phased multi-building campus completion) Operational / Active Expansion 650 MW total utility design capacity
QTS Atlanta Metro Campus: 275MW Georgia Hyperscale Hub 1033 & 1025 Jefferson St NW, Atlanta, GA 30318, USA 2026–2028 (Phased expansion across full 275 MW campus) Operational / Active Expansion 275 MW gross facility utility capacity
CyrusOne Kincora Sterling: 84MW Northern Virginia Hyperscale Hub 21111 Ridgetop Circle & 21350 Pacific Blvd, Sterling, VA 20166, USA Operational (Multi-building campus expansion active) Operational / Active Expansion 84.0 MW IT load / 96.0 MW gross utility design capacity
Vantage VA1 Ashburn: 206MW Northern Virginia Hyperscale Campus 21635 Red Rum Drive, Ashburn, VA 20147, USA Active expansion across 6 campus buildings up to 206 MW Operational / Active Campus Expansion 206 MW total critical IT load
DataBank DFW3 Plano: 40MW Dallas-Fort Worth Colocation Facility 8375 Dominion Pkwy, Plano, TX 75024, USA Operational (Multi-phase expansion active) Operational / Active Expansion 40.0 MW critical IT capacity
DataBank ATL1 Midtown Atlanta: 7.1MW High-Performance Computing Hub 760 W Peachtree St NW, Atlanta, GA 30308, USA Operational Operational 7.1 MW critical IT load
STACK Infrastructure Hillsboro: 148MW Pacific Northwest Hyperscale Campus 4735 NE Starr Blvd & NE Brookwood Pkwy, Hillsboro, OR 97124, USA Operational (Phased buildouts active across campus properties) Operational / Active Campus Expansion 148.8 MW gross critical IT capacity
STACK Infrastructure TOR01 Toronto: 56MW Canadian Hyperscale Campus 3650 Danforth Ave, Scarborough, Toronto, ON M1N 2E8, Canada 2026–2027 (Delivery of TOR01B and TOR01C 24MW phases) Operational / Active Campus Expansion 56.0 MW critical IT capacity
Vantage VA2 Ashburn II: 96MW Northern Virginia Hyperscale Campus 22435 Glenn Drive, Sterling, VA 20164, USA Active expansion across 3 campus buildings up to 96 MW Operational / Active Campus Expansion 96.0 MW total critical IT capacity
Vantage Santa Clara: 152MW Silicon Valley Hyperscale Campus Hub 2820 Northwestern Pkwy (CA1) & 737 Mathew Street (CA2), Santa Clara, CA 95051, USA Operational (Phased expansions active across CA1 & CA2 facilities) Operational / Active Expansion 152.0 MW total critical IT capacity (77MW CA1 + 75MW CA2)
Equinix NY4 Secaucus: 18MW Financial Trading & Interconnection Hub 755 Secaucus Road, Secaucus, NJ 07094, USA Operational Operational 18.0 MW total critical IT capacity
Galaxy Digital Helios: 1.6GW West Texas AI & HPC Data Center Campus 984 County Road 112, Afton, Dickens County, TX 79220, USA 2031 (Target multi-phase 1.6 GW campus buildout) Under Construction / Operational Phase Expansions 1,600+ MW utility grid approval / 800+ MW critical IT load capacity
Hut 8 Beacon Point: 1GW Texas AI Data Center Callicoatte Road, Nueces County, Corpus Christi, TX 78410, USA 2028 – 2029 (Complete 1 GW Multi-Phase Ramp) Under Development / Early Construction Phase 1,000 MW Utility Interconnection / 704 MW Contracted IT Load
Nscale Ward County Texas: 1.2GW Hyperscale AI Data Center & GPU Factory Ward County, West Texas, USA 2028–2029 (Targeting 1.2GW Total Operational Footprint) Under Development / Phased Operational Rollout 240 MW Initial Phase / 1.2 GW Total Planned Campus Utility Load
Lancium Clean Campus Abilene Texas: 1.2GW Hyperscale AI Data Center & Stargate Campus Abilene, Taylor County, West Texas, USA (~1,100-acre site) 2027–2028 (Targeting full 1.2 GW footprint across 8 buildings) Under Construction / Partially Operational 200 MW Phase 1 / 1.2 GW (1,200 MW) Total Campus Capacity
QTS Phoenix Data Center Campus Arizona: 1GW Hyperscale & AI Infrastructure Footprint Multi-campus Phoenix metro footprint: 40th St Campus (Central Phoenix near Sky Harbor Airport) & Glendale West Valley Mega-Campus (Glendale, AZ) 2027–2029 (Multi-building rolling completion across Glendale and Phoenix sites) Operational / Multi-Phase Expansion Under Construction 210 MW (Central Phoenix PHX Campus) + 750 MW (Glendale West Valley Campus)
QTS Dallas Data Center Expansion: 300MW Texas Hyperscale Hub Multi-site DFW footprint: 6431 Longhorn Dr, Irving, TX 75063 & 303 Mason Rd, Wilmer, TX 75172, USA 2027–2028 (Completion of full multi-building Wilmer campus buildout) Active Operation & Multi-Phase Campus Construction 350+ MW Total Utility Interconnection (140 MW Irving + 200+ MW South Dallas Wilmer Campus)
Vantage Data Centers Salt Lake City Campus (Utah Regional Footprint) Greater Salt Lake City Metro / Utah Data Center Corridor, Utah, USA 2028–2029 (Multi-phase building expansions) Active Development & Multi-Building Campus Construction 250+ MW Total Substation Capacity
Equinix SV12x Expansion: Silicon Valley Hyperscale xScale Hub 123 Great Oaks Blvd, San Jose, CA 95119 (Great Oaks South Campus, Silicon Valley) January 2026 (Fully Operational Expansion) Operational / Fully Energized Phase Expansion ~35 MW Utility Capacity / 28 MW Critical IT Load
Google Becker Minnesota: 300MW $600M Hyperscale AI Campus Becker, Sherburne County, MN 55308, USA (Adjacent to Xcel Energy Sherco Station) 2028–2029 (Multi-building campus development) Under Development / Multi-Phase Construction Planning 300 MW Utility Power Interconnection
DataBank DFW4 Dallas Empire Central: 4MW Colocation Hub 1100 Empire Central Place, Dallas, TX 75247, United States Operational / Active High-Density AI & Hybrid Cloud Modernization Operational / Fully Commissioned Colocation Facility 4.0 MW Critical IT Power Capacity
eStruxture Montreal Campus: 100MW+ AI & Hyperscale Data Center Network Multi-site campus including 7001 Rue Saint-Jacques (MTL-2), 1350 Rue Nobel (MTL-3), and 17500 Trans-Canada Hwy (MTL-4), Greater Montreal, QC, Canada Operational / Active AI & High-Density Modernization Operational / Active Hyperscale & AI Expansion 100 MW+ Critical IT Power Capacity (Combined Campus Total)
AWS Louisa County Virginia: $11B+ Multi-Campus Hyperscale Expansion Kentucky Springs Rd & Haley Dr (Lake Anna Tech Campus) & Technology Overlay District, Louisa County, VA 23117, United States 2030–2040 (Phased delivery across multi-campus sites) Approved / Phase 1 Construction & Site Infrastructure Development ~420 MW Critical IT Power (Lake Anna Campus) / 1,000 MW+ Total Regional Footprint Potential
Aligned Data Centers PHX3 Phoenix: 150MW Hyperscale & AI Campus Greater Phoenix Metropolitan Area (Union Hills / West Valley Corridor), Maricopa County, AZ, United States 2026–2028+ (Phased delivery across technical whitespace modules) Active Construction Phase 150 MW Critical IT Power Capacity
QTS Richmond Mega Campus: 300MW Interconnection & AI Hub 6000 Technology Boulevard, White Oak Technology Park, Sandston (Henrico County), VA 23150, United States 2026–2028+ (Phased delivery across 200-acre expansion area) Operational / Active Multi-Building AI & Hyperscale Expansion Phase 238 MW Current Operational IT Power / 300 MW+ Total Masterplanned Capacity
T5 ATL3 Atlanta Data Center Campus: 217MW Hyperscale Infrastructure Lithia Springs 1546 Trae Lane, Lithia Springs, GA 30122, USA 2026–2027+ Operational / Active Hyperscale Campus Expansion 217 MW Total Design Capacity (Initial phase: ~19.8 MW)
Prime Data Centers – DFW Campus (DFW01 / DFW West) 1455–1515 Round Table Drive, Dallas, TX 75247, USA Operational Operational / Active Expansion 20 MW Total Critical IT Load
Cologix Toronto Data Center Campus: 30MW Interconnection & Scalelogix Hub Multi-facility campus across Downtown Toronto (151 Front St W, 905 King St W) & Markham (105 Clegg Rd), Ontario, Canada Operational Active Expansion Operational / Active Expansion ~35 MW Utility Power Allocation
Cologix Montréal MTL12 Data Center Expansion: Nun's Island Edge Hub 3000 Boulevard René-Lévesque, Verdun / Nun's Island, Montréal, QC H3E 1T9, Canada Operational Active Expansion Operational / Active Expansion Phase ~5 MW Utility Power Capacity Allocation
Flexential Chicago AI Data Center Campus (Franklin Park & Elk Grove Village Hubs) O’Hare Industrial Corridor, Greater Chicago Metropolitan Area, Illinois, USA Operational Active Expansion Active Expansion / Phased Development ~50 MW Total Utility Power Capacity Allocation
Flexential Denver Data Center Expansion: 22.5MW Parker High-Density Hub 15255 Compark Blvd, Parker, CO 80134, USA (17-acre site near Englewood) Operational Multi-Building Metro Network Active Expansion / Under Development 22.5 MW Utility Power Allocation for Parker Campus (~49.4 MW Total Metro Supply)
Flexential Nashville Data Center Campus: 10.6MW Enterprise Edge Hub Multi-facility footprint across 4600 Carothers Pkwy (Franklin), 425 Duke Dr, and 7100 Commerce Way (Brentwood), TN, USA Operational Active Metro Expansion Operational / Active Expansion 10.64 MW Total Utility Power Allocation
Compass Datacenters Austin Data Center Campus: Sustainable Hyperscale Hub Greater Austin Technology Corridor, Texas, USA Phased Multi-Building Rollout Active Development / Phased Campus Buildout ~50 MW – 75 MW Total Utility Power Allocation
Switch Citadel Reno Data Center Campus: 650MW Exascale Hub 1 Superloop Cir, Tahoe Reno Industrial Center (TRIC), Sparks / Storey County, NV 89437, USA Active Multi-Building Exascale Expansion (Targeting 7.2M sq ft) Operational / Active Phased Expansion 650 MW Total Secured Utility Power Capacity
Compass Datacenters Atlanta Data Center Campus: 70MW Sustainable Hub Greater Atlanta Digital Infrastructure Corridor, Georgia, USA Phased Multi-Building Rollout Active Development / Phased Campus Buildout ~70 MW Total Utility Supply Allocation
Compass Datacenters Columbus Data Center Campus: 60MW Hyperscale Hub New Albany International Business Park, Greater Columbus Metropolitan Area, Ohio, USA Operational Active Metro Expansion Operational / Active Expansion Phase ~60 MW Total Utility Power Allocation
Prime Data Centers LAX2 Los Angeles Campus: 33MW AI Hyperscale Hub 4701 South Santa Fe Avenue, Vernon, California 90058, United States Operational Active Deployment Fully Operational / Active AI & Cloud Deployment 33 MW Total Utility Power Allocation
T5 Atlanta IV Hyperscale Data Center Campus: 200MW AI Hub in Georgia Gullatt Road, Fairburn, South Fulton County, GA 30268, United States Active Multi-Building Campus Buildout Under Development / Planned Hyperscale Expansion 200 MW Secured Utility Power Allocation
eStruxture TOR-1 Toronto Data Center: Carrier-Dense High-Density Hub 151 Front St W, Toronto, ON M5J 2N1, Canada Operational Active Facility Fully Operational ~10 MW Secured Utility Power Allocation
eStruxture TOR-3 Toronto Data Center: 30MW Hyperscale & AI Hub 431 Horner Ave, Etobicoke, ON M8W 4W3, Canada Operational Active Facility Fully Operational / Active Phased Expansion 30 MW Secured Utility Power Allocation
eStruxture TOR-2 Toronto Data Center: Financial District Colocation Hub 145 King Street West, 8th Floor, Toronto, ON M5H 1J8, Canada Operational Active Facility Fully Operational ~1.85 MW Secured Utility Power Capacity Allocation
EdgeCore DFW02 Dallas Hyperscale Campus: 216MW AI-Ready Data Center Mesquite, Dallas County, Texas 75149, United States Active Multi-Building Campus Expansion Under Construction / Active Phase 1 Development 216 MW Secured Utility Power Allocation
DataBank Virginia South Campus Culpeper: 192MW Sustainable AI Hub Technology Zone Industrial Park, Culpeper, Virginia 22701, United States Active Multi-Building Campus Expansion Under Construction / Active Phase 1 Development 192 MW Secured Utility Power Allocation
QTS Phoenix 2 DC1: 210MW High-Density AI & Hyperscale Hub in Arizona 1200 N 40th Street, Phoenix, AZ 85008, United States Operational Active Building Fully Operational Hub 42 MW Secured Utility Power Allocation (DC1 Building Allocation)
QTS Phoenix 2 DC3: 42MW High-Density AI & Hyperscale Hub in Arizona 1400 N 40th St, Phoenix, AZ 85008, USA Active Multi-Phase Development Active Development / Phased Expansion 42 MW Secured Utility Power Allocation (DC3 Building Allocation)
QTS Phoenix 2 DC2: 42MW High-Density AI & Hyperscale Hub in Arizona 1250 N 40th St, Phoenix, AZ 85008, USA Operational Active Building Fully Operational Hub 42 MW Secured Utility Power Allocation (DC2 Building Allocation)
DataBank PHX2 Phoenix Sky Harbor Data Center: Carrier-Neutral Colocation Hub 615 N 48th St, Phoenix, AZ 85008, USA Operational Active Facility Fully Operational Colocation Hub 0.2 MW Secured Utility Power Allocation
Iron Mountain AZP-1 Phoenix Data Center: 41MW Sustainable Colocation Hub 615 N 48th St, Phoenix, AZ 85008, United States Operational Active Facility Fully Operational Hub 41 MW Secured Utility Power Allocation
Iron Mountain AZP-2 Phoenix Data Center: 48MW Sustainable Hyperscale Hub 615 N 48th St, Phoenix, AZ 85008, United States Operational Active Building Fully Operational Hyperscale Hub 48 MW Secured Utility Power Allocation
Iron Mountain AZP-3 Phoenix Data Center: 48MW Sustainable Hyperscale Hub 4802 E Van Buren St, Phoenix, AZ 85008, USA Operational Active Building Fully Operational Hyperscale Hub 48 MW Secured Utility Power Allocation
Iron Mountain Phoenix Campus: Sustainable Hyperscale & Enterprise Hub in Arizona 615 North 48th Street & 4802 East Van Buren Street, Phoenix, AZ 85008, United States Active Multi-Building Operational & Expansion Campus Fully Operational Campus with Active Multi-Phase Expansion 125+ MW Total Secured Utility Power Allocation across the campus
Switch Las Vegas AI Factory 1: Exascale High-Density AI Data Center 7135 S Decatur Blvd, Las Vegas, NV 89118, United States Active Development Building Active Development / Under Construction 40 MW to 60+ MW Secured Utility Power Allocation (Building Allocation)
EdgeCore PHX04 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona EdgeCore 3856 S Everton Terrace 85212 Mesa Arizona, USA Active Multi-Phase Development Active Development / Phased Buildout 100 MW Secured Utility Power Allocation (PHX04 Building Allocation)
EdgeCore PH05 Data Center: High-Density AI & Hyperscale Hub in Mesa, Arizona 3856 S Everton Terrace, Mesa, AZ 85212, USA Active Multi-Phase Development Active Development / Phased Buildout 100 MW Secured Utility Power Allocation (PH05 Building Allocation)
EdgeCore PH03 Data Center: 72MW High-Density AI & Hyperscale Hub in Mesa, Arizona 3856 S Everton Terrace, Mesa, AZ 85212, United States Operational Active Facility Fully Operational Hub 72 MW Secured Utility Power Allocation
Meta Mesa Building 5: Hyperscale AI & Cloud Infrastructure Hub in Arizona 3841 S Ellsworth Rd, Mesa, AZ 85212, USA Active Multi-Phase Building Construction Active Development / Phased Buildout ~70 MW to 100 MW Secured Utility Power Allocation (Building 5 Allocation)